RESUME
NAME : T.C.SREENATH
QUALIFICATIONS – 1 : Bachelor in Engineering (Mechanical)
YEAR OF PASSING : 1987 (Full Time)
QUALIFICATIONS – 2 : MBA (IGNOU)
YEAR OF PASSING : 1999 (Part Time)
PROFILE : Multi-functional, highly versatile, high potential and rich experience in having performed critical roles and activities successfully in multiple disciplines in the Thermal Power Sector (Engineering, Project Management, Contracts Management, O&M Support activities and Projects Execution)
PRESENT POSITION : XXXXXXXXXXXXXXXXXX
(FROM xxxxxx 2021) YYYYYYYYYYYYYYYYYY
SUMMARY OF PAST EXPERIENCE (In reverse Chronological Order)
About 3 (Three) years in SSPIL, Dhaka, Bangladesh as Project Engineering Manager for the Design, Engineering and Technical Support for the 2 x 660 MW (612 MW Net) greenfield Super Critical Units at Dhaka, Bangladesh (From November 2017 to November 2020)
About 5 (Five) years in ADANI POWER LTD, Ahmedabad for Engineering, Retrofits and Operations technical support for existing as well as greenfield 660 MW Super Critical Units & Engineering support for Water Business vertical (From September 2012 to September 2017)
About 2.5 (Two & half) years in ADANI POWER LTD, CHINA OPERATIONS in Beijing, Shanghai and Chengdu for Bid Evaluation, Engineering & Sizing review and procurement support for the 660 MW Super Critical Units (BTG Packages) and the 40 MW Bitta Thin Film Solar Power Project, all sourced from China (From April 2010 to August 2012)
About 1 (One) year as Head of Projects Execution in IJT Ltd for Green Energy Boilers (From February 2009 to March 2010)
About 1 (One) year as Head of EPC in Jindal ITF Ltd (JUIL) for 16 MW Non-Conventional Power Project based on Refuse Derived Fuel from Municipal Solid Waste (From May 2008 to February 2009)
About 7 (Seven) years experience in ALSTOM PROJECTS INDIA LTD in Project Management of Boiler Services Business of Western India in Baroda, later on, Head of Projects Execution in Boilers Division in New Delhi (From February 2001 to March 2008)
Over 4.5 (Four and half) years experience in LARSEN & TOUBRO LTD, EPC – (POWER) in Techno-Commercial Evaluation of Power Projects, Project Execution, R & M Study and Engineering Consultancy for Power Projects (From July 1996 to January 2001)
About 9 (Nine) years experience in BHARAT HEAVY ELECTRICALS LTD (BHEL) as equipment specialist in Boilers, Auxiliaries and ESP. Installation and Commissioning across several Power Projects (From November 1987 to June 1996)
KEY SKILLS AND COMPETENCIES
Over 33 years of experience in the Power Sector in the following specialised areas
(1)Techno-Commercial functions including Technical Specifications, Package philosophy, Special Contract Conditions, Technical Evaluation and Cost estimation for Mechanical Packages for utility thermal power projects
(2)Project Development activities like Due Diligence, Site Survey, Plot Plan preparation, selection of Technology, preliminary Cost estimates and Environmental clearance / approval
(3)Identification and Evaluation of new technologies and developments along with business plan for implementation in existing / upcoming Projects (FGD, SCR, SNCR, ZLD and CCS…etc.)
(4)Project Management and Contracts Management activities both for supply and works packages pertaining both to BTG and BOP areas
(5)On the job experience of Erection, Commissioning and Testing of Boilers, Auxiliaries and ESP of Units of sizes up to 500 MW
(6)Exposure and experience in the methodology and techno-commercial process for Renewable Energy like Solar & Wind Power Projects and RDF (MSW) based Power Projects
(7)O&M Support, Value Engineering & System improvement studies, Engineering Consultancy and RLA Studies leading to R&M of existing and running thermal Power Plants
(8)Project Development activities like Feasibility Studies, DPR, Socio-economic impact and support services like Performance Evaluation, FAT and SAT for Solar Power Projects
(9)Engineering Management and bidding support for Water Projects like Desalination Plants, Sewage Treatment Plants (STP) and Water Treatment Plants in the utility sector
SPECIALISED TRAINING AND SKILLS
1. SUTETRAK (Project Management Software of PRIMAVERA SYSTEMS)
2. MS Office for Windows - Word, Excel, Power Point and other accessories
ADDRESS FOR CORRESPONDENCE
C – 29 LAXMINARAYAN SOCIETY,
Nr Jalaram Nagar,
Bh Mothers’ School, Vadodara – 390007
Gujarat, INDIA
Cell :- + 91 – 999-***-****
e-mail :- adj4kc@r.postjobfree.com or adj4kc@r.postjobfree.com
OTHER PERSONAL PARTICULARS
Nationality
Marital Status
Language Fluency
Indian
Married (One Son & One Daughter)
English, Hindi, Telugu, Oriya
DATE & PLACE OF BIRTH - 13 – 08 – 1966 / Bangalore, Karnataka, INDIA
NOTICE PERIOD - One to Two Months (Maximum)
EXTRA CURRICULAR ACTIVITIES
Participated extensively in speeches, debates and essay writing competitions at school and college levels and won several awards. Keen interest in reading books, music, photography and some games and sports.
DETAILS OF WORK EXPERIENCE
Experience
Project
xxxxxxxx, xxxx 2021 to As on Date
yyyyyyyyyyyyyyyyyyyyyyyyyyyyyy
aaaaaaaaaaaaaaaaaaaaa
bbbbbbbbbbbbbbbbbbbbb
cccccccccccccccccccc
Experience
Project
Project Manager, Engineering – SS Power I Ltd, Dhaka, Bangladesh, November 2017 to November 2020
Project Development, Engineering and execution of the 2 x 660 MW Super Critical thermal power plant at Banshkhali, Chittagong
Review and finalization of Basic Engineering and Detailed Engineering activities for BTG & BOP Packages, Coal Unloading jetty and transportation and Site infrastructure packages
Study and finalization of Contracts and agreements like PPA, IA, EPC Contract, CSA, CTA, O&M Agreement and Environmental Studies / clearances
Project Monitoring for timely release of deliverables and inputs for timely implementation
Identify and resolve Engineering issues during design stage as well as Erection and Commissioning to enable timely works completion and project commissioning
Experience
Project
General Manager, Engineering – New technologies, Water Business and VE, Adani Power Ltd, Ahmedabad, July 2015 to September 2017
Latest technological developments in the Thermal and Renewable Power Sectors and implementation in existing / upcoming Projects, Water Business and Value Engineering
Initiative driven approach towards study of the latest technological advancements and developments and Value Engineering for system improvements / Retrofits
Identify the technologies required to meet the Environmental emission / discharge norms in existing / upcoming projects, work out the cost benefit analysis and business plan for implementation (OT for sub-critical Boilers, FGD, SCR / SNCR, ZLD and CCS…etc.)
Project development and Engineering activities for Solar PV Plants (648 MW Tamilnadu, 50 MW Mogha and 50 MW Bathinda Projects)
Association with QA / QC for finalization of FAT and SAT for Modules, Inverters & Transformers of Solar Power Plants
Study and identification of performance improvement systems for Solar PV Plants and implementation (Robotic water free Module Cleaning, Seasonal Tilt, Single and Dual Axis Tracking systems) and recommendations for implementation
Engineering Management for the Water Business in their ventures for participation and setting up of various public utility projects (Desalination, STPs and Water Treatment Plants)
Experience
Project
General Manager, Discipline Lead, Mechanical – (Engineering), Adani Power Ltd, Ahmedabad, September 2012 to June 2015
(i) Engineering for running Supercritical Thermal Power Projects set up by the Adani Group
(a) 5 x 660 MW Tiroda (b) 2 x 660 MW Kawai (c) 4620 MW Mundra Project
(ii) Project development activities for new Projects and acquired Projects (a) 2 x 800 MW Kawai Extension (b) 4 x 150 MW Subcritical CFBC Surguja (c) 100 MW Mundra Wind Power Project (d) 1 x 660 MW Avantha Extension (e) 40 MW Bitta Solar Power Project (f) Other Projects
Review and finalization of Engineering activities and timely release of deliverables and inputs for projects under implementation
Identify and resolve Engineering issues during design stage as well as Erection and Commissioning to enable works completion and achieve the ultimate goal of timely project completion and commissioning
Technical studies, Cost estimation and finalization of way forward strategies for new Projects under development and also projects being acquired to enable a business call on the way forward
Project Development and Engineering activities for the 100 MW Mundra Wind Power Project
Performance Evaluation post commissioning for the 40MW Bitta Solar Power Project
Value Engineering activities, preparation of Standard Technical Specifications and studies for system improvements / upgradation of running Power Plants for enhanced unit performance
Experience
Project
Associate General Manager – (Projects, China Operations) Adani Power Ltd, Shanghai / Chengdu, April 2010 to August 2012
Engineering activities of Supercritical Thermal Power Projects planned by Adani Group
(a) 4 x 660 MW Dahej (b) 2 x 660 MW Pench (c ) 5 x 660 MW Tiroda (d) 2 x 660 MW Kawai (d) 4 x 135 MW Subcritical CFBC Surguja (e) 40 MW Bitta Solar Power Project
Technical Bid Evaluation of various vendors for Boilers, Turbines, Generators, ESP and Auxiliaries of the BTG Island being sourced from China and finalization of all technical and scope aspects to enable order placement
Pro-active interaction with Chinese Design Institute / Consultant for scope integration between packages sourced from China and India
Monitoring and follow-up for timely availability of inputs and resolution of technical issues with Chinese Design Institute and Site to ensure smooth installation and commissioning
Achieve completion of all Engineering works and documentation for the above projects pertaining to Chinese Design Institute scope of works within stipulated timelines
Experience
Project
General Manager – (Projects Execution) IJT Ltd, (February 2009 to March 2010)
Coal, Oil, Bagasse and Gas Fired Boilers (60 to 150 TPH) for Cogeneration and Industries
Planning and Organizing of Resources, Manpower and Schedule to meet contractual deadlines with Customer including follow-up with different functional groups for required inputs
Ensure customer interface for timely Works Completion, Commissioning and other related aspects
Experience
Project
General Manager (Projects) JUIL, (May 2008 to February 2009)
Head of Engineering and Projects for
(a)16 MW Power Plant based on RDF (MSW) in New Delhi
(b)1950 TPD MSW handling and RDF Plant
Established the RDF Process, Technology, Tendering, bid evaluation, negotiation and drawing Contracts for various packages comprising the project
Achieving compliance with Statutory Regulations and requirements pertaining to the Power Plant
Experience
Project
Head – Project Execution for various Boiler jobs including ESP, ALSTOM, New Delhi (May 2006 to April 2008)
Coal and Oil Fired Boilers for Greenfield Utilities, Industry & Retrofit Power Plants, INDIA
Finalization of Contracts and Vendors for various erection packages and management till works completion, resolution of disputes if any and Contract closure
Planning and Organizing of Resources, Manpower and Schedule to execute site works, provide technical and material inputs as required and meet contractual deadlines with Customers
Key projects handled include the following –
I.2 X 230 TPH BFG & COG Fired Boilers for P.H.6 at TISCO, Jamshedpur
II.R&M OF 2 X 390 TPH coal Fired Boilers for Units # 3 & 4 at HINDALCO, RPD
III.120 TPH Tail Gas Fired Boiler OF PCBL, Durgapur
IV.HRSG FOR 92.2 MW CCPP, Phase II OF TNEB, Valuthur
V.Conversion of 120 TPH AFBC unit # 3 boiler TO CFBC AT Rajshree Cements, Malkhed
VI.R&M OF 4 X 110 MW Coal Fired Boilers at NTPC Tanda
VII.R&M OF TAPH FOR 210 MW Coal Fired Boiler Of Units # 1 & 2 AT CSEB, Korba (WEST)
Experience
Project
Project Manager for Boiler Spares, Services and R&M projects, ALSTOM, Baroda (February 2001 to April 2006)
Coal and Lignite Fired Utility Power Plants, Western Region, INDIA
In-charge of Western Region states and single point responsibility for Boiler Spares, Services and Refurbishment & Modernisation packages of running Power Plants starting from placement of order, job completion, Trials & Tests and realization of payments
A short stint in 1 x 250 MW ST – CMS Neyveli Lignite Power Project for expediting and completion of milestone activities of Boiler to attain System Readiness
Experience
Project
Engineering Consultancy and Solutions,
L&T – S & L, (April 1999 to January 2001)
Engineering Consultancy Studies and Assignments for various Power Plants, INDIA
Study of the problem of very high unburnts in Boiler of the 63.5 MW Unit of TCPL at Gummidipoondi, an IPP in Tamilnadu, and recommendation of solutions to implement
Technical Evaluation and Supervision of compliance with applicable Codes for the PG Tests for Boiler, Turbine and ESP of 210 MW Unit # 5 of Gandhinagar TPS and Unit # 7 of Wanakbori TPS of GSECL, in Gujarat State being conducted by the OEM
RLA Studies followed by recommendations for Refurbishment, Modernization and Performance Improvement for the Boilers and Auxiliaries of 3 x 210 MW Units at Wanakbori TPS, 1 x 200 MW Unit at Ukai TPS and 1 x 31.75 MW of Dhuvaran TPS all under GSECL in Gujarat
Experience
Project
L&T – EPC (Power), (July 1996 to March 1999)
EPC and Project Execution, INDIA
Planning, Erection and Commissioning of 2 x 34 MW (120 TPH) Boiler and Auxiliaries at Haldia CCCPP, in West Bengal within time and to the satisfaction of the Client
Techno-Commercial bid evaluation and finalization of supply and works packages for Boiler Island Packages of 2 x 287 MW Bhilai Thermal Power Plant in Madhya Pradesh
Experience
Project
BHARAT HEAVY ELECTRICALS LTD, (November 1987 to June 1996)
Project Implementation (Erection and Commissioning), INDIA
Technical Supervision of Erection and Equipment Commissioning of Boiler Auxiliaries like ESP, FD, ID and PA Fans, Ball Tube Mills, Ducts and Structures for 2 x 210 MW Ib Thermal Power Project in Odisha
Erection of Boiler Auxiliaries like ESP, FD, ID and PA Fans, Ball Tube Mills, Ducts and Structures for 2 x 210 MW Tenughat Thermal Power Project in Jharkhand
Successful Mechanical Erection completion of ESPs of two Units of 4 x 210 MW Kahalgaon Super Thermal Power Project in Bihar in a record time of 13 months
Commissioning of Boiler and Auxiliaries and ESP including Milestone activities like Hydraulic Test, Chemical Cleaning, Steam Blowing and Safety Valve Floating for 500 MW Unit # 6 of Korba Super Thermal Power Project in Chhattisgarh