Post Job Free
Sign in

B pressure, structural, tank and ship Rig Welder

Location:
Edmonton, AB, Canada
Posted:
February 16, 2021

Contact this candidate

Resume:

Andrew Phinney

**** ********* ****. *******, ******* 403-***-**** **************@*****.***

Objective

To continue to be a high-quality metal fabricator/welder in all aspects of the trade

Education

RED SEAL JOURNEYMAN WELDER- RED DEER COLLEGE MAY 2010

·B- Pressure January, 2011 Initial ID 24223 (Valid)

·Prequalified 76a F3/F4 21848 ABSA W-28726

·CWB SMAW All Position (Valid)

·CWB FCAW/MCAW (Valid)

SAFETY TICKETS

·PST w/w CSTS 0.9 H2S OSSA Confined Space OSSA Fall Arrest

·OSSA Aerial Work Platform Fork lift/Skidsteer/Zoom Boom Overhead Crane

·Rigging OSSA Regional Orientation (ALL TICKETS ARE UP TO DATE)

Skills & Abilities

SPECIFIC TRADE SKILLS

·Fluent blueprint reading, built to drawing specifications, quality welds to NDT testing requirements, attention to detail, work well in a team environment, Operate Iron workers, 200 ton Hydraulic press, shears, punch and die, brakes, drill press, mag drill, hand held power tools, over head cranes, jibs, proper rigging techniques, oxy/acetylene, safety conscious, working within COR safety programs with documentation for safety and QC.

EXPERIENCE SKILLS

·Production Welding in shop with overhead cranes to weld in the flat as much as possible for increase production, verifying level and squareness of fitment, accurately measuring to drawing/field requirements for structural skids, platforms, hand rails, HSS, pile caps, pile splices.

·Production Spool Welding/Roll Welding/ Position Pipe Welding. Ensure measurements and orientation of fittings are correct to drawing requirements. Weld casing bowls with pressure testing.

·Capable of assessing and perform correct welding repairs for UT, Xray and NDT

·Heavy Machinery (797 Heavy Hauler), Industrial Process equipment (tank, vessel, production line, heavy wall), Underground mining (Mine shaft liner reinforcement/repair 2800’ underground)

COMMUNICATION

·11 years’ experience on industrial sites and commercial application. I read, write and speak fluent english. All concerns are brought to my supervisors’ attention for review and I actively participate in tool box meetings to maintain safe and efficient communication to tasks at hand.

·Industrial Projects (All Jobs hired as Employee/Hand welder)

·Suncor Firebag (Ft Mackay) Steam/Gathering Lines Cord Projects (Edmonton) Piling and Sleepers

Jan-Oct 2010

·Karnalyte Resources (Wynyard, SK)- Recycled Well pumping station – 6”-8” Production line. Jun-Dec 2011

·SaskPower – Communication/structural towers Piling and anchors Regina, Saskatchewan Jan 2011-June 2012

·Sobey’s Canada (Warehouse Terminal) Refrigeration and Supply line Cimco (Calgary)

June-Aug 2012

·Karnalyte Resources (Wynyard, SK)- 1.2 km HDPE Install, Tank farm

July-Oct 2013

·Karnalyte Resources (Wynyard, SK)- Solution Mining concept 3”-10” Production line.

July 2015-Dec 2016

·Old Dutch Chips – Big foot Industrial- Stainless Steel Structural Turn Around

Feb-Mar 2018

·Parkland Manufacturing/ ICON Construction- Esterhazy, Saskatchewan

May- July 2018

Mosiac Grout Pad K2 /Kleysen Salt Modular Platforms and Conveyor Repairs

MAY-JULY 2018

·Ledcor- Fairmount Shopping Mall Upgrade Complex Field Installation- Structural Steel.

July 2018- Aug 2018

·Syncrude Base Plant- Mining Equipment Repair 797 Heavy Hauler Mobile equipment- Acden Lemax

Aug 2018- Dec 2018

·Krawford Consultants- NorKraft Contracting – Joist reinforcement Alberta Health service

Jan 4-18, 2019

- Bilton Manufacturing and Pressure Vessel- 60’x60’ Structural Skids(MCAW/SMAW), ASME section (Mig/GMAW) tank fabrication with overhead crane

March 1 – April 14, 2019

-Kearl Lake (Imperial Oil) -Keiwit Energy- Hydro Supplement Crusher- CWB Structural, Field tested to 71t,91t-12 fluxcore, 309 with Artec 661 CCO carbon overlay horizontal and vertical down for construction on “Super Box” (SMAW)

April 15-September 7, (2019)

- CNRL Horizon -Primoris Willbros (3) 150’ diameter tanks by 80’ height with roof. 7018 Smaw, gouging, fitting large 1.5” to ” 10’x20’ rolled sheets with 100% x-ray. Working with vert buggies at heights 120 feet vertical. Sept 7-January 14, 2020

-BHP Jansen CTV (Canadian Tank and Vessel) contracted under TRL (Thyssen Redpath Ledcor) for Shaft Liner Installation underground of production and man service Shaft

Jan30,2020- June 22. 2020 ” plate with CWB Backing Fluxcore 91T-H9 All position Fluxcore

-CNRL Horizon – Aecom Industrial Maintenance- September-December 2020- Float cells (tank repair) Water Recycle line. Gouge, weld, repair, installation of walls and floor with mild and structural CCO wear plate. Fluxcore/Smaw Hardfacing. All welds VT, MPI, UT

TESTED @ CALGARY WELD TEST CENTER: Waiting on Hardcopy



Contact this candidate