Post Job Free

Resume

Sign in

Mechanical Fitter, Mechanical Commissioning Technician

Location:
Batangas City, Batangas, Philippines
Posted:
February 10, 2021

Contact this candidate

Resume:

HENRY A. HERRELLA

**** ****** ******** ****

adj2d9@r.postjobfree.com

Cell. No. +639*********

Objective: An entry level position in Mechanical Commissioning Technician

Work Experience:

CPC ENGINEERING KALGOORLIE

MECHANICAL FITTER

MARCH 13, 2018 – JANUARY 22, 2020

-Assigned as Mechanical Fitter for shutdown project in WA mining sites in Mount Marion Lithium, Nickel Smelter, Carosue Dam Gold Mine, St. Ives Gold Mine, KCGM, Darlot, Agnew Gold Mine, BHP Leinster, Gwalia Underground Mining, Fixed Plant Mining

-Perform numerous maintenance and shutdown activities.

-Dismantling and install new matts on CV02A, CV02B, CV01 top deck, middle deck,bottom deck (confined space)

-Dismantling and install new chains on CV 07, assist with the maintenance crew.

-Install new wear plates on chutes for Gwalia Underground project.

-Dismantling and install new carrier rollers, return rollers, adjust skirts

-Mechanical inspection, Punchlist, commissioning…

FIRST GAS POWER CORPORATION PHILIPPINES

MECHANICAL PIPING TECHNICIAN

EUROWAY INDUSTRIAL SERVICES SIEMENS POWER OPERATION November 10, 2014 - August 12, 2017

-Assigned as Mechanical Piping Technician for the construction, commissioning of 97MW Avion open cycle power plant, 414MW San Gabriel Power Plant expansion project

-In charged for the installation of piping small bore for utility system, (air test, hydrotest)

-Line checking for all piping and mechanical equipment, Assist Piping Supervisor for the construction of above ground piping. Knowledge on isometric, P&ID and General Piping Arrangement drawing

-Pre commissioning, Commissioning with the team of Instrument, electrical, mechanical with the clients WARTSILA SINGAPORE PTE. LTD.

PIPING MECHANICAL COMMISSIONING

TECHNICIAN

BC PETROLEUM EPV BALAI CLUSTER MUTIARA FPSO SINGAPORE September 25, 2012 - June 28, 2013

-Assigned as Piping Technician for the commissioning of Fpso Onshore project, Keppel Tuas shipyard

-In charged on Piping and Mechanical line walk on topsides and hull (engine room) with the clients

-Pre commissioning, commissioning of piping system and mechanical equipment, Clearing of punch list

-Monitor 4 hour load run test on topsides pumps and motors, removed coupling spacer & re instate back BRUNEL INTERNATIONAL SOUTH EAST ASIA PTE. LTD.

MECHANICAL COMMISSIONING TECHNICIAN

BLOCK 12W FIELD DEVELOPMENT CHIM SAO EMAS FPSO SINGAPORE January 18, 2011 – July 3, 2011

-Assigned as Mechanical Technician for the commissioning of Fpso Onshore project, Keppel Benoi shipyard

-Commissioning of fresh water cooling system, sea water cooling system, 3.0mw steam turbine generator, 9.2mw steam turbine generator, fire water system, removed coupling spacer and reinstate back

-Monitoring of utility fresh water cooling pump, seawater cooling pump, instrument air compressor, domestic refrigeration, Line checking on engine room, topsides(process modules), Check 4 hour load run test on engine room and process modules ( pumps, motors, fin fan cooler, main drive fan motor) WARTSILA AUTOMATION SINAPORE

SENIOR MECHANICAL COMMISSIONING TECHNICIAN

MONTARA VENTURE FPSO ONSHORE PROJECT SINGAPORE

August 18, 2008 – November 6, 2009

-Assigned as Senior Mechanical Technician for the commissioning of Montara Venture, Tanker Pacific offshore terminal, Jurong Shipyard Singapore

-Line checking on piping system and mechanical equipment on topsides from module 1 – module 13

-Preparation of P&ID, Isometric drawing, study test pack for Final tri party walk down on piping and mechanical system (topsides and marine) with the QC and the clients. Supervised of dismantling and re in state back of al PSV on topsides module, Clearing of punch list A and B, Knowledge on P&ID, isometric drawing and piping general arrangement drawing.

GRANITE SERVICES INTERNATIONAL INC.

MECHANICAL TECHNICIAN

BIR M CHERGA GE INTERNATIONAL INC. TUNISIA

April 21, 2008 – May 23, 2008

-Assigned as Mechanical Technician for the major overhauling of GE electric gas turbine, Frame 9E shutdown

-Assembly, dis assembly of upper halves casing of turbine shell casing, compressor casing, inlet plenum casing exhaust casing, compressor discharge casing, combustion assembly, dis assembly combustion casing, flow sleeve, cross fire tubes, liner, retaining clips, combustion can cover and fuel nozzle. MC DERMOTT CASPIAN CONTRACTOR INC.

MECHANICAL COMMISSIONING TECHNICIAN

BAKU DEEP JACKET FACTORY BAKU AZERBAIJAN

February 6, 2006 – July 7, 2007

-Assigned as Mechanical Technician for the commissioning of East Azeri, PDQ and DUQ onshore platform

-Commissioning of produce water pump. reject oil pump, cooling medium, oil booster pump, sand separation package, diesel transfer pump, HP LP separator, hazardous non hazardous open drain, fire water ring main, fire engine, sewage treatment package, black start compressor, fresh water pump, lifeboat, monitoring of 4 hour load run test pump and motor, lube oil flushing, clearing of punch list. CAPE EAST PHILIPPINES OFFSHORE DIVISION

MECHANICAL FITTER

BAYU UNDAN OFFSHORE EAST TIMOR

April 13, 2005 – May 28, 2005

-Assigned as Mechanical Fitter for the shutdown of Bayu Undan Platform Gas Recycle Onshore Project

-dismantling and replacement of internal parts of vessel 1112 Glycol contactor, Opening and box up of man hole cover of vessel 1121 and vessel 1122 Glycol, vessel 1123 Production Separator from top to bottom. SIRTE OIL COMPANY

MECHANICAL TECHNICIAN

MARSA EL BREGA LIBYA

June 2, 2004 – September 21, 2004

-Assigned as Mechanical Technician for the maintenance and turn around activities (Gas plant, Ammonia plant, Methanol plant) 3 month shutdown, commissioning

-Blinding and de blinding of vessel tower nozzle from top to bottom, Opening and box up of vessel/tower manhole using impact wrench, Dismantling and replacement of baffle grits and merix screen inside the vessel/tower.

SIRTE OIL COMPANY

MECHANICAL TECHNICIAN

MARSA EL BREGA LIBYA

August 8, 2003 – November 8, 2003

-Assigned as Mechanical Technician for the maintenance and turn around activities of desalination plant and ammonia 2 plant, (3month shutdown), commisioning

-Responsible for dismantling and replacement of condenser tubing, unit 6, 7, 8, 9. 10. Opening and box up of condenser units 1, 2, 3, 4, 5, 6, 7, 8, 9, 10. Perform grinding, cutting, layout for the repair of condenser units 1, 3, 5. Blinding and de blinding of heat exchanger for preparation for hydrotest. Cleaning of tube bundle of exchanger using pressurized water.

SIRTE OIL COMPANY

MECHANICAL TECHNICIAN

MARSA EL BREGA LIBYA

July 9, 2002 – October 3, 2002

-Assigned as Mechanical Technician for the maintenance and turn around activities of Urea plant 2 and gas plant 1, 3 month shutdown, commissioning

-Responsible for dismantling and installation of all PSV. Urea plant 2 north area, Opening and box up of heat exchanger for preparation for hydrotest. Blinding and deblinding of man hole of vessel from top to bottom. Remove old valves and burnt gasket and replace new valves and gasket

-Working on confined space for cleaning of internal parts of the vessel using pressurized water, Installed baffle grits and merix screen inside the vessel from top to bottom. DESCON ENGINEERING LTD. CO.

PIPING SUPERVISOR

GASCO RUWAIS ABU DHABI

January 23, 2001 – May 23, 2001

-Assigned as Piping Supervisor for the construction of Gasco Ruwais Facilities Upgrading Project

-Supervise fabrication of pipe spools and fittings for AWU and C3 Loop train 2, Butane Phase separator, caustic Regenerator and Storage area

-Distribution of manpower and equipment

-Implement safety precaution upon the instruction of my superior

-Perform tool box meeting before start working

-Study and interpret isometric drawing and piping general arrangement drawing

- Assigned for the construction of above ground piping SIRTE OIL COMPANY

MECHANICAL TECHNICIAN

MARSA EL BREGA LIBYA

June 26, 1999 – September 24, 1999

-Assigned as Mechanical Technician for the maintenance and turn around activities of Methanol plant 1 and Ammonia plant 1.

-Blinding and de blinding of heat exchanger (inlet and outlet) for preparation of hydrotest

-Dismantle of PSV and re instate back after calibration

-Assist Rigger for the dismantle of tube bundle of heat exchanger for inspection, cleaning and hydrotest

-Opening and box up of heat exchanger using impact wrench. BELLELI SAUDI HEAVY INDUSTRIES

PIPING SUPERVISOR

JETTY TRESTLE COMMON FABRICATION JUBAIL KSA

July 9, 1998 – February 9, 1999

-Assigned as Piping Supervisor for the construction of Jetty Trestle Common Fabrication

-Supervised fabricated spools and installation of hook up spools bridge 7, 8, 9, 10

-Monitoring of manpower and equipment

-Check interpret isometric drawing and material specification

-Implement safety precaution, housekeeping, Perform tool box meeting before start of work. J A JONES CONSTRUCTION PTE. LTD.

PIPEFITTER

SCHERING – PLOUGH PHARMACEUTICAL PLANT SINGAPORE

July 20, 1997 – September 16, 1997

-Assigned as Pipefitter for the additional piping works of Pharmaceutical plant

-Fabricate small bore pipe from upper pipe rack to compressor house

-Hydrotest and flushing of new installed piping system

-Line checking for clearing of punch list

POONG LIM INDUSTRIAL LTD. CO.

PIPING FOREMAN

EQUATE INFRASTRUCTURE PROJECT KUWAIT

February 17, 1996 – May 17, 1997

-Assigned as Piping Foreman for the construction of Equate Infrastructure, Flour Int’l, Shuaiba Refinery

-Supervised site erection for installation of piping spools and fittings for boiler feed water, high/low condensate, high/low pressure steam, diesel fuel line, fire water line, boiler chemical line etc…

-Study and interpret drawing, plan view and schedule of correct implementation

-Implement safety precaution, perform daily tool box meeting and housekeeping

-Updating of daily accomplishment work

LITWIN LUMMUS CREST JOINT VENTURE

PIPEFITTER

DELAYED COKER PROJECT COASTAL ARUBA REFINERY

January 26, 1995 – June 8, 1995

-Assigned as Pipefitter for the construction of Delayed Coker, San Nicolas Aruba

-Assigned for the installation, fit up different kind and sizes of pipe and fittings for boiler blowdown water line, high/low steam, process sewer, acid sewer, plant air, cycle cooling water return & supply, diesel line

-Perform hydrotest on night shift duty, pre commissioning, commissioning HYUNDAI DOZ

PIPEFITTER

MLNG DUA PLANT SARAWAK MALAYSIA

February 9, 1994 – October 5, 1994

-Assigned as Pipefitter for the construction of MLNG Dua plant, Bintulu Sarawak

-Study interpret isometric drawing for diesel fuel line, high/low pressure liquid nitrogen, utility cooling water, process sewer line, boiler chemical line, fuel gas line, etc…Fit up, grinding, cutting, fabricate lateral, saddle tee. Assigned in fabrication shop and above ground piping DAE LIM ENGINEERING CO. LTD.

PIPEFITTER

KUWAIT NATIONAL PETROLEUM COMPANY

February 28, 1993 – November 10, 1993

-Assigned as Pipefitter for the restoration project of Shuaiba Refinery Foster Wheeler

-Assigned for carrying maintenance work on equipment and piping works, dismantle of damage pipe, fabricate, grinding, cutting, lay out new piping spools. Installation of new valves and fittings

-Perform hydrotest, Line checking of bullet hole

CALTEX PHILIPPINE INC.

PIPEFITTER/MECHANICAL FITTER

June 21, 1986 – August 10, 1992

-Assigned as Pipefitter/Mechanical fitter for the maintenance, repair, shutdown, commissioning and expansion project of Caltex Refinery

-Responsible for the maintenance, pre commissioning, commissioning and initial start up, testing of all static equipment such as pressure vessel, piping system as well as associate valves, pipelines and rotating equipment. Execute piping works, fit up, grinding, cutting, lay out, fabricate pipe spools, lateral tee and saddle tee, opening and box up of heat exchanger using impact wrench, blinding and deblinding of heat exchanger for preparation for hydrotest and inspection, clean internal parts of vessel from top to bottom using pressurized water, Dismantling and installation of new baffle trays on vessel from top to bottom VETASSESS

FITTER (GENERAL)

FEBRUARY 05, 2018

SHIPYARD SAFETY INSTRUCTION COURSE:

INDUSTRIAL TRAINING CENTRE PTE. LTD.

TRADE HUB 21 SINGAPORE 609965

JANUARY 18, 2013 – JANUARY 17, 2015

BASIC OFFSHORE SAFETY INDUCTION EMERGENCY TRAINING (BOSIET) CONSOLIDATED TRAINING SYSTEM INC.

4TH

FLOOR S&L BUILDING 1500 ROXAS BLVD. MANILA PHILIPPINES OPITO UNIQUE ID 734301

MARCH 19, 2005 – MARCH 18, 2009

BUILDERS TECHNICAL SERVICES TRADE TEST AND TRAINING CENTER SEPTEMBER 29, 1997

PIPEFITTER CLASS B+

PERSONAL DATA:

Date of birth - May 25, 1965 Passport No. - P4242409A Place of birth - Batangas City Religion - Catholic Nationality - Philippine DRAFTING TECHNOLOGY



Contact this candidate