Applied Position
QA/QC Engineer
Name
MANABENDRA BHATTACHARYYA
3
Present Employer
DEVELOPMENT CONSULTANTS PRIVATE LTD
4
Date of Birth
23.08.1969
5
Nationality
Indian
6
Contact No
7
Email ID
adj8nj@r.postjobfree.com
8
EDUCATION
Sl no
College/University
Degree Obtained
Year of Passing
(i)
Jadavpur University of Kolkata, India.
Bachelor of Civil Engineering
1990
9
Membership of Professional Associations
Member - Institute of Engineers India. MIE No. M127503
10
Other Training
3rd Year Vacational Training on construction of Cable Stayed 2nd Hooghly River Bridge from HRBC.
11
Countries of Work Experience
India and Saudi Arabia
12
Languages
Language
Speaking
Reading
Writing
Bengali
Excellent
Excellent
Excellent
Hindi
Excellent
Good
Fair
English
Excellent
Excellent
Excellent
13
Employment Record
From:(Month/Year)
To (Month/Year)
(i)
September’ 1994
Till date
Employer
Development Consultants Private Ltd
24 park Street, Kolkata-700016. India.
Position Held
DGM – Project Management
(ii)
July’ 1990
August’ 1994
Employer
Stewarts & Lloyds of (I) Ltd
41 Chowringhee Road, Kolkata-700071.
(A Construction Firm)
Position Held
Site Officer
12
Detailed Tasks Assigned
1) Assistance in preparation of detailed Project report with help of concerned Design/Engineering Cell.
2) Project Cost : preparation of BOQs, cost estimation etc.
3) Co-ordination with Project Owners/Design Engineers to finalize Project Design scheme.
4) Monitoring Site Activities with respect to the master and latest approved schedules, identifying likely delays and necessary correction measures.
5) Review adequacy of all Contractors’ resources for adequacy of manpower and availability of special tools/equipment for site work.
6) Construction Management & supervision of work.
7) Monthly/fortnight/Weekly Construction Progress Reports covering current Construction Status, deviations from approved schedules and recommend remedial measures to be initiated.
8) Review and recommendation on any extension of schedule or changes requested by contractor, and assist if requested in assessing the impact to the project.
9). Contract Management – Avoiding Extra claims, delays in Ordering/Design & Engineering/ in Contractors’ mobilization etc
10) Ensuring Quality Control and Assurance by the Contractors.
11) Certification of Contractors’ bills
12) Preparation of Punch List & its liquidation
13) Closing of all Contracts
14
Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned
i)
Name of assignment/job or Project
Semi-Dry FGD project for existing 6x150 MW CPP of Aditya Aluminum Plant of Hindalco Industries Ltd at Lapanga.
Year
From January’21 till date.
Location
Lapanga, dist-Sambalpur, Odisha.
Position Held
Construction Manager (Civil).
ii)
Name of assignment/job or Project
HO Based Project Monitoring of various project sites, review & approval of various technical project documents etc.
Year
March’20 to Dec’20.
Location
Salt Lake, Kolkata office.
Position Held
DGM – Project Management
iii)
Name of assignment/job or Project
Cost Estimation Job of pending Civil & Structural work of Unit-3 & 4 (2 x 660 MW) Power Plant Project of Odisha Power Generation Co at Banaharpalli, Jharsuguda, Odisha.
Year
April’19 to February’ 20
Location
HO Based Job at Kolkata office.
Main Project Features
Steam Turbine Generators, Boilers, ESP, Chimney, Water treatment plants & pump houses, CW Pump Houses, Coal & Ash handling plants, 400kv Switchyard, Fuel Oil handling system, ETP, Roads & Drains etc.
Position Held
DGM – Project Management
Activities performed
Quantity Estimation and Pricing of pending jobs as per CPWD/OPWD rates.
(iv)
Name of Assignment or Project
2x1.2 MTPA Cement Clinker and Slag grinding unit of JSW Cement Ltd.
Duration
July’ 2016 to March’ 2019
Location
Salboni, West Midnapur, West Bengal. India.
Position Held
Construction Manager
Main Project features
Roller Press foundation & building, Cement Mill Hoppers, Packing Plant, Stacker/reclaimer, Wagon tippler, Switchyard, conveyors, Clinker storage silo, misc etc.
Activities performed
Construction supervision, review & certification of Contractor’s Invoices, progress monitoring, progress reporting, preparation of BOQs & estimates, updating work programs in excel bar charts etc.
(v)
Name of Assignment or Project
6x150 MW Captive Thermal Power Plant –Aditya Aluminium Project of Hindalco Industries Ltd.
Year
Jan’2011 to June’ 2016
Location
Lapanga, Odisha. India.
Position Held
Construction Manager
Main Project features
Six units of Steam Turbine generators, Boiler, ESP, Draft Fans etc and 2 no 275 m high tri-flue RC Chimneys, River Intake Pump house, Plant water reservoir, RW Pump House, Water Pre-treatment plant, DM Plant, Fuel handling system, Coal & Ash Handling plants, 220 kv Switchyard, CW Pump house, Roads & Drains etc.
Activities performed :
overall supervision, QC, Progress monitoring as per plan, generating progress report indicating areas of concern and remedial measure to arrest the backlog, if any, attending progress review meeting, coordination with Client, Contractors and DCPL design dept., review and approval of Field Quality Plan and maintain record for quality compliance by the Contractor as per FQAP, Clarification in drawing and Specification, Interpretation of Contract and ensure compliance of all activity by the contractor as per contract for the Project work.
(vi)
Name of Assignment or Project
2 x 250 MW (5th& 6th Unit) Santaldih Thermal Power Station of West Bengal Power Development Corporation Ltd
Year
Sept’ 2005 to Dec’ 2010
Location
Santaldih, dist-Purulia, West Bengal. India.
Position Held
Resident Engineer
Main project features
River Intake Pump house with Approach Bridge, BTG area with Boiler, Steam Turbines, Mill Building, ESP, Chimneys, draft Fans, Water reservoir, RW Pump House, Clarified water reservoir & Pump House, WTP, DM plant, ETP, Coal handling plant, Ash handling plant, Ash recovery pump house etc.
Activities performed
review of work progress with respect to approved Project schedule, progress monitoring, progress reporting, conducting review meetings, co-ordination with Design team/Client/ EPC vendors, etc.
(vii)
Name of Assignment or Project
3x368MW Oil Fired Shoaiba Power Plant of Saudi Electric Company – Western Region
Year
Sept’ 2004 to August’ 2005
Location
Jeddah, Kingdom of Saudi Arabia
Position Held
Field Engineer (Civil)
Main project features
BTG area, HFO/CO Tank Farm area, FO Pump House, Sea Water Intake Channel & Pump House, RCC Hot water discharge duct to Sea, Chimney, Desalination plant, DM Plant, Pipe Rack, 380 kV GIS Sub-station etc
Activities performed
Responsible for Construction Supervision and Quality Control for Civil work of the Project.
(viii)
Name of Assignment or Project
Gariahat Flyover & At-grade Improvement Project (CTID Package-II). Owner : HRBC (GOWB). Client – Yachiyo Engineering Corporation.
Year
May’ 2000 to August’ 2004
Location
Gariahat, Kolkata
Position Held
Site Inspector cum QS
Main project features
700 M long steel cum RCC Deck Flyover with Piling, At Grade Improvement with PQC & bituminous Roads/drains/footpath, Diversion of existing Utilities etc.
Activities performed
responsible site supervision of construction work, QA/QC, review & certification of all Bills of civil works, Extra Claim settlement with RateAnalysis etc.
(ix)
Name of Assignment or Project
1 x 30 MW CPP for Bihar Caustics and Chemicals Ltd (Hindalco)
Year
Jan’ 1999 to April 2000
Location
Garwa Road, Palamudist, Jharkand.
Position Held
Area Resident Engineer (Civil)
Main project features
Civil and Structural Steel work of Power House Building including TG foundation, Auxiliary foundations of Power House Building, Cooling Tower, Transformer foundations etc.
Activities performed
responsible for construction supervision, quality control, Progress monitoring and Checking of Contractors bill.
(x)
Name of Assignment or Project
655MW Gas Based Dual Fuel Combined Cycle Power plant of Gujarat Torrent Energy Corporation
Year
Jan’ 96 to Dec’98
Location
Paguthan, Bharuch, Gujarat
Position Held
Construction Engineer (Civil)
Main project features
Gas Turbine Building, Steam Turbine building, Air Intake, HRSG, Stack, 220/400 kv Switchyard, Water reservoir, Pump house, WTP, DM Plant, Napta Storage tank farm area, Gas conditioning, CW Pump house, Natural Draft Cooling Tower etc.
Activities performed
responsible for construction supervision, quality control, Progress monitoring and Checking of Contractors bill for etc
CURRICULUM VITAE (CV)