Antonio L Gonzalez
Pasadena,Tx 77502 apt. 1111
***********@******.***
PROFILE
T have the ability to work well with others; I get along with people. Love to help others
and treat people the way I want to be treated. Over 10 years of experience. I never rush
or take shortcuts, but always work with a sense of urgency.
EMPLOYMENT HISTORY
Electrician, Oxinteno; 01/2018 - Present
Installing conduit from 1/2 inch all the way to 4 inch. Installing power panels 480v and
120/208. Wiring up transformers, terminating receptacles, installing start/stops, and
mounting and hanging lights. I’ve also done concrete and paint while on this job.
Journeyman Electrician, Ardent Services; 10/2013 - 01/2018
As a journeyman electrician, I would do a lot of underground work as well as elevated
work. Which is duct bank and on JLGs 100 feet in the air. I would terminate wires in 1/O
rooms. Install conduit in MCCs. Worked on cooling towers. Done grounding and
installed test welds. Cad welding to bond grounds together. Installed 1/4 to 3/4 tubing for
valves and instruments. Installed switchgear in MCCs. While working at Ardent Services,
I became a foreman at the plant called TPC. We had thermal couples that had to be
pulled off from 7 reactors; also conduit that had to be redone due to a fire.
Electrical Helper, Mundy; 01/2009 - 03/2013
I did lineman work pulling a Messenger wire from pole to pole. I’ve worked in Triconnex
and Honeywell buildings. Installed plasty bon conduit for acid units and cooling towers.
Also installed cable tray 6” all the way to 36”.
Electrical Helper, Meitee; 08/2006 - 09/2008
Installed and put MCCs building together. Once we would complete a building, we would
start to install switch gear and run conduit inside the building. I would install all the
grounding for the buildings. Would terminate cables for the light receptacles and would
terminate the wires for the heaters in the switchgears.
EDUCATION
Union High School — 03/2005
LANGUAGES
English - Fluent
Spanish - Fluent
lI O <