Post Job Free
Sign in

Civil Engineering Engineer

Location:
Madhya Pradesh, India
Salary:
35000
Posted:
February 09, 2021

Contact this candidate

Resume:

*/*

COVER LETTER

Mob: +91-700*******, 860-***-****

SALMAN KHAN

Email:**************@*****.***

House no.43, Jafar Taraf, Unnao.

Distt- Unnao

Uttar Pradesh (INDIA) -209801

Hello Sir/Madam

I would like to introduce myself as Er. Salman Khan, passed B.Tech in Civil Engineering from Axis Institute of technology & management and my extensive experience in civil engineering (SITE), I have 3 year’s and 9 months professional experience.

Now, in present I’m working as a Structure Site Engineer in a company Jhajhariya Nirman Limited, Bilaspur, C.G. since 15 November 2018 to till date.

As my CV reflects, I have extensive experience in the construction of Railway bed (Earth Formation, Sub Grade),Rail Over Bridge(ROB), Major Bridge (PSC girder), Minor Bridges, Canal Lining,Culverts, retaining wall & wing wall, bar binding schedule (BBS) client bill and sub contractor billings, survey work & other general work. I attached herewith my CV.

2/3

SALMANKHAN *****.**************@*****.***

House No.-43 JafarTaraf,Unnao

District-Unnao, Uttar pradesh

(INDIA) 209801.

To work for an organization which provides me the opportunity to improve my skills and knowledge growth along with the organization objective.

EDUCATION:

Academic:

S.No Qualificatoo Institute / Board Year Perceotage 1 Senior Secondary

(12-th)

M.S.VIDYA MANDIR/ Utar

Pradesh Board

2013 66

2 Matriculatons (10-th) G.N.P.H.S. / Utar Pradesh

Board

2010 62

Professiooal:

S.No Degree Instute/ College/ uoieersit. Year Perceotage/ CGPA

1 B.Tech.

Civil Engineering

AXIS Insttute of technology &

Management/Dr. A.P.J. Abdul

KalamTechnical University

2017 64

TECHNICALSKILLS:

Basic C language,

M.S. Office tool

EXPERIENCE:

1 Major bridge (ROB Composite & PSC girder)

2 Aquaduct

3 Canal (branch & minor lining)

4 Minor Bridges

5 Retaining Walls/Wing Walls

6 Box Culverts Responsible for execution of the work as per the contract specifications. 7 Earth formation Of Railway Line ( sub base & sub grade) OBJECTIVE:

3/3

RESPONSIBILTIES INCLUDES:

Responsible for Execution and Construction of all structural work i.e. Branch Canal, Minor Bridge, Retaining wall, Wing Wall, Box Culverts, Earth formation of Railway line with study of drawing, as well as quality Control at site.

Responsible for site Productivity & Planning ofday to day activities, as matching in line with monthly targets.

Daily coordination with Consultant on the subject of progress and quality coming onsite matching with the project schedule, as well as necessary approval of work done.

Preparation of bar-bending schedule also as per Working Drawing.

Preparing daily/weekly and monthly progress reports as per approved work. WORK EXPERIENCE DESCRIPTION:

M/s. JHAJHARIYA NIRMAN LIMITED Bilaspur, C.G;-

1.

Client

Position

Period

Project cost

Description of project

2.

:

: S.EC.R Bilaspur C.G

: Structure Site Engineer

: May 2020 to Till date

: 78 Cr.

: Construction of two lane ROB in Bijuri Yard Crossing at Bijuri Anuppur (M.P.)

Client : DFCCIL, New Delhi

Consultant. : Lion Engineering & Consultant

Position : Structure Site Engineer

Period : April 2019 to May 2020

Project Cost : 80 cr.

Description of Project : Construction of two lane ROB in three level crossing at Sasaram, Bihar

3.

Client : S.E.C.R Bilaspur, C.G.

Position : Site (Earth work & Structure)

Period : November 2018 to April 2019

Project Cost : 100 Cr.

Description of Project : Anupur to Singhpur, 3rd Railway Line Project 4/3

Responsibility:-

Responsible for Execution and Construction of all structural work i.e. Major Bridge (PSC GIRDER), Branch Canal, Minor Bridge, Retaining wall, Wing Wall, Box Culverts, Earth formation of Railway line with study of drawing, as well as quality Control at site.

Responsible for site Productivity & Planning of day to day activities, as matching in line with monthly targets.

Daily co-ordination with Consultant on the subject of progress and quality coming onsite matching with the project schedule, as well as necessary approval of work done.

Preparation of bar-bending schedule also as per Working Drawing. M/s. ANUKUL CONSTRUCTION CO. Rajkot, G.J. :-

Client : Pench Diversion Project chhindwara (M.P)

Position : Structure Site Engineer

Period : March 018 to November 2018

Project Cost : 48Cr.

Description of Project : Aqueduct, Minor and Major Bridge etc. Responsibility:-

Responsible for Supervision & Excavation of Structure work.

Preparation of Bar- bending schedules also as per working drawing.

Preparing Daily/Weekly and Monthly progress report as per approved work.

Preparation of Sub-Contractor bill as per work done. M/s. SHREE RAM CONSTRUCTION Pvt. Ltd. Raipur, C.G. :- Client : S.E.C.R. Raipur, C.G.

Present Position : Site Engineer (Earth work &Structure) Period : February 2017 to March 2018

Project Cast : 70 Cr.

Project Length : 42 Kms

Description of Project : Rajnandgaon to Paniajob, 3rd Railway Line, C.G. 5/3

Responsibility:-

Responsible for Supervision & Execution of all construction works i.e. Earth formation, Minor Bridges, Culverts and Underpass

Preparation of bar-bending schedule also as per Working Drawing. Preparing daily/weekly and monthly progress reports as per approved work.

Preparaton of sub-contractor bill as per work done. STRENGTHS:

Discipline, Dedication and Determination is key attributes with strong analytical & communication skills.

Reliable, trustworthy, numerate and meticulous are the values I bring with me. I have ability to take initiative, work in teams, deal with work pressure and maintain efficient balance between productivity and creativity.

PERSONALDETAILS:

Father's name: Late Shakeel Khan

Date of Birth: 01 July 1995

Gender: Male

Marital Status: Unmarried

Natonality: Indian

Language Known: Hindi, English& Urdu.

ABOUT MYSELF:-

I have strong will power and positive attitude . Ibelieve that diligence has to go along with intelligence toachieve anydesiredgoal. I can workefectvelyina teamaccepting critcismand suggetion for improvement.

DECLARATION:-

Ihereby confirm that all the informaton provided above is correct upto my knowledge and I am fully responsible for all the details provided above. SALMAN KHAN Date: Place:

5/3



Contact this candidate