Hayduck Engineering/NV*, Thruway Authority; Improvement of Exit 10 at Interstate 87 near Tappan Zee Bridge. The project consists of making new Exit ramps, jogging track (Esposito trail), bicycle lane. The project includes retaining Tee walls, concrete base, binder course 2” top asphalt, piling, wood lagging walls, storm water drain system, LED lights, conduit along the jogging track and Bicycle lane. My responsibility is to inspect the job according to specifications by HNTB/Thruway authority and I.R etc. RE Kenneth Jaccuse 516-***-****) Nov 2018 – June 2019 CERTIFICATIONS
NICECT- LEVEL ll
ACI Field Testing Grade 1
Technician Certification
NYC DDC- Watermain Training
30 Hrs. OSHA; Cert
OSHA for Lead Abatement Lead
Awareness Certification
Site Safety Manager Certificate
Scaffold & Ladder Certification
OSHA Health Certification
EDUCATION
Bachelors in Civil Engineering,
Mehran University, Pakistan•
B.S Physics, Karachi University
ARSHAD WASI
CONSTRUCTION INSPECTOR
SUMMARY
Senior Inspector with over four (5) years of experience in the field Construction in Water Main, Sewer, Catch Basin, Storm Water Main, Roadway, Curbs, Sidewalk and other Appurtenances in the NYC DEP projects and other city agencies. And has more than 25 years of oversees experience working with KAR DOT, DDC in projects involving installation of distribution of water main of various sizes, sanitary & storm sewer of various sizes in New York. As well as construction of bridges and buildings in Karachi Pakistan along with other apprentices
PROJECTED EXPERIENCE
JED Engineering PC, DDC project ID SEQ002714; The Project consists of replacement of old water mains with new 8” watermain and laying 18’’ 23’ deep sanitary sewer at 150th ave, 126th st 127th st, 128th st & 129th st near JFK, Queens. Project consists of house connections of water, sanitary sewer and storm water system, catch basins, shoots. Connecting all to the existing 72” dia interceptor. Sanitary sewers consist of dewatering wells, video inspection of existing interceptor, sedimentation tank. After completion of all network, restoration of area is done which consists of binder, 2” top asphalt, repair of sidewalks, curbs etc. My duty is to inspect the project according to the DDC specification and MPT plan, making I.R, sketch sheets, calculation sheets, fixed assets etc.
PM Waleed Mohmud 718-***-****) July 2019 – Till Date wasiengineer06@gmail
PH : 347-***-****
ENTECH Engineering PC - NYCDEP, Storm water drainage improvement project in Queens and Brooklyn. Duties included inspection of new Catch Basin replacement, remodeling of old Catch Basin. The project consisted of Wet Sawcut, laying of new shoots, back filling, compaction, base concrete, asphalt top layer and side walk reconstruction, curbs, ped ramps for disables/pedestrians. Preparing daily report, Site completion report, As built drawing. Maintain site safety, maintain traffic and ensuring that MTP plans were implemented. PM Jasmin 516-***-****) October 30,2017 – June 25,2018 NV5/RBA Group-NYCDEP, Build it Back Sewer and watermain connections in the borough of Brooklyn, Queens and Staten Island, NY. Construction Inspector. Project involved rehabilitation of areas affected by Super Storm Sandy. Duties included inspection of sewer and water services installation as per NYC DEP specification including section of NYC water main and Sewer main replacement. Sewer services were installed on concrete cradles/ encasement, performed various concrete tests as per ACI standards. Prepared field cards, tap cards, sewer service cards, along with daily inspector reports. Maintained Site safety and ensured that MPT plans are implemented. RE Muhammad Farooq Amray 646-***-****) Sep 2016 – May 2017 S & P Construction – MTA Bus Vertical Platform Lift, East New York Depot Construction Inspector. The project was bout installations of MTA Bus Platform lift at 25 Jamaica Ave Yard. It consisted of wet sawcut, removal of concrete floor, abatement, concreating in rebar form work, installation of bus lift with electrical controls. Conducted Site specific Safety and Orientation, meetings, Weekly Tool Box Meetings, Site Safety Supervision, Co-ordination between all Subs to follow sequence of work, quality workmanship and safety guide lines, reviewed safety reports, prepared Daily Reports, Daily safety checklist, Updated Submittal and RFI Log, Daily safety checklist, Attended Change order and Progress Meetings, Scheduled organized and attended Operational/Maintenance training, timely completion of project utilizing good time management, Managed & Organized Full set of Approved Submittals, RFl's, and SDS Sheets, Prepared Red Line (As Built Drawings). Mr Sohail-917-***-****) - March 2015 - Aug 2016 Project Manager/Owner of Wasi Brother Company. Construction of two prestressed bridges, pile foundations and construction remodeling of multiple housing complexes in Karachi, Pakistan. Responsibilities included: Cost estimation for bidding purposes, contract administration, coordination with clients and other agencies, coordination with subcontractors and utilities companies, ensured project's on-time and within budget completion. Prepared Project Baseline Schedule and submitted monthly updates to the Client. Generated Request for Information (RFl's) for clarification and further information, involved in shop drawing submissions for approval from the client. Supervised In-House Quality Assurance to ensure that material used in the construction should be in compliance with contract House Quality Assurance to ensure that material used in the construction should be in compliance with contract requirements. Supervised land development work which included installation of water, sewer, gas and electricity lines. Catch basins were installed to address drainage issues. Projects involved extensive excavation and disposal. Also handled disposal of hazardous waste. supervised construction of internal access roads, primarily with flexible pavement which included placement of base, sub-base, and bituminous concrete. Sidewalk and curb were installed. All housing developments were with reinforced concrete construction, in strict compliance with ACI and other applicable construction codes were followed. Involved with architectural, electrical, plumbing and HVAC plans. 1986-2012