Resume:

Name: Adnan Rafiq Abdullah Wafa Dajani

Profession: Civil engineer

Graduation year: 1984

Education: Bachelor of Civil Engineering

Graduation Place: Aristotle Thales University, Greece

Date of birth: 1959

Address: Jordan - Amman - ministry of interior housing - al-quaismah area, yahya alqattan St. Building no. 40 - Phone 079*******

Brief history

I start my work august 1984 at the air force military as two years military service civil engineer, I was coordinator and execution for multi constructions and maintenance (buildings, water networks, sanitary, roads). After finish military service I started as employee in many companies and establishments, my first project was water network in rumtha city north of JORDAN Executive Director project manager with ENERGOPROJECT CO. The first five years I was civil Eng. Site engineer and resident engineer, after that I became project manager until now.

1

As Residential Construction Project Manager role:

Motivated team player and experienced project manager with proven expertise in residential construction projects.

• Worked with architects and construction workers to set goals and expectations

• Kept all work within prearranged budgets of 150 thousands-3million JD.

• Developed scope of work (SOW) on all projects

• Prioritized tasks to ensure efficiency and on-time delivery

As Construction Project Manager Role:

Planning, executing, monitoring, controlling and closing projects accountable for the entire project scope, project team, resources, and the success or failure of the project.

Also Costs management: Planning and estimating costs, and determining budgets Quality management: Planning and identifying quality requirements Human Resource management: Planning and identifying human resource needs

Experience

Until now project manager

2020-2018

Project manager us aide schools tahayneh co. al-bnayat school, wadi elseer school. Executive project manager. Governmental schools

Executive project manager sahab culture center Abu haleemeh co. CROPMERCY GROUB ORGANIZATION

Executive project manager sanad establishment for general contractions al-mwaqar Industrial vocational school governmental school 7000sq m

2

2018-2017

Project manager us aide schools SADEEN CO. group of schools in Amman and Irbid as coordinator follow up al activates of construction, from startup stage to Implementation completed and hand over.

From Date 1/11/2014 to Date 1/12/2017

Sanad General Contracting Est.

Project manager moaz bin jabal school in jerash, 2450sqm area three floors school governmental project

From Date 1/10/2013 to Date 1/10/2014

Self-work -constructions works as contractor,private buildings

From Date 1/10/2010 to Date 1/10/2013

Al-dajani & alalami engineering company

General Manager of the company, private buildings execution, hanger's maintenance private sector at National poultry co. (kerak city ) .

Follow up all tendering estimations, projects planning, and studies in general scope, coordination's with other companies, .etc.

3

From Date 1/10/2008 to Date 1/10/2010

Ahmed Jabr Contracting Est.

Sub-Contractor, Sanitation, Telecom, water network, sewage network

Multiple purpose water network (submittals, license, excavations, installations, maintenances, districts operation, water tanks reservoirs pumping system operations and inspections, water testing, controlling)

Projects water net ductile piping, water net steel piping, and water net Polyethylene piping var. diameters with house connections.

Wastewaternetwork (submittals, license, excavations, installations, maintenances, districts operation, water staition reservoirs pumping system operations and inspections, testing, controlling)

From Date 1/10/2006 to Date 1/10/2008

Sanad General Contracting Est.

Director of Executive Projects Implementation of the Duhlail Power Conversion Project - Civil Works

Follow-up projects of the Foundation schools Karak, Directorate of security of the southern region - Al-Hasa, housing project in Aqaba - the third phase

From Date 14/8/2005 to Date 25/9/2006

Assembly Engineering Office

Consultant Project Manager Consultant Supervising the implementation of Maya Clinic Complex with an approximate area of 7000 m 2, and the Hajjawi Housing Complex Project with an approximate area of 3000 m 2

4

From Date 1/2/2005 to Date 14/8/2005

Ain Al-Sultan Contracting Est.

Executive site engineer implementing a sewage network Abdoun Al-Wastani with an approximate length of 8000 lm. this project was under the Amman municipality consulting it was critical and sensitive which was between the ambassadors houses need high quality fast execution daily inspections hard work shifts 24 hors safety party skilled workers so I was full activated full time follow-up wastewater districts pipe lines manholes ( license, planning, surveying, alignment, excavation, pipe laying, water testing, construction concrete works manholes, traffic operation safety sings, warning taps, backfilling, pavements, handling)

1/6/2004 to Date 1/2/2005 From Date

Sanad General Contracting Est.

Director of the Executive Project Implementation of the Amman tourist beach project - the restaurant building and the service building and swimming pools

This project involved me in the suitable design of the pool and all constructions of the mechanical room and reservoirs and all of pipe net and landscaping of the site

From Date 1/12/2003 to Date 1/6/2004

Ain Al-Sultan Contracting Est.

Director of the Executive Project Implementation of the Fuheis Water Project Phase II - Water Network Ductile and Polyethylene various diameters of 12000 m.

( license, planning, surveying, alignment, excavation, pipe laying, water testing, construction concrete works manholes, traffic operation safety sings, warning taps, backfilling, pavements, handling) main and submain net and house connections

5

From Date 1/8/2003 to Date 30/11/2003

Construction Company for Contracting

Executive site Engineer Implementation of IT building in the University of Jordan with an approximate area of 15000 m 2, all actives where my responsibility such as

Excavations, foundations, skeleton construction works, plastering, tiling, carpentry works, mechanical works, some of electrical works, boundary works, side walk and pavements, all where in programing process step by step, storage follow up, human resources and groups planning schedule weekly, sub metals registrations .

From Date 25/3/2003 to Date 21/7/2003

Yaqoub Salah Contracting Est.

Director of an executive project Implementation of the building of the individuals club in the medical city with an approximate area of 2700 m2, skeleton works, some of finishes

From Date 1/7/2002 to Date 1/3/2003

Sabri Alsalaman Contracting Est

Director of an executive project Implementation of a comprehensive health center in Madaba governorate with an approximate area of 850 m 2, all of activates followed

Up step by step (excavation, foundation, stone walls, walk sides, finishes, as per drawings and specifications, quantity surveying) .

6

From Date 1/2/2001 to Date 30/6/2002

Sanad General Contracting Est

Place Of Work Job Project

Executive Site Implementation of Marka Housing Project Phase III - Urban Development 84 residential apartments and the entire infrastructure with an approximate area of 12,000 m2, big housing project

Excavation, foundation, skeleton concrete and steel works, plastering, tiling, wood works, aluminum works, mechanical water nets main and sub main and house connections, sewage works main and sub main and house connections, retaining walls, main and secondary roads, installation and operating all activities as per

Specifications and drawings

From Date 15/8/2000 to Date 16/1/2001

Al – Mes -her Trading & Contracting Co

Project executive Manager executive Major Road projects mixtures in different regions in Saudi Arabia in approximate quantity 65000 m 2, responsible for asphalt mix inspections, supervisor of all activities on site, managing

All transportations, tools, equipment's, implementations

Zayed Consulting Engineers

Project Manager

Supervising the projects of roads, buildings and maintenance at the modern borders center in the Kingdom of Saudi Arabia, customs housing flats of 500 unit maintenance works, customs roads maintenance, all custom region services, stories, refrigerators, garages.. Etc.

From Date 15/4/2000 to Date 16/7/2000

Engineer Fathi Faraj Allah

Engineer Executive site Implementation of a building at the Polytechnic University with an approximate area of 6000 m 2, skeleton reinforced concrete and stone building

7

21/6/1999 to Date 10/3/2000 from Date

Pioneering Company for Engineering and Contracting

Executive Project Manager Implementation of the building of the Water and Environment Center in Hamra Al Sahan - Balqa Applied University with an approximate area of 500 m 2, excavation, foundation, skeleton reinforced concrete with stone cover walls, insolation,roofing, electromechanical works follow up, finishing works as per drawings and specifications

From Date 27/9/1998 to Date 13/5/1999

United Group Construction

Construction site engineer Implementation of the military antiques building in the martyr's house with an approximate area 1200 m 2, excavation, foundations reinforced retaining high walls, military museum, skeleton works only .

From Date 9/6/1996 to Date 30/9/1998

Pioneer Company for Engineering & Contracting

Place Of Work Job Project

Executive Project Manager Abdoun Commercial Complex Project - Naghwi Complex 2800 m2, Abdoun near the US Embassy

Project Miscellaneous Water Capital - Implementation of various water lines - ductile, polyethylene, iron pipes, welding diameters A variety of approximate quantity 12000 m. I,

Multi project water network in Amman city

Multiple purpose water network (submittals, license, excavations, installations, maintenances, districts operation, water tanks reservoirs pumping system operations and inspections, water testing, controlling)

Projects water net ductile piping, water net steel piping, and water net Polyethylene piping var. diameters with house connections.

8

(submittals, license, excavations, installations, maintenances, districts operation, water staition reservoirs pumping system operations and inspections, testing, controlling)

National Telecom Project

Execution of lines and cables of communication cables in the Dair Abu Said area with an approximate length of 3000 m, (license, surveying, alignment, safety instructions and signs, traffic operation control, excavation, pipe laying, mandrel testing, manholes constructions, Installations, pole installation, box cabinet installation, fiber optic cables installation, backfilling, pavements, handling .

From Date 1/3/1995 to Date 30/4/1996

Al-Qana'a Contracting Est.

Director of an executive project Roads projects in Ajloun - Irbid highway Ajloun main –ebean triangle Abeleen - roads in the wahadna and Afana and rock and flying village and Kofranja and anjarah and Rasson and Ba'oun and Ras Maunif and Halawa and eshtafina and Sanar area approximate 17000 m 2

Main and sub main agriculture roads, excavations, back filling, rock filling, sub base, base coarse layers, testing, m.c coating, aggregates with asphalt sub main roads, asphalt mix for main roads, curbstone and walk side tiling .

22/11/1993 to Date 1/3/1995 from Date

Office of Arab Engineers consultant engineering

Consultant project manager of supervising secondary school for girls in Karak governorate with an approximate area of 3400 m 2

Check the design approvals, quantity checkup, schedule programing of execution stages, controlling all activities and testing materials. Checking all finance payments of contractor, office paper works and monthly reports .

9

From Date 15/9/1992 to Date 26/9/1993

Toukan Company for Trading and Contracting

Executive Project Manager Implementation of Busira School in Tafileh Governorate with an approximate area of 3000 m 2

As project manager responsible for all activities, human resources, equipment's, materials, steel, sub metals, approvals, excavation, foundation, concreting, steel frameworks, casting concrete, management of the project finance payments, quantity surveying and labors activities, testing, implementation the project, casting concrete was manually in site .

From Date 1/11/1991 to Date 21/8/1992

Sanad establishment for General Contracting

Engineer Executive site Implementation of public schools in Balqa - Seihan School and Kasib School and Zubia School with an approximate area of 1250 m 2, responsible for

Excavation, foundation, steel deformation, casting in site concrete, calculations for quantities of steel, concrete, testing materials in laboratory.

From Date 22/5/1990 to Date 30/6/1991

Al-Bashir Engineering Office

Engineer supervision of private buildings in the capital province with an approximate area of 600 m 2

As consultant, check up all works, excavation, skeleton works.

From Date 4/11/1989 to Date 1/5/1990

Eng. Ghazi Al-Naji Office

Engineer of supervision of private buildings in the capital Governorate with an approximate area of 350 m 2

10

From Date 2/6/1988 to Date ` 30/10/1989

Mohammed Saeed Ali Odeh

Place Of Work Job Project

Resident executive engineer Roads projects in Mafraq Governorate, Rusaifeh, Madaba Governorate and Eastern Dhahiba - final face with an approximate quantity of 18000 m 2

All roads are sub main celling coat paved manually, excavation, sub base, base course, and layer of m.c hot asphalt, rendering coarse aggregates, rolling.

From Date 1/6/1987 to Date 1/6/1988

Al-Quds Company for Technical Supplies

Executive Project Manager Project of the Ramtha Water Network - Implementation of main ductile pipe lines diameters 100 mm - 400 mm with fittings pieces and taps and installation of fire extinguishers on the pavements fire hydrant with an approximate length of 2400 m.

License, alignment, safety requirements programing and installation, machinery work programing, sub metals approvals, plan of weekly work, human sources, skilled people labors, equipment's for water test, tools, communications with the authorities for normal workability, fuel programing, pocket money, inspections, operation control, hand over .

From Date 1/7/1986 to Date 31/1/1987

Modern Roads Contracting Est.

Site Engineer - Implementation of Excavation Excavations and Works of Al-Base course and a Final Surface Approximate Area 6000 m 2 miscellaneous maintenance Ain Al-Basha Road, site investigation, site leveling, supervision, license, safety requirements taps, excavation, sub base, base course, hot m.c asphalt coat, celling coat asphalt with topping aggregates, rolling, hand over .

From Date 1/9/1984 to Date 1/7/1986

Place of Work Job Project

Airport Engineering / Air Force Military Service Engineer Supervisor of Command Buildings / Air Force Expansion of the leadership building - Marka Area of expansion 1200 m 2