Post Job Free

Resume

Sign in

Power Plant Engineer

Location:
Gandhidham, Gujarat, India
Salary:
9.5lakhs
Posted:
January 09, 2021

Contact this candidate

Resume:

t

Competencies

Project of power plant

Power plant operations

Preventive maintenance

~Predictive Maintenance

Breakdown maintenance.

Shutdown planning and performing.

~Project Execution&Commissionin ~Production Management ~Manufacturing Operations

~Client Relationship Management

Maintenance Knowledge Preview.

STEAM TURBINE & BOILER

Centrifugal Fans, Blowers, Compressors & Multi Stage Gearbox.

Crushers,Vertical Roller Mill Vibrating Screen,vibrofeeder,

Horizontal & Vertical Pumps (Centrifugal and Reciprocating)

Different Types of Valves (Gate Valve, Globe Valve, Ball Valves, Safety Valves)

Welding technology&boiler piping terminology,

Cooling Towers (crossflow and counterflow Induced Draft and forced draft)

Various heat exchangers. Cement Rotery Kiln & Great Cooler

Heavy Drag Chain Feeders Scruw feeders Bucket elevator, RAV & Belt Conveyers

Bag Filters, ESP.

Material Handling Sysstem

Personal Details

Date of Birth

15th June 1987

Languages Know

English,Hindi,gujrati,

Present Address

18, Hraday Kunj, Chitrakut Society, Chara jampa, Devli Road, Kodinar-362720

Objective

Maintenance & Operations and project of powerplant Power Systems (IR-CFBC, CFBC, AFBC,WHRB)

Enterprising leader & planner with a strong record of contributions in streamlining operations,invigorating business, heighteningproductivity and improving systems. Preferred Industry: Powerplant

Preferred Location: GUJRAT,RAJASTHAN

Profile Summary

High Performance Management Executive with 13.5 years of experience in Preventive, Predictive, Corrective, Breakdown,Shutdown Maintenance and project erection ans commissioning of Power Plants & operation of powerplant

Currently with sanghi industries as a Senior Engineer.

Hands-on experience in supervising operation & maintenance projects and power plant systems for efficient production of end products

Implementing various quality standards & techniques for improving the project operations of Centrifugal Fans, Blowers, Compressors, Crushers and Vibrating Screen&powerplant equipments.

Competent in working in a team, maintaining peacefrul & amicable work environment in the organization, and initiating measures for the benefit of people in the organization

Understanding of design activities involving resource planning, in-process inspection, team building and co-ordination with all departments

An ambitious & hardworking individual with excellent relationship management skills and the capability to manage time effectively.

Education

S.S.C from G.S.E.B Gandhinagar with 74.71% in 2002

H.S.C FROM G.S.E.B Gandhinagar with 48% in 2004

Diploma in Mechanical Engineering From L.E.College with 67% in oct 06

B.E . Mechanical Engineering from Anna university 68% in july 2010.

Employment Details

Working as Sr Engineer in Sanghi Industries Ltd from 1st January 2018 to Till Date.

15 MW WHRS (10000 TPD KILN) POWER PLANT

EQUIPMENT

MAKE

CAPACITY

WHRS BOILER

CHINA

1*48T 1*19T 1*13.8 (13.5 KSC) (AQC,PH,ABP BOILER)

STEAM TURBINE

HCTC (fully Cond.)

1*15 MW

D M PLANT

CHRUN POWER

1*10 M3

ROLE AND RESPONSIBILITIES

1) Responsible of project monitoring supervision on equipment installation and commissioning,

2) Carry out all testing activities through out all stages of commissioning

3) Supports continues improvement efforts with implement and improment.

4)Check the supports of all boilers, ACC and steam turbine and generator.

5)Responsible for providing preventive and predictive maintenance of various equipment whrs

6) Carry out pre-commissing activities of turbine like steam blowing condenesor test throttle valve seetting and bearing clearance, float, dump of rotor.

8)Prepare shutdown jobs, planning,budjet through out the year of all equipment

9)Keep track of all equipment spares in local store

Dec-15 to Dec -17 with Reliance Limited, Bharuch as a Engineer

Equipmnet

Make

Capacity

CFBC (IR) BOILERCFBC (IR) BOILER

Thermax

4*500TPH/121KSC

Steam turbine

BHEL

3*90MW

DM WATER PLANT-1

MS PARAMOUNT

4*3000M^3/DAY/CHA

DM WATER PLANT-2

THERMAX LTD

4*350^3/HR/CHAIN

R0 WATER PLANT

WATECH WABAG

1994M^3/HR

ROLE AND RESPONSIBILITIES

Monitoring and improving powerplant maintenance process and personnel performance to achive enhanced level of efficiency,

Responsible and coordination of small and big maintenance activities,shutdown jobs as per operation dept clearance.

Planning to work with respect to material manpower and machinery,

Taken mechanical clearance with operation shift engineer and perform the task

Execute hydrotest of boiler after competing of shutdown procedure,

Ensure permit to work compliance,approprioate job safety analysis and ensure that all equipment meet required safety specification and standard

Ensuring smooth running of plant and various equipment.

Taken operation clearance and coordinate with shift incharge for maintenennce of equipment.

Perform toolbox talk before each and every job start .

Training (RELIANCE INDUSTRIES)

TBT,JSA,PTW,Confined space, First Aid Training .Hazwoper,

Dec’11 - Dec’15 with Thermax India Ltd., (SCL) As Maintanance Eng.

Equipment

Make

Capacity

CFBC (IR) Steam Boiler

Thermax

110 TPH/88 ksc

Steam Turbine

T.D.P.S.

25 MW

D.M. Water Plant

Thermax

7M3/HR

Role & responsibility

Scheduling and planning of predictive maintenance of plants during operation cycle and major overhauling in different quality and safety.

Coordinaton with all with all upstream and downstream process units/plants for smooth plant operation to avoid upsets.

Responsible for continuous field visit so as identify any field abnormalities.

Pepare daily reports,consumption report, daily powercost,maintenance work report and monthly efficiency reports for boiler &turbine.

In the event of any incident,evaluts the route causes and determine remedial actions and involves as operation engineer.

Hydro test of boiler and high pressure equipments.(as per ibr norms)

Conducting tubethickness of boiler tubes during shutdown,generating report

Prepare joblist of shutdown job cards of varios equipment and take regular folloup with maintenance department for shutdown jobs.

AWARDS&CERTIFICATION

Award taken from thermax (Fighter card) for maximimum safeman hours and maximum near miss.

Skillsoft safety certificate achived( level1 and level 2) in thermax ltd.

TRAINING;

HIRA,FIRESAFETY TRAINING,OHSAS,ERP,TBT,PPE,MSDS,

Emergency preparedness/evacuation drill,Fall protection,loto

Jul’10 – Dec’11 with Nandan Exim Ltd., Ahmedabad as . Mech Engineer

Equipment

Make

Capacity

AFBC Steam Boiler

C.V.P.L.

2X 70 Th/89Ksc

Steam Turbine

Nanging (China)

25 MW

D.M. Water Plant

Triveni

50 M3/HR

ROLE:

Ensuring periodic and preventive maintenance are appropriately scheduled & accomplished and emergency troubleshooting & maintenance support are readily available.

Analyse breakdowns diagnose faults and supervise time critical equipment.

Setting up monthly/weekly reviews to ensure proper tracking of activities and ensuring discipline in execution.

Review the deficiency noted during preventive maintenance.

Close monitoring of hot jobs,vessel entrypermit,confined space. entry,

Oct’06 – Jul’10 with Electrotherm (I) Ltd., Samkhyali (Kutch) as Mechanical Engineer

Equipment

Make

Capacity

AFBC Steam Boiler

C.V.P.L.

2X65 Tph/66.5 ksc

W.H.R.B.

C.V.P.L.

2X28.5 Tph/66.5 ksc

Steam Turbine

H.T.C.(China)

30 MW

D.M. Water Plant

Thermax

9 M3/HR

ROLE;

Make a report of daily preventive maintenance jobs,inventory and consumption of spares.

Maintain vibrationlogsheet,lubrication schedule,and prepare report of shut down jobs.

COMMISSIONING ACTIVITIES

Took part in commissioning of WONDER CEMENT Powerplant ( rajasthan)

BOILER MAKE CAPACITY

(IR-CFBC) THERMAX 160TPH

TECHNICAL RESPONSIBILITIES;

1) checking of windboxsupport,bubblecap and its alignment for proper operation

2)Checking superheatercoils,economiser coils,u-beam snapgaps and its Support as per p&I drawing

3) Commissioning of All boiler drives like SA FAN,PA FAN,ID FAN,Signed a protocol of drives

4)Familier with safety valve setting,floating with desired pressure,

5) Planning of manpower resourses with required tools,consumable to carryout erection and commissioning activities.

6) installation for supports (guide,rest,anchor) and fabrication and erection of all spools.

Also take part in RELIANCE INDUSTRIES LTD (Dahej) & SANGHI INDUSTRIES LTD in a Erection & Commissioning.

BOILER MAKE CAPACITY

IR-CFBC THERMAX 500TPH

(WHRS BOILER) (HONGZOU) (82 TPH)

TECHNICAL RESPONSIBILITIES

1) Inspection of boiler as per P&I drawing

2) Monitering with piping related activities in coordination with client.

3) Supervise all pre-commissioning and start up activities of equipment

4) Inspection before and during welding,confirm electodes,preheating.

Checkout all systems within commissioning schedule .

1Assist operational group with commissioning activities such as preparing systems for flushing,testing, and blowing.hydrotest and pneumatic test.

2Participate and follow company HSE requirement as far as applicable to work activities.

3Prepare and establish a punch pointlist tracking system for deficiencis found during commissioning and pre commissioning activities.

4Submit daily and weekly activities report to concern department.

Your truly

Vijaysinh jadav

Vijaysinh.D. Jadav

Contact: +91-756*******

E-Mail: adjazw@r.postjobfree.com

Photo



Contact this candidate