RESUME
VIJAYA RAJ.K
Cell: +917********* NO: **/135, k.k Road, Venkatapuram, Ambattur, Chennai -53
Objective
A challenging career which enables to me utilize my skills in the best possible manner and give me adequate opportunities to contribute to the overall growth of the organization.
Board
%
Institute & Period
Diploma in mechanical engineering
83%
Muruga Polytechinic College,
Kallakurichi. (2010 – 2012)
HSC
51%
St. Xavier's Hr. Sec. School
Mugaiyur. (2009-2010)
SSLC
73%
St. Xavier’s Hr. Sec. School
Mugaiyur. (2007-2008)
Education QualificationEducationaQualification
Personal Profile
Father’s Name : P.kannan
Date of Birth : 02/09/1992
Gender : male
Marital Status : Un-Married.
Languages Known : Tamil, English, Hindi, and Malayalam
Religion : Hindu
Nationality : Indian
Experience : Operator In CNC machine and job Quality at Lucas Tvs company in padi, Chennai for 2 years from 20/07/2012 to 16/07/2014.
: Data entre working luces TVs company padi, Chennai at 25/07/2014 to 15/04/2016
: HVAC duct Four man working smooth international company in Dubai, for 04/08/017 to up to date.
Role: Technician,
HVAC systems which includes FCU, FAHU, AHU, Condensing unit, VRF, Copper pipe connections, chill water systems, PICV, Exhaust fans, G.I ducts, P.I ducts, motorized dampers, VAV, VCD, splitter damper, grills and diffuser.
Installing, testing of all type works HVAC systems for villas and residential buildings as per design and UAE regulations.
Testing and commissioning which includes Room temperature testing, Air Balancing, Noise Test, smoke test in smoke extract systems.
Duct fabrication, Installation Inspection.
Ensuring safe work environment, controlling the use of additional material and avoid damage and waste.
Carrying out duct able or package AC installation.
Coordinating with the sub-contractors to complete the work in time.
Assessment of work done in the previous day.
Checking the labour status.
Training the subordinates and junior engineers.
Preparation of material list as priority wise in unit area and substation.
Preparing duct as per site condition.
Monitoring & recording regular site progress.
Discussion of future work with senior staff and project control.
Daily work allocation, time scheduling, preparation of daily and monthly reports
Declaration
Here declare that the above said details are true and correct to the best of my knowledge.
Thanking You
Yours faithfully Place:
Date: K.vijaya raj