NAME:-Ramesh Kumar
ADDRESS:-vill-post-kothi,district-satna(M.P)
CONTACT:
Email:adix75@r.postjobfree.com
adix75@r.postjobfree.com
adix75@r.postjobfree.com
Educational Details:
BE
Electronics &Communication From RGPV University, Bhopal (M.P)
Four year degree in 2008
PROJECT: Medhaj Techno Concept Private Limited –SAUBHAGYA (Pradhan Mantri Sahaj Bijli Har Ghar Yojana)
DVVNL, Agra (UP)
CURRICULAM VITAE
OBJECTIVE:
To serve a challenging & a responsible position where I can apply my skills and play an important role in overall development of the organization.
EDUCATION DETAILS:
BE Electronics &communication discipline from RGPV University Bhopal (M.P.) with 60.03% in 2008 year.
12th from M.P. Board Bhopal with 66% in 2002 year.
10th from M.P. Board Bhopal with 69% in 2000 year.
PROFESSIONAL EXPERIANCE:
Medhaj Techno Concept Private Limited –Saubhagya (Pradhan Mantri Sahaj Bijli Ghar Yojana) DVVNL, Agra (UP) 26 June 2018 to 11 February 2019 Date )
Project Engineer (PMA)
Work Profile:
Digitization of DVVNL electricity Board resources ( LT Infra,HT Infra and New connection)
SAUBHAGYA Project :-
Saubhagya Project Engineer:- Responsibilities:
Attends the Weekly Progress Meetings (Internal as well as with Client) and assist in preparation of Minutes Of Meetings.
Monitors work in progress and prepares weekly report of the status of each.
progress of work activities, procurement and operations to ensure timely completion of the project.
Finalize Guaranteed Technical Particular (GTP) of equipment to be installed.
Coordination with DISCOMs for GTP approved.
Finalize Technical specification, drawings of equipment to be installed at site.
Raise Suggestions for freezing of BOQ of material and works to be executed, verification,
modification, if any.
Ensure and report about quality of material being used and quality of work being executed
confirming GTP, Technical specification, drawing, general terms and conditions etc at all stage.
Verify and forwarding the site observation report (SOR) received from field supervisor to Team Leader with own observation and recommendation.
Co-ordination with testing team of TKC for testing and certifying commissioning of DT,11kV
Lines, Earthings as per specification.
Sample check on daily basis for each type of work under his jurisdiction and prepare feedbac will be forwarded to Team Leader.
Creation of Village/Mazra wise camp roster for releasing the electrical connection to rural households.
Organising, conduct meeting and submitting report/Proceeding.
Taking suitable action on the instruction given by client during meeting & action.
Preparation work completion report/.
Report compilation regarding progress of the project.
Providing checks and super checks of works after their execution.
Collection of mobile Telephone No. of all Gram Pradhan and take necessary feedback for ongoing works under Saubhagya scheme.
To ensure compliance of defect pointed out by TPIA or company officials.
Examine and recommend the proposals for extension of time for approval of DISCOMs, if required.
View/Query/Analysis
Network Laying/ reconfiguration
PROJECT: HCL-Technology Pvt.Ldt - R-APDRP(Bijli Board) DHBVN Hisar (HR)
PROJECT: Ms./ KISAN MOULDINGS
Erection and commissioning of Composite Pipe, and Injection Moulding.
PROJECT: M/s BIOLINE INDIA PVT LTD:INDORE (MP)
Electronics Maintenance of Blood Bank equipment And Hospital Equipment’s
PROJECT: Ms/ SIMPLEX INFRAS TRUCTURE Pvt.Ltd.
Erection and commissioning of Electronics & Electrical at site…also handled
HCL TECHNOLOGY PVT. LIMITED – DHBVNR-APDRP Project(Data Center-hisar Haryana)(01March 2014 to 27 April 2017 )
Engineer (IT-N/W& Application Support)
Work Profile:
Digitization of electric program resources (33 KV Substation, 11 KV feeders, DTs,HTs and electric poles)
R-APDRP WB Project :-
GIS (ARC MAP 10) Modules – (01August 2016 To 27 April 2017 )
GIS ARC MAP 10:-Involved in following activities here mentioned below
Network Analysis of updating taking place in field.
Consumer indexing.
Snapping and designing of network updated in field.
Assessment of proper count of consumers to be tagged into GIS.
Network Mapping
Operations Management
Resource Management Mobile Workforce Management
Customer Information Management
Single Line Diagrams
View/Query/Analysis
Network Laying/ reconfiguration
R-APDRP Application :- Modules – ( 01 Nov. 2015 To 31 July 2016 )
GIS :- Network Analysis Change Intimation
GIS Reports ( substation information, DT,HT,Feeder)
MDAS :-MDAS & EA Report
(Ewatch data centre,integrator,enerlyser,CIM,Global)
WAM :- Maintenance management Change Intimation Asset Management
MBC :- All Reports, Application support
R-APDRP INFRA :- (01 March 2014 To 31 October. 2015)
Network :LAN, WAN, VPN
Routing Protocols :Static Routing & Dynamic Routing
Routers :HP
Switches :HP
Protocols : TCP/IP, SNMP, UDP, SMTP, LDAP
Desktop Platforms : DOS, Windows XP/VISTA/7.
Link : Airtel, Sify
Hard ware installation and testing
M/S KISAN MOULDINGS LIMITED – Tarapur,MH(27 Dec. 2012 to 10 Sep. 2013date )
Shift Engineer(Production / Maintenance)
Work Profile:
Handling of IT (Operation & Maintenance )
Hardware installation
Day to Day activity reporting with Senior Management.
BIOLINE INDIA PVT LTD- Electronics Complex Pardesipura Indore (M.P.) (Sep. 2010-Feb 2012)
Shift Engineer.
Work Profile:
Maintenance of Blood Bank equipment And Hospital Equipments etc.
Planning of Preventive & Breakdown Maintenance.
Handling Quality Control as per Equipment Standard.
M/s SIMPLEX INFRASTRUCTURE PVT. LTD – Vindhya Nagar (M.P.)(July 2009 ~ July 2010)
Electrical Assistant Engineer(maintenance)
Work Profile:
Handling of Operation & Maintenance of Electronics &Electrical depart.
Inventory Management.
Independently handling of Lesioning work.
Day to Day activity reporting with Senior Management.
PROJECT: Ms/ TP PVT LTD. Call Center Indore(M.P.)
Electronics and electrical of Machine maintenance at the hole building.
PROFESSIONAL PROJECT:
Major project:
1. Traffic Density based of Light Control System.
Minor project:
2. 12 VoltBatteryCharger.
PROFESSIONAL TRAINING:
1. VOCATIONALTRAINING CENTRE”.Durdarsan AM studio in Riwa (M.P.) .
2.Summer Vacation Training in Smrit Net Com Bhopal(M.P.)
3.Knowledge of computer programming language like C, C++, Basic
PERSONAL STRENGTH:
Self confidence
Optimistic
Hardworking nature
Team skills
PERSONAL DETAILS:
Date Of Birth: 25/07/1987
Father’s Name:
Sri PanchamLal
Language known: Hindi, English,
Hobbies:
Traveling, Meeting New People,reading news paper
Marital status: married
PRESENT ADDRESS:-Vill Post Kothi, Ward No. 12
District Satna (mp)
M/s TP (Tele performance)Company – Indore (M.P.) (Jan 2009-May 2009)
Tech Support.
Work Profile:
Technical support
Work in MS-Office
Breakdown as well as preventive maintenance of electronics equipment’s.
Supervision of Plant Utility Equipment’s (Generator sets, Compressors, Cooling towers, Water pumps &detector’s).
PROFESSIONAL PROJECT:
Major project:
Traffic density based of light control system.
Minor project:
12 Volt Battery chargers.
PROFESSIONAL TRAINING:
Smrit Net Com in MP Nagar Bhopal.(45 days training)
(LAN, MAN, WAN) connection,Software install, Creping.
COMPUTER SKILLS:
Operating Systems: WINDOWS 98/XP/2000, Vista
Office Tools: MS Office
Basic Technical Strength:-
Configuration network device - DHCP
IP Phone - DNS
OSI Model - Desktop support activity
DECLARATION:
I Mr. RAMESH KUMAR PRAJAPATI hereby declare that the above given information is true as per my knowledge.
Signature