Post Job Free

Resume

Sign in

Experienced Civil Engineer

Location:
Kolkata, West Bengal, India
Salary:
150000 per month
Posted:
February 17, 2021

Contact this candidate

Resume:

*

Applied Position

QA/QC Engineer

*

Name

MANABENDRA BHATTACHARYYA

3

Present Employer

DEVELOPMENT CONSULTANTS PRIVATE LTD

4

Date of Birth

23.08.1969

5

Nationality

Indian

6

Contact No

858-***-****

7

Email ID

adj8nj@r.postjobfree.com

8

EDUCATION

Sl no

College/University

Degree Obtained

Year of Passing

(i)

Jadavpur University of Kolkata, India.

Bachelor of Civil Engineering

1990

9

Membership of Professional Associations

Member - Institute of Engineers India. MIE No. M127503

10

Other Training

3rd Year Vacational Training on construction of Cable Stayed 2nd Hooghly River Bridge from HRBC.

11

Countries of Work Experience

India and Saudi Arabia

12

Languages

Language

Speaking

Reading

Writing

Bengali

Excellent

Excellent

Excellent

Hindi

Excellent

Good

Fair

English

Excellent

Excellent

Excellent

13

Employment Record

From:(Month/Year)

To (Month/Year)

(i)

September’ 1994

Till date

Employer

Development Consultants Private Ltd

24 park Street, Kolkata-700016. India.

Position Held

DGM – Project Management

(ii)

July’ 1990

August’ 1994

Employer

Stewarts & Lloyds of (I) Ltd

41 Chowringhee Road, Kolkata-700071.

(A Construction Firm)

Position Held

Site Officer

12

Detailed Tasks Assigned

1) Assistance in preparation of detailed Project report with help of concerned Design/Engineering Cell.

2) Project Cost : preparation of BOQs, cost estimation etc.

3) Co-ordination with Project Owners/Design Engineers to finalize Project Design scheme.

4) Monitoring Site Activities with respect to the master and latest approved schedules, identifying likely delays and necessary correction measures.

5) Review adequacy of all Contractors’ resources for adequacy of manpower and availability of special tools/equipment for site work.

6) Construction Management & supervision of work.

7) Monthly/fortnight/Weekly Construction Progress Reports covering current Construction Status, deviations from approved schedules and recommend remedial measures to be initiated.

8) Review and recommendation on any extension of schedule or changes requested by contractor, and assist if requested in assessing the impact to the project.

9). Contract Management – Avoiding Extra claims, delays in Ordering/Design & Engineering/ in Contractors’ mobilization etc

10) Ensuring Quality Control and Assurance by the Contractors.

11) Certification of Contractors’ bills

12) Preparation of Punch List & its liquidation

13) Closing of all Contracts

14

Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

i)

Name of assignment/job or Project

Semi-Dry FGD project for existing 6x150 MW CPP of Aditya Aluminum Plant of Hindalco Industries Ltd at Lapanga.

Year

From January’21 till date.

Location

Lapanga, dist-Sambalpur, Odisha.

Position Held

Construction Manager (Civil).

ii)

Name of assignment/job or Project

HO Based Project Monitoring of various project sites, review & approval of various technical project documents etc.

Year

March’20 to Dec’20.

Location

Salt Lake, Kolkata office.

Position Held

DGM – Project Management

iii)

Name of assignment/job or Project

Cost Estimation Job of pending Civil & Structural work of Unit-3 & 4 (2 x 660 MW) Power Plant Project of Odisha Power Generation Co at Banaharpalli, Jharsuguda, Odisha.

Year

April’19 to February’ 20

Location

HO Based Job at Kolkata office.

Main Project Features

Steam Turbine Generators, Boilers, ESP, Chimney, Water treatment plants & pump houses, CW Pump Houses, Coal & Ash handling plants, 400kv Switchyard, Fuel Oil handling system, ETP, Roads & Drains etc.

Position Held

DGM – Project Management

Activities performed

Quantity Estimation and Pricing of pending jobs as per CPWD/OPWD rates.

(iv)

Name of Assignment or Project

2x1.2 MTPA Cement Clinker and Slag grinding unit of JSW Cement Ltd.

Duration

July’ 2016 to March’ 2019

Location

Salboni, West Midnapur, West Bengal. India.

Position Held

Construction Manager

Main Project features

Roller Press foundation & building, Cement Mill Hoppers, Packing Plant, Stacker/reclaimer, Wagon tippler, Switchyard, conveyors, Clinker storage silo, misc etc.

Activities performed

Construction supervision, review & certification of Contractor’s Invoices, progress monitoring, progress reporting, preparation of BOQs & estimates, updating work programs in excel bar charts etc.

(v)

Name of Assignment or Project

6x150 MW Captive Thermal Power Plant –Aditya Aluminium Project of Hindalco Industries Ltd.

Year

Jan’2011 to June’ 2016

Location

Lapanga, Odisha. India.

Position Held

Construction Manager

Main Project features

Six units of Steam Turbine generators, Boiler, ESP, Draft Fans etc and 2 no 275 m high tri-flue RC Chimneys, River Intake Pump house, Plant water reservoir, RW Pump House, Water Pre-treatment plant, DM Plant, Fuel handling system, Coal & Ash Handling plants, 220 kv Switchyard, CW Pump house, Roads & Drains etc.

Activities performed :

overall supervision, QC, Progress monitoring as per plan, generating progress report indicating areas of concern and remedial measure to arrest the backlog, if any, attending progress review meeting, coordination with Client, Contractors and DCPL design dept., review and approval of Field Quality Plan and maintain record for quality compliance by the Contractor as per FQAP, Clarification in drawing and Specification, Interpretation of Contract and ensure compliance of all activity by the contractor as per contract for the Project work.

(vi)

Name of Assignment or Project

2 x 250 MW (5th& 6th Unit) Santaldih Thermal Power Station of West Bengal Power Development Corporation Ltd

Year

Sept’ 2005 to Dec’ 2010

Location

Santaldih, dist-Purulia, West Bengal. India.

Position Held

Resident Engineer

Main project features

River Intake Pump house with Approach Bridge, BTG area with Boiler, Steam Turbines, Mill Building, ESP, Chimneys, draft Fans, Water reservoir, RW Pump House, Clarified water reservoir & Pump House, WTP, DM plant, ETP, Coal handling plant, Ash handling plant, Ash recovery pump house etc.

Activities performed

review of work progress with respect to approved Project schedule, progress monitoring, progress reporting, conducting review meetings, co-ordination with Design team/Client/ EPC vendors, etc.

(vii)

Name of Assignment or Project

3x368MW Oil Fired Shoaiba Power Plant of Saudi Electric Company – Western Region

Year

Sept’ 2004 to August’ 2005

Location

Jeddah, Kingdom of Saudi Arabia

Position Held

Field Engineer (Civil)

Main project features

BTG area, HFO/CO Tank Farm area, FO Pump House, Sea Water Intake Channel & Pump House, RCC Hot water discharge duct to Sea, Chimney, Desalination plant, DM Plant, Pipe Rack, 380 kV GIS Sub-station etc

Activities performed

Responsible for Construction Supervision and Quality Control for Civil work of the Project.

(viii)

Name of Assignment or Project

Gariahat Flyover & At-grade Improvement Project (CTID Package-II). Owner : HRBC (GOWB). Client – Yachiyo Engineering Corporation.

Year

May’ 2000 to August’ 2004

Location

Gariahat, Kolkata

Position Held

Site Inspector cum QS

Main project features

700 M long steel cum RCC Deck Flyover with Piling, At Grade Improvement with PQC & bituminous Roads/drains/footpath, Diversion of existing Utilities etc.

Activities performed

responsible site supervision of construction work, QA/QC, review & certification of all Bills of civil works, Extra Claim settlement with RateAnalysis etc.

(ix)

Name of Assignment or Project

1 x 30 MW CPP for Bihar Caustics and Chemicals Ltd (Hindalco)

Year

Jan’ 1999 to April 2000

Location

Garwa Road, Palamudist, Jharkand.

Position Held

Area Resident Engineer (Civil)

Main project features

Civil and Structural Steel work of Power House Building including TG foundation, Auxiliary foundations of Power House Building, Cooling Tower, Transformer foundations etc.

Activities performed

responsible for construction supervision, quality control, Progress monitoring and Checking of Contractors bill.

(x)

Name of Assignment or Project

655MW Gas Based Dual Fuel Combined Cycle Power plant of Gujarat Torrent Energy Corporation

Year

Jan’ 96 to Dec’98

Location

Paguthan, Bharuch, Gujarat

Position Held

Construction Engineer (Civil)

Main project features

Gas Turbine Building, Steam Turbine building, Air Intake, HRSG, Stack, 220/400 kv Switchyard, Water reservoir, Pump house, WTP, DM Plant, Napta Storage tank farm area, Gas conditioning, CW Pump house, Natural Draft Cooling Tower etc.

Activities performed

responsible for construction supervision, quality control, Progress monitoring and Checking of Contractors bill for etc