RESUME
PON KAMARAJ.L
Email id: **********.***@*****.***
Mobile no : +91-957*******
OBJECTIVE:
To develop my career in an environment, where my skills and knowledge along with my enthusiasm will be fully utilized and extended and give me a sense of fulfillment. To be employed in an environment, this rewards fairly by results achieved and which appreciates hard work and integrity in carrying out assigned tasks. EDUCATIONAL QUALIFICATION:
Mechanical Engineering in St Joseph’s Institute of Technology Chennai. During 2013 to 2017 with 73%
CERTIFICATIONS AND TRAINING :
NDT- level II in Accordance with SNT/ TC/1A OF ASNT from decibel EL-ELOHE training institute Chennai, INDIA.
1. Visual testing
2. Magnetic Particle Testing
3. Liquid Penetrate Testing
4. Ultrasonic Testing
5. Radiographic Testing
Permit applicant (PA) and Receiving Authority (RA) training at MOCA Resources Sdn Bhd in PENGERANG INTEGRATED COMPLEX (PIC) ID Serial No : 0000285
Authorised Entrant And Standby Person for Confined Space training at NIOSH
(NATIONAL INSTITUTE OF OCCUPITIONAL SAFETY AND HEALTH ) ID Serial No : NW-SRO-AE-2275-R
2
WORK EXPERIENCES
Mar2019 –
Till date
PORATHA CORPORATION SDN BHD
Site Supervisor -(Pre com & commissioning)
Project: RAPID PROJECT PACKAGE 27-EPCC OF FLEXI HDPE UNIT ( MALAYSIA)
Client : Tecnimont HQC Sdn Bhd
Aug2017 -
Jan2019
THARTIUS ENGINEERING CONTRACTORS
Site Supervisor-(construction & Precommissioning)
Project: NPCIL- NUCLEAR POWER PLANT KUDANKULAM (INDIA)
Client : L&T PRIVATE LIMITED INDIA
ROLES AND RESPONSIBILITIES :
Precommissioning and commissioning
To prepare daily activities work planning and strictly follow the permit to work system
Tool box briefing before starting the daily activity
To prepare mark up P&ID’s
Punch list preparation and follow up of punch killing.
Air blowing of the systems (process line & utility)
Water flushing of the systems (process line & utility).
Leak Test of the systems. (Nitrogen purging and inerting for fuel gas line, water line, etc) Dry out of furnace, Boiler and Heater.
Cooling water circulation.
Steam warming up and blowing.
Chemical cleaning (degreasing & passivation)
Solo-run test & Mechanical run test of rotary equipment like (pump, blower, compressor, fin fan cooler)
Function testing of the control valves N2 purging & N2 blanketing of the system. 3
Construction
Erection of pipe lines & testing of pipe lines
Erection of support for pipe lines
Fabrication of spools
Installation of Static/Rotating Equipment and Piping
Erection of static equipment
PERSONAL PROFILE :
Name : PON KAMARAJ
Fathers Name : LINGAM
Date of Birth : 13-06-1995
Sex : MALE
Marital Status : SINGLE
Nationality : INDIAN
Languages Known : ENGLISH, TAMIL
PASSPORT DETAILS:
Passport No : R4718930
Place of Issue : MADURAI
Date of Issue : 25-09-2017
Validity : 24-09-2027
DECLARATION :
I hereby declare that the above-furnished information is true and correct to the best of my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars.
Place : TIRUNELVELI YOUR’S TRULY
Date : PON KAMARAJ.L