Post Job Free
Sign in

Civil Engineer Foreman

Location:
Patna, Bihar, India
Salary:
35k
Posted:
February 15, 2021

Contact this candidate

Resume:

WASIM ALAM

Permanent Address

Vill-Jhumka

Po – Behra

Ps – Sikta Dist-West Champaran

State- Bihar- Pin: 845307 India

Mob. : +91-837*******

Email ID: *************@*****.***

Post applied for: “CIVIL FOREMAN"

Objective:

To perform to the best of my knowledge, ability and expertise gained and play a vital role in the growth and development of the organization & to achieve success through hard work & determination.

Personal Strength:

To pursue a challenging opportunity and a position in dynamic and well reputed organization that offers good opportunities and challenging work environment in return would help me in building my knowledge, experience and academic capabilities.

Educational Qualifications:

S.S.C. Passed from B.S.E.B. Patna, in the Year 2011

Technical Qualifications:

DIPLOMA (Civil ) Passed from PRINCE INSTITUTE OF INNOVATIVE AND TECHNOLOGY GREATER NOIDA(U.P), in the Year 2015

Work Experience : 05 YEARS IN INDIA

1.Name of the Company : KARPARA PROJECT ENGINEERING

Designation : Civil Foreman

Duration : 15.05.2015 TO 02.05.2017

2.Name of the Company : LARSEN & TOUBRO LIMITED

Designation : Civil Foreman

Duration : 10.06.2017 TO 08.10.2020

Job Responsibilities:

1.Total Quantity can be list down serially in on format

2.Later Referring to the Construction Activities Completion Chart of Monthly Wise Requirement of Each Material put on the work out.

3.Each material required for construction activities has a different lead time.

4.Lead time is the minimum time of different between the placement of order and actual material delivered on the site.

5.According material order and receipt should be prepared.

6.This scheduled act as a guide for placing the order for material are to be delivered at the site well in the advanced to avoid any delay in starting the construction activities.

7.Co. ordinate sequence is very important for construction activates.

8.Manage labor procurement with minimum lead time.

1.After completed the excavated for the column and footing check the size of the pit before P.C.C then Start P.C.C work later cheeked the dimension of the excavation pit ( length, breadth depth) joint record measurement.

2.Get the well checked and approved by the consultant

3.Clean the pit by removing all loose material later soil leveling watering the excavated pit and ram it for better compact.

4.After complete cage of footing mark the center of respective column on the footing.

5.Erect the column bores by checking the numbers of bar, Die of bar spacing and type of links.

6.Provide length of column bar up to the bean level appropriate lap length of the bros.

7.Check cover block format size diagonal and plumb both side of the column and line dories one side of the column as per the drawing.

8.Cast column 6’’ above up to plinth level.

Personal Details:

Father’s Name : SHEKH RAHAMGIR

Date of Birth/Place : 01.03.1996/ JHUMKA BIHAR

Marital Status : Unmarried

Nationality : Indian

Religion : Islam

Language Known : English, Hindi & Urdu

Passport Details:

Passport No. : N7944598

Place of Issue : Patna

Date Of Issue : 02.02.2016

Date of Expiry : 01.02.2026

Declaration

I do hereby declare that all the statements as mentioned above are true to best of my knowledge and belief.

I am very grateful for reviewing my CV and I am very grateful if you will call for interview. With best regards

Thanking you.

Date

Place (WASIM ALAM)



Contact this candidate