Post Job Free
Sign in

Construction Civil Engineering

Location:
Beirut, Lebanon
Posted:
January 12, 2021

Contact this candidate

Resume:

*/*

Curriculum Vitae

Name: Mohamad Rajab Rahal Date of birth: 16/9/1966

Recent Position: Projects Manager Profession: Civil Engineer Years of Experience: 27 Nationality: Lebanese

Present place of work: Danash Contracting & Trading CO. Previous place of work: Saudi Oger Ltd – KSA Education: Bachelor of Science in Civil Engineering Beirut Arab University, 1991

Member of order of Engineers and Architect in Beirut –No 13250 Address: M.R.RAHAL

Borj El Barajneh –Rahal Street

Baabda -Lebanon

Tel: +961-*-******

e-mail

******@*******.***

Languages and skills:

(Under this heading, tabulate and mark proficiency 1 to 5: 1 = basic; 5 = fluent) Reading Speaking Writing

English 5 4 4

Arabic 5 5 5

French 5 4 5

*Computer Literate (Excel, Windows, Word, MS Project, AutoCAD &Sewer CAD).

* Private Software for Sewer and Potable water networks Design.

* Experience in Claims & Compensation according to FIDIC. 2/8

*My Experience is covering but not limited the following Tasks:

- Preparation of BOQ.

- Estimating costs of Civil Works.

- Preparation & Monitoring of Schedule of work using MS project.

- Preparation of monthly or weekly Progress reports.

- Preparation of Method Statement.

- Construction & Supervision of Civil Works.

- Preparation of Material submittal request in order to get material approval from the client or the consultant (Engineer).

- Evaluate civil technical submissions.

- Project Cost Control.

- Ability to work with multi-disciplinary teams and liaison with authorities and stakeholders.

- Coordination between client, site, sub-contractors & suppliers. Negotiation of prices with subcontractors & suppliers and various project stakeholders.

-Ensure health and safety measures at the site.

- Handling the project for turnkey.

Experience Record:

I. Civil Works

Design, supervision, execution & Rehabilitation of public and private buildings, in Lebanon & Saudi Arabia, the areas of which vary between 200m2 and 40,000m2. II. Road Works

Execution and Supervision of construction of culverts, retaining walls and asphalt paving in different villages in Mount Lebanon & K.SAUDI ARABIA

Culvert 65 km

Retaining walls 40walls with heights varying between 3 and 7 meters

Paving asphalt 500 000 m2

III. Hydraulic works

A-

Execution of potable water, Reservoirs, wastewater treatment Plant, Sewer and storm water networks in different villages in Lebanon.& KSA B. Supervision on renovation of potable water and wastewater networks and construction of water tanks and pumping stations in different villages in Lebanon

Networks 300 km

Diameter of pipes varying between 20mm and 1100 mm

Type of pipes: ductile iron, galvanized steel, polyethylene, UPVC, Asbestos and cement & GRP

3/8

Tanks of volumes varying between 100m3 and 10000m3 C-

Design of potable water network in different villages in Lebanon

( 30 villages)

Study of the general layout plan for potable water and wastewater networks in Zahle district ( 42 villages).

Design of irrigation networks in different villages in Lebanon (10 villages).

Design of Sewer networks in different villages in Lebanon

(15 villages).

Design of storm water networks in different villages in Lebanon

(10 villages).

4/8

DESCRIPTION CLIENT DATE

Civil Work.

- Rehabilitation Work for 5 Public Schools

in Beirut & Mount Lebanon Governorate. CDR-Lebanon June 2020-Till Today

- Rehabilitation Work for 16 Public Schools

in Nabatiyeh Governorate. UNICEF 2016-2017

- Cultural Heritage & Urban Development

Project - TYR- Phase II . CDR - Lebanon 2014-2016

- Construction of BDL New Building Banque Du Liban 2012-2014 Block E - Hamra (BDL)

- Design-built and turnkey of

Sour Wastewater Treatment Plant CDR - Lebanon 2008-2012

- Construction of the cultural centers in

Yater, Maarakeh and Ansar

Reconstruction of war damaged areas

Saudi Grant project – Management services. CDR - Lebanon 2007-2008

(Council for Development & Reconstruction - CDR)

- Execution of the palace of Talal Ben Fahed 2005-2006 Prince Talal Ben Fahed Ben Abedl

Aziz in Riyadh- KSA

- Extension Villas on the palace of King Abdulah 2005-2006 King Abdulah Ben Adul Aziz

in Riyadh (Rawda Palace)- KSA

- Executoin of the palace of the prince Abdul Aziz Ben Fahed 2005-2006 Abdul Aziz Ben Fahed in Riyadh- KSA

- Supervision and execution of El Wakef El Islami 2002-2005 an Olympic football stadium and of Borj El Barajneh 2 schools in Mraijeh

- Supervision of a private building

(Le Daliah) in Ashrafieh

(3200 m2) Eng. G. El Hage 1998-2001

- Design, supervision and execution

5/8

of a private building in Haret Hreik

(3400 m2)

Dr. H. Rahal 1997-1999

DESCRIPTION CLIENT DATE

- Design, supervision and execution

of a private villa in Sawfar

(1500 m2) Mr. F. Jalloul 1996-1998

- Design, supervision and execution

of a private business center in

Chiah (3000 m2) Eng. S. Moawad 1994-1996

- Design, supervision and execution

of a private school “Mediterranean School”

in Airport road (4000 m2) Dr. H. Kazma 1993-1995

- Design, supervision and execution

of a private building in Aramoun

(3000 m2) Mr. A. Borghol 1992-1994

II. Road Works

DESCRIPTION CLIENT DATE

A- Execution

Execution of asphalt paving and side Borj El Barajneh walk in Borj El Barajneh Municipality &

Contract N ML/BA/09 World bank 2001-2004

DESCRIPTION CLIENT DATE

B-Supervision

Construction of culverts and retaining

walls and asphalt paving for the Central Fund of

village of Ras El Metn the Displaced 2001 -2003

Construction of culverts and retaining

walls and asphalt paving for the Central Fund of

village of Jouret Arsoun the Displaced 2000

6/8

Construction of culverts and retaining

walls and asphalt paving for the Central Fund of

village of Niha the Displaced 1999-2000

Construction of culverts and retaining

walls and asphalt paving for the Central Fund of

village of Kortada the Displaced 1999

Construction of culverts and retaining

walls and asphalt paving for the Central Fund of

village of Knayseh the Displaced 1999

Construction of culverts and retaining

walls and asphalt paving for the Central Fund of

village of Zandouka the Displaced 1999

Construction of culverts and retaining

walls and asphalt paving for the Central Fund of

village of ksaybeh the Displaced 1996

III. Hydraulic Works

A. Execution

- Execution of Sewer Networks CDR 2019- May 2020.

In El Hermel - Bekaa Lebanon

- Design and Built for the Sea Outfall

of Sour Waste Water Treatment Plant

- (S.S.O) CDR 2017- 2019

- Execution of Sewer Networks Ministry of Energy & Water 2017-2017 In Amyoun - North Lebanon

7/8

\

DESCRIPTION CLIENT DATE

- Execution of potable water network

and 2 reservoirs of capacity 10000m3

in Tyre -South Lebanon. CDR 2004-2005

- Execution of wastewater and storm water Borj El Barajneh Networks in Borj El Barajneh Municipality &

Contract N ML/BA/09 World bank 2003-2004

- Execution of adduction lines for potable Central Fund Water networks in El Maten El Ala of the Displaced 2001-2002

-Renovation of potable-water

network in Al Mesherfeh and construction Central Fund of of a water tank of capacity 500 m3 the Displaced 1999-2000 B. Supervision

Equipment works of wells in

Bhamdoun Al Daiaah and construction

of a pump station, a storage tank Central Fund of

and a water tank of capacity 500m3 the Displaced 2001 -2002 Renovation of potable-water

network in Ain Dara and construction Central Fund of of a water tank of capacity 1000 m3 the Displaced 2000-2001 Renovation of potable-water

network in Bedghan and construction Central Fund of of a water tank of capacity 500 m3 the Displaced 1999-2001 Renovation of potable-water Central Fund of

network in Sharon the Displaced 1999-2001

Renovation of potable-water

network in Deir Al Harf and construction Central Fund of of a water tank of capacity 500 m3 the Displaced 1998 Supervision of the works of execution of the

project of provisioning of some towns and villages of High-Metn, Baabda district: Kobbeih, Hilalieh,

Reweiset El Balout, Ras El-metn, Tebiat,

El khreibeh, kernayel, Marj-Kernayel, Jwar El Hawz, Kafar-Serlwan, Tarchich, Salima, El-Ksaibeh,

8/8

El-Orbanieh, El-Dlaibeh and Hasbaya by

drinkable water.

DESCRIPTION CLIENT DATE

-Works of setting up of distribution and conduct lines, construction of distribution reservoirs of 200

& 500 m3 and the works of formation

of reservoirs of capacity 2x1000 m3 in

Kartaba and of 1000 m3 int each of

El-Oueini, Wata El-Ban Mestita and Blat at

Jbeil district Ministry of Energy 1996-1998

and Water

-Execution of drinkable water works in

Ain-El Hawr and Majdalon Central Fund of

Chouf district the Displaced 1995-1996

-Works of potable water networks

and water tanks in the region of El-Harf: Central Fund of Chouf district the Displaced 1994-1995

-Construction of a collector network for Ministry of Wastewater in some villages in Bekaa Housing

1991-1994

C. Design Works

Design of irrigation networks in Sowyseh, Ministry of Energy Bouday, Ardeh, Amriyeh and Takrite and Water 2003-2004 Renovation of potable water network

and construction of reservoirs in Ministry of Energy Nabatieh and Water 2003

Renovation of potable water network

and construction of reservoirs in

Aita El-Shaab, Kfardounin, Shakra: Ministry of Energy Bent Jbeil district and Water & CDR 2002

Renovation of potable water network,

construction of a reservoir and a pump Central Fund of station in Ketermaya the Displaced 2001

Renovation of potable water network

and construction of a reservoir in Central Fund of Ain Qanyeh the Displaced 2001

Renovation of potable water network Central Fund of 9/8

and construction of a reservoir in Bater the Displaced 2001 DESCRIPTION CLIENT DATE

Construction of an adduction line

for potable water from Baaleshmieh Central Fund of to Kahlouniyeh : Baabda district the Displaced 2001 Construction of a pump station in Central Fund of

Al- Megheyrie : Chouf district the displaced 2001

Renovation of potable water network Central Fund of and construction of a reservoir in Bseba the Displaced 2000 Renovation of potable water network Central Fund of and construction of a reservoir in Boutmeh the Displaced 2000 Renovation of potable water network Central Fund of and construction of a reservoir in Batloun the Displaced 2000 Renovation of potable water network

and construction of a reservoir in Central Fund of Kahlouniyeh: Chouf district the Displaced 1999

Renovation of potable water network

and construction of a reservoir in Central Fund of Bayqoun the Displaced 1999

Construction of an adduction line

for potable water from Souk Al-Gharb

to Bshamoun, Maaroufieh, Ras Mouna, Central Fund of Deir Qoubel : Baabda district the Displaced 1999

Study of the general layout plan for

potable water r& waste water and studies

of the execution water projects of Zahlé Ministry of Energy district and Water 1996-1998

Study of an adduction line for potable Ministry of Energy Water in some villages in Jezzine district and Water 1997



Contact this candidate