Reference will be furnished on demand.
Babar Ali
(PEC: Mech/28199)
Contact
Address:
P.O Khas Sabazkot Tehsil Pasroor Sialkot
Punjab Pakistan
Phone:
+92(0)308-***-****
Email:
**********@*****.***
Education
BSc Mechanical Engineering (2010~14)
University of Engineering and
Technology, Lahore (CGPA 3.516/4)
Core Skills
Mechanical drawings, layouts,
flow sheets and manuals
Fabrication, Erection &
Commissioning
Root cause analysis
Leadership, Adaptable,
Impassive, responsible and
effective communication skills
Self- driven & result- oriented
Soft Skills
MS Office, Auto CAD
SAP PM Module
Achievements
Visited China two times and local
industry inspections arranged LCL
Awarded Scholarships & 1st
Position during education career
Attended PMP Workshop &
FLSmidth Technology Seminar
Hobbies
Technical & Urdu literature
Social media surfing
Languages
English – Professional level
Urdu – Professional level
Punjabi – Native
Career Objective
Mechanical Engineer with 5+ years’ experience working onsite rotary equipment maintenance, brown field & retrofit projects. Seeking a mechanical engineering role at your organization in managing, execution and evaluation rotary equipments behavior to further for the vital goals. Professional Experience
Sr. Assistant Manager – Rotary Kiln (01-08-2017 to Present) Area In-charge, Lucky Cement Limited, Pezu Plant, KPK Pakistan
Planning, scheduling and execution of preventive & routine maintenance activities for the rotary equipments.
Carry out daily, weekly, monthly basis inspections and recording for the critical equipment’s e.g feeding elevators, process fans, rotary kiln, cooler, clinker transport, bag houses, etc.
Procurement of the critical equipment’s spares, consumable and their inspections as per drawings and requirement
Planning and managing retrofit modification and projects for the uninterrupted process
Managing the manpower duty shifts
Co-ordination within and outside the departments for resources
Active end user of SAP S/4 Hana PM Module
Assistant Manager – WHR Power Plants (11-10-2015 to 31-07-2017) Area In-charge, Lucky Cement Limited, Pezu Plant, KPK Pakistan
Planning and managing routine and annual shutdown maintenance for the water tube boilers, pumps, cooling tower, steam turbine.
Procurement of critical spares for pumps, boilers and turbine, etc. Projects
1. Hot Alignment of Rotary Kiln by FLSmdith (February,2020)
Co-ordinated for the measurements of Kiln Axis, crank, shell ovality and axial balance, root clearance and backlash of the girth gear
Supervised adjustment of Kiln rollers bearings for axis correction 2. Cement Production Line 7500 TPD, Brown Field (EP Project, M/S Sinoma TCDRI) (May, 2018 – December, 2019)
Worked for the initial overall documentation for the equipment’s selection basic design, layouts and minutes of meeting
Loading data and civil foundations for the equipment’s
Fabrication of Kiln area process ducts, chutes, and assembly of pre- fabricated structures and procurement of steel plates, profiles, etc.
Erection and commissioning of rotary Kiln, clinker cooler, transport and storage and dust collection system
3. Waste Heat Recovery Power Plant 10 MW, Brown Field (EP Project, M/S Sinoma-EC) (April, 2016 – January, 2017)
Initial documentation, layouts, fabrication of process ducts, piping, storage tanks, rain sheds and area inspections
Erection and commissioning of water tubes boilers, steam turbine, water treatment plant, cooler tower and de-aerator and condenser 4. Erection and commissioning of Cooler Bag House Fan, Centrifugal pump, Expansion Joints, Super Heater Tubes & Vaporizer Headers 5. Master Data compilation for the SAP PM Module Implementation for the Pezu Plant (Overall)
6. Documentation and layout of Loesche Cement Mills (LM56.3+3) 7. Replacement of Boiler Super heater tubes and Vaporizer modules