Name of : Mr. Arun T. Khadse

Profession : Sr. Surveyor Gr. I

Contact : 738-***-****,816-***-****

******.******@*****.***

Address G-2,Samruddhi Villa, Samarth Nagar,

Shirgaon, Badlapur (E)

Maharashtra- 421503

Date of Birth : 22/01/1982

Years with Firm / Entity : 20 Years.

Nationality : Indian

Membership of Professional Societies :

Professional Societies

Type Of Member

Membership No.

Detailed Tasks Assigned : Given Separately

Key Qualification: Has more than 20 years of overall experience in various types of survey works such as land surveying, surveying for Highways, Bridges and other related projects in Maharashtra. Has carried out detailed survey for Road alignment and modification thereof if required at site. His expertise also involve in carrying out of alignment and level checking during casting of segments at Casting yard as well as Launching of Segments for segmental Fly-overs on behalf of project management consultant s. Is well versed with the modern surveying equipments such as Total Station, Auto level etc.

Responsible for checking and supervision of DBM, BC and Mastic Asphalt.

Education : 1) I.T.I.-Land Surveyor, with first class in 2000,

from Gunj.

COMPUTER COURSE : A ) Auto-Cad. B ) MSCIT.

Employment Record :

1)

Employer Name

M/s AIC Pvt Ltd

Position

Senior Surveyor Gr.-1

Period

Sept 2019 Up to Till Date

Project : Major Rehabilitation (Re-carpeting) of RWY'S 09/27 and Taxi Ways at Airside at CSMIA,Mumbai

Client : M/s GVK

Period : Sept 2019 Up to Till Date

Post : Sr.Surveyor Gr.- 1

Duties & Responsibilities:

Execution Surveyor or Airfield pavements (Runways, Taxiways, service roads) (both asphalt and PQC) and utilities work. & Runway all demarcation and level

(09-27 runway, N taxiway, PDP road, Rigid pavement, Flexible pavement)

Allocation of work to Engineer, Planning of Levels of Milling and Pavement(Material & Machinery) and Utilization.

Maintean Level of taxiway, Runway, PDP road during defect liability period.

Delegation of work, Maintaining Level Sheet,work programgs and Coordination with Client and Interfacing With interrelated activities.

Scheduling the given job, monatring the progress and achieving the same level and alignment as per DSL & GFC drawings.

Actively involved in execution of taxiways (rigid pavement)

Approval of trial patches of earthwork level & alignment DRLC, PQC from client.

Responsible for all level and alignment of RUNAWAY & TAXIWAY.

2)

Employer Name

M/s JMC Projects (India). Ltd.

Position

Senior Surveyor Gr.-3

Period

Jan 2017 to Sept 2019

Project : Proposed Flyover along Ghatkopar Mankhurd Link Road spanning Shivaji nagar Junction, Bhainganwadi Junction & Deonar dumping Junction in M/East

Client : M/s MUNICIPAL CORPORATION OF GREATER MUMBAI

(MCGM)

Period : Jan 2017 Up to till Date

Post : Sr.Surveyor Gr.- 3

Duties & Responsibilities :

Fixing of alignment, checking of c/l of road and fly-over, location and alignment of pier of the flyover, centre line of the I girder casting yard and their position with the use of total station instrument.

marking of levels at pile cap,pier cap, Marking of different levels of substructures and superstructures of Bridge with auto level.

Timely checking of position of TBM and other control points of traverse and checking of their levels.

Marking of alignment and levels of erected superstructure segment and their proper positioning with the help of total station and auto level.

Maintenance of survey documents including level sheets field books and related drawing property

Employment Record :

3)

Employer Name

M/s Supreme infrastructure India. Ltd.

Position

Senior Surveyor Gr.-I

Period

March 2016 to Dec 2016

Project : Construction of Six Lane Bridge across Ulhas creek near Durgadi Fort on Bhimandi- Kalyan Adlabad Road (NH-222 )

Client : M/s Mumbai Metro Region Development Authority (MMRDA)

Period : March 2016 Up to till Date

Post : Sr.Surveyor Gr.- I

Duties & Responsibilities :

Fixing of alignment, checking of c/l of road and fly-over, location and alignment of pier of the flyover, centre line of the I girder casting yard and their position with the use of total station instrument.

marking of levels at pile cap,pier cap, Marking of different levels of substructures and superstructures of Bridge with auto level.

Timely checking of position of TBM and other control points of traverse and checking of their levels.

Marking of alignment and levels of erected superstructure segment and their proper positioning with the help of total station and auto level.

Maintenance of survey documents including level sheets field books and related drawing property

4)

Employer Name

M/s Consulting Engineering Services (I) Pvt. Ltd.

Position

Senior Surveyor Gr.-I

Period

Sep 2008 Up to Feb 2016

Project : Design and Construction of Eastern Freeway from Museum to Anik Junction (Start of APLR).

Client : M/s Mumbai Metro Region Development Authority (MMRDA)

Contractor : M/s Simplex Infrastructures Limited

Period : Sep 2008 Up to Feb 2016

Post : Sr.Surveyor Gr.- I

Duties & Responsibilities :

Fixing of alignment, checking of c/l of road and fly-over, location and alignment of pier of the flyover, centre line of the segment at casting yard and their position with the use of total station instrument.

Checking of levels of different layers of roads, checking of different levels of substructures and superstructures of flyover with auto level.

Timely checking of position of TBM and other control points of traverse and checking of their levels.

Checking of alignment and levels of erected superstructure segment and their proper positioning with the help of total station and auto level.

Maintenance of survey documents including level sheets field books and related drawing property.

5)

Employer Name

M/s JMC Pvt. Ltd.

Position

Senior Surveyor Gr.I

Period

April 2006 Up to September 2008.

Project : Mandaleswar to Maharashtra Border Road Project,102 Km.

Client : M/s Madhaya Pradesh State Road Development Corporation

Contractor : M/s JMC (I) Limited

Period : April 2006 Up to September 2008.

Post : Sr Surveyor Gr.I

Duties & Responsibilities :

Fixing of alignment, Marking checking of c/l of road and fly-over, location and alignment of pier of the flyover, centre line of the segment at casting yard and their position with the use of total station instrument.

Checking of levels of different layers of roads, checking of different levels of substructures and superstructures of flyover with auto level.

Timely checking of position of TBM and other control points of traverse and checking of their levels.

Checking of alignment and levels of erected superstructure segment and their proper positioning with the help of total station and auto level.

Maintenance of survey documents including level sheets field books and related drawing property.

Responsible for checking and supervision of DBM, BC and Mastic Asphalt.

6)

Employer Name

M/s J. Kumar LTD.

Position

Senior Surveyor

Period

July 2004 Up to April 2006

Project : Windings and Construction of Western Express Way,

(Including FLYOVER, Subway), in Package. - 6 to 9. (16 km. In Length)

Client : M/s MMRDA

Contractor : M/s. J. Kumar Construction.LTD.

Period : July 2004 Up to April 2006

Post : Senior Surveyor

Duties & Responsibilities :

Fixing of alignment, checking of c/l of alignment & fixe position with the use of total station instrument.

Marking of levels of land with auto level.

Timely Transfar TBM and other control points of traverse and checking of their levels.

Marking of alignment and levels of with the help of total station and auto level.

Plane Table Survey with all details.

Maintenance of survey documents including level sheets field books and related drawing property.

Responsible for checking and supervision of DBM, BC and Mastic Asphalt.

7)

Employer Name

M/s Mahavir construction LTD.

Position

Surveyor

Period

July 2000 Up to September 2004

Project : 1) JVLR Project Mumbai.From jaicoch Flyover to L&T junction Sec- I

5.6Km. Gandhinagar Flyover To Eastern Express Highway.2.2 Km.

Client : M/s MMRDA

2) Western Express way from Jaicoch Flyover To Dahisar Bridge.

Client : M/s MSRDC

Contractor : M/s Mahavir Construction.LTD.

Period : July 2000 Up to September 2004

Post : Surveyor

Duties & Responsibilities :

Fixing alignment, Marking checking of c/l of pipe line & fixe position with the use of total station instrument.

Marking of levels of land with auto level.

Timely Marking position of TBM and other control points of traverse and checking of their levels.

Marking of alignment and levels of pipe line with the help of total station and auto level.

Plane Table Survey with all details.

Maintenance of survey documents including level sheets field books and related drawing property.

Responsible for checking and supervision of DBM, BC and Mastic Asphalt.

Selected Consultancies :

Year

Position

Name of Project

Country

Description of Duties

Sept 2019 to till date

Sr.

Surveyor

Major Rehabilitation (Re-carpeting) of RWY'S 09/27 and Taxi Ways at Airside at CSMIA,Mumbai

India

Sr.Surveyor

(Execution)

2017 Sept 2019

Sr. Surveyor

Proposed Flyover along Ghatkopar Mankhurd Link Road spanning Shivaji nagar Junction, Bhainganwadi Junction & Deonar dumping Junction in M/East

India

Sr. Surveyor (Execution)

2016 2016

Sr. Surveyor

Construction of Six Lane Bridge across Ulhas creek near Durgadi Fort on Bhimandi- Kalyan Adlabad Road (NH-222 )

India

Sr. Surveyor (Execution)

2008 2016

Sr. Surveyor

Design and Construction of Eastern Freeway from Museum to Anik Junction (Start of APLR).

India

Sr. Surveyor (Execution)

2006 2008

Sr. Surveyor

Rehabilitation, Upgradation & Strengthening of State Road in M.P.(Including Bridge, Subway), in Package. 3 Bhopal,

Road no. 5 Mandleshwer to Khargone (Sh-1 & Sh- 31)

Road no. - 6 Banher to Maharashtra Border (Sh-31)(110.00 km)

(Asian Development Bank Funded)

India

Sr. Surveyor (Execution)

2004 2006

Sr. Surveyor

Windings and Construction of Western Express Way,

(Including FLYOVER, Subway), in Package. - 6 to 9

(16 km. In Length)

India

Sr. Surveyor (Execution)

2000 2004

Surveyor

JVLR Project Mumbai.

From jaicoch Flyover to L&T junction Sec- 1(5.6Km.)

Gandhinagar Flyover To Eastern Express Highway.2.2 Km.

India

Surveyor

Languages :

Language

Speaking

Writing

Reading

English

Good

Good

Good

Hindi

Good

Good

Good

Marathi

Excellent

Excellent

Excellent

Certification :

I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describes me, my qualifications and my experience.