Post Job Free
Sign in

Material planner

Location:
Delhi, India
Salary:
Negotiable
Posted:
January 09, 2021

Contact this candidate

Resume:

**********@*****.***

Professional

Summary

Skill

s

I am a competent professional with very long experience of 20+ years in factory work in various locations. I am looking for a position in a firm where I can use my skills to their full potential.

An out-of-the box thinker with

sound product knowledge and

thorough understanding of product

dynamics.

Here is a brief description of what I have been doing with some of my key responsibilities: Create & maintain Business plan yearly considering sales requirement & maximum utilization of available resources.

Schedule and information three month production Plan as per current scenario and requirement of sales.

Manage JIT supply material to survive on line mass production with robust follow up. To Know new BOM in SAP & align the require material as per BOM. MRP run understanding & Scheduling to vendors.

To know forecast Plan & production orders, Analyse and align with Production capacity. Manage SOB and analysis during high demand and sudden change requirement with help of GIS team.

Manage & control obsolescence of material during change over new parts. Maintain hand over and records more than 200 parts list from Regional procurement. Manage and resolve day to day issues and problems at plant level with CFT. Mentoring the trainees engineers Existing system & processes and interaction to new ideas and innovation.

Implementing new projects in systems as per WCM.

Tracking & monitoring of raw material supply from Sub vendors also like ABS GPP. Monitoring & control Inventory norms as per management requirement. Strengthening MRP system via removing gaps in MRP system. Upgrading & Strengthening vendor portal.

Motivating, educating and

imparting comprehensive training

subordinates for creating

awareness and experience.

Sr. Executive (Factory Store), Whirlpool of India Limited. Faridabad

Dec. 2006 – Aug. 2010

Store Shift In charge.

Here is a brief description of what I was doing with some of my key responsibilities: Manage to supervise the team of 15 members to giving delivery material at the various locations in the plant.

Manage minimum stock and inventories of all required material to fulfill deliveries at various locations to users.

Distribute plan and information to all departs like paint, press, Foam, Door, Assembly lines.

Prepare and align day wise production plan as per availability & best utilization of resources.

Supporting and considering meet days target with production team. 921-***-****

Gopal Singh

Sing

Employment

history

Dy. Manager (Supply Chain Management), Whirlpool of India Limited. Faridabad, Haryana

Aug. 2010 – Jun. 2020

Can do attitude

Committed to deadlines and

schedules.

Easy build up relationships.

Sr Engineer (Production), Whirlpool of India Limited. Faridabad, Haryana

Jul. 2001 – Dec. 2006

Production Line Assembly

Here is a brief description of what I did in production department. Some of my key responsibilities are as below:

Supervision of 18 employees as a friendly and motivated team as well as individually. Deputing and nominate to work best as according their process, critical process etc. To encourage and appreciate team to work more them individually. To guide and instructions to step in the right direction with all health and safety precautions as per the factory norms.

Approach management to nominate them reward and recognition for good work done. Effort to achieve the line production target.

Awareness to operators about factory norms and expectation from organization. Manage and handle the manpower issues and resolve their concern with help of management.

Approach management to multi skill them and enhance their knowledge and experience. Learning the points of experience and apply the same at require in other situation. Celebrate the team timely for achievement on their well-done activities. Engineer (Quality Control), Whirlpool of India Limited. Faridabad, Haryana

Jun. 1990 – Dec. 2001

Process Quality (Customer Acceptance Lab).

Here is a brief description of what I did in quality department. Some of my key responsibilities as below:

Monitoring and keeping record of critical process and quality parameters like coolant charging, gas leakage detector, performance testing of the refrigerators. Manage and keep record and give feedback to the production team and alert them to take corrective action to avoid problems and take action to prevent. Analysis and prioritize the problems and deal one to one issue on the basis of team discussion or easy solutions.

To put effort and bench marking new innovations regarding new concepts in solving problems as compared to other same organisations.

Focus on customer acceptance about aesthetic quality point during selection of sample in inspection.

Updating awareness about feedback defects and finding from customers. Training and learning the production team about rout cause analysis and finding in process.

Educatio

n

Railway University Delhi

Diploma in Transportation & Economics

Manage and handle skill /none skill manpower as a team to arrange delivery to the user point.

Quick and clear communication to concern buyers and related agencies to arrange material before to finish minimum label stock of material. Analyse the day to day issues and sort out with cross functional teams like production, Quality departments.

Generate Picking list and posting in system as per issue material. Manage and keep record of return rejected and excess material to the vendors. Delivery of new and special and costly items by separate hand over system. Manage good visualization, identification of stocking like rack, flow, columns, color display in storing the material.

Maintain ISO standard format.

Highlight the issues timely and material shortages and related concerns in the group. UP Technical board

3 Year Diploma Engineering in Electrical, 67%

UP

BOARD

12th, 60%

UP BOARD,

52%

10th

Accomplishment

s

Elimination of double handling of pedestal supply on line thru trolley saving manpower 3 per day.

Implementing two bin systems on production line of material small item like leg, drier clamp, Cu tube, screw, lock ring etc.

Implementing BIN tracking system to control BIN inventory and tracking physical VS system.

Removal of polythene in packaging of plastic parts. Managed usage of parts in set and avoid obsolescence during blue tint color change over.

Saving time in vehicle movement of reducing work content of gate entry time on material gate.

Manage fulfill demand of high requirement of pedestal by effort day night working. Transportation cost saving --- Thru centralized and managed third party resources at the robust tracking of vehicle moving by using GPS systems. Reduced inventories costs --- elimination of NVA like feeding on line material, pulling system on demand material, demand big and colored material in sequence Kitting usage of plastics parts saving in multi handling and manpower into supplying various stations.

COMPUTER

PROFICIENCY

SAP PP & MM module.

Microsoft Word, Excel & Power point.

Personal

Information

Father's Name - Raghunath Singh

Date of Birth – 05th July 1966

Nationality – Indian

Marital Status – Married

Languages Known - English, Hindi

Address - E39-01-GF, BPTP Park Elite Floors,Sector 85, Faridabad, 121002 Sikkim Manipal

University

MBA, Operations and Material



Contact this candidate