Post Job Free
Sign in

Bridge Engineer

Location:
Hyderabad, Telangana, India
Salary:
520000
Posted:
December 23, 2020

Contact this candidate

Resume:

DONGURE NAVEEN KUMAR

Mobile: +919*********.

E-Mail: adiwiq@r.postjobfree.com

Career Objective:

Seeking for a responsible and challenging position in Structural Engineering domain with a leading organization of repute to nurture my skills practically and grow contributing the most to the organization. Profile Summary:

A Engineer who thrives to be innovative and practical.

Knowledge on Auto-CAD, Staad Pro, e-Tabs, Safe, SAP 2000, Adsec.

Good communicator with good analytical inters personal and presentation skills. Professional Experience:

Worked as Trainee Engineer in “Oms Infra Consultants Pvt.Ltd.” from 11/06/2018 to 11/04/2019 & Junior Engineer from 04/2019 to present (2.6 years). Core Competencies:

Setting up quality standards for the projects and ensuring their stringent adherence.

Under-taking Consulting and thriving towards best design & development methodologies. Other Interests:

Eager to explore all types of Technologies and Applications.

Playing Cricket, Football and indoor games.

Vedic Astrology, Vastu.

Education:

Qualification

Discipline

Institution

University/affiliation

Year

CGPA

Master of

Technology

Structural

Engineering

VNR Vignana Jyothi

Institute of Engineering &

Technology.

JNTUH

2018

7.41

Bachelor of

Technology

Civil

Engineering

Gitam University

Hyderabad.

Gitam University

Vizag

2015

7.43

Intermediate MPC Narayana Institutions. AP State Board 2011 73.5 High School Jesus Mary High School.

AP State Board 2009 7.43

RESUME

Project works in Under Graduation:

Project Title: Design and Analysis of G+ 5 Seismic Resistance Structures. Role: Team Member

Project works in Post-Graduation:

Project: 1

Development on Mechanical & Durability Properties of Special Concretes. Project: 2

Investigation on Engineering Properties of Self Compacting Geopolymer Concrete. Project: 3 (Major Project):

Experimental and statistical Modeling of Binary Blended Hybrid Fiber Reinforced Geopolymer Concrete.

Studied on effect of Basalt fibers & Polypropylene fibers in geopolymer concrete by replacing cement with Fly-ash and GGBS at equal proportions, Development of combined fiber reinforced geopolymer composites, Mechanical Properties of Binary Blended Hybrid Fiber Reinforced Geopolymer Concrete under heat curing. Studied Durability Characteristics like Sorptivity, Water Absorption, Abrasion Resistance, Acid Resistance (H 2SO4), and

Sulphate Resistance (Mg SO4) & Chloride Resistance (HCL.) Validated Project using Statistical Modeling.

Linear Regression Analysis using M.S. Excel.

Linear Regression Analysis using Mini tab software.

Linear Regression Analysis using Mat Lab, knowledge on Neural Network Modeling using NF tool & CF Tools in mat lab.

Nonlinear Regression Analysis using Python software. List of Publications on Research Work in Post-Graduation: Journal Title of The Journal Status

I Managers Journal on

Civil Engineering (free

Journal)

Strength Properties of Binary Blended Polypropylene and Basalt Fibers. Reinforced Geo polymer Concrete.

Dec-17

IRJET

Durability Properties of Fiber Reinforced Geo polymer Concrete. Nov-17

JETIR

Abrasion Resistance of fiber reinforced geo polymer concrete. Nov-17

I Managers Journal on

Civil Engineering (free

Journal)

Investigation on Relationship Between Compressive & Flexural Strength of Binary Blended Hybrid Fiber Reinforced Geopolymer Concrete.

Feb-18

Completed Projects:

1. Rehablitation & upgradation of NH 340 from km 0/0 to km 60/380 (Design Ch. 0/0 to 60/025 excluding Km55.600 to 57.650(2.050 Km)) (Rayachoty to Angallu section) to two lane. 2. Construction of 4 lane Bypass to Vizianagaram Town of NH-43 (New NH-26) from Km 537+600 to 552+000 (Raipur to Visakhapatnam Section) on EPC mode under NH (O) 2016-17 in the state of Andhra Pradesh.

3. Up-gradation of Paithan (Pategaon)-Mungi Hadgaon Bodhegaon- Ladjalgaon - Ghogaspargaon - Phulsangvi

- Ukhandachakla Dahiwandi - Shirur to 2-Lane with paved shoulder/4-Lane configuration (Package I - 56 Km.) for proper structuring and implementation of project on EPC mode in the state of Maharashtra. 4.Construction Of Proposed 4-Lane Rob And Its Approaches In Lieu of Existing Level Crossing No.102 At Km 281.20 on NH 205 Between Chandragiri And Tirupati West Stations In The State Of Andhra Pradesh (2nd Call). 5.Rehabilitation and Upgradation of NH-167 from Design km.157.707 (Alinagar) to km. 187.723

(Miryalaguda) to Two lane With Paved Shoulders in the State of Telangana on Engineering, Procurement & Construction (EPC) Basis Contract.

6. Rehabilitation and Upgradation of NH-167 from Design km.187.723 (Miryalaguda) to km.234.434

(Kodhada) to Two lane with Paved Shoulders in the State of Telangana on Engineering, Procurement & Construction (EPC) Basis Contract.

7. Two Laning with paved shoulders from Ex. Km 506/100 to Ex. Km 508/700 and Ex. Km 518/700 to 534/350 Mangalore to Thiruvannamalai Road of NH-75 (Old NH-234) in Andhra Pradesh. 8. Construction Of Two-lane With Hard Shoulders Of Existing Khupa - Hayuliang - Hawai Road (NH-113) On EPC Basis From Design Km. 0.000 (khupa) To Km. 63.131 [existing Km 45.050 of (khupa - Hayuliang Road) To Km 63.131 (hayuliang - Hawai Road)] In The State Of Arunachal Pradesh Under SARDP-NE . 9.Two-lane of Existing Hunli to Anni Road on EPC Basis from Design Km. 92.500 to Km. 120.000 [existing Km 97.670 to Km 126.075] In the State Of Arunachal Pradesh under SARDP-NE. 10.Two-lane of Existing Hunli to Anni Road on EPC Basis from Design Km. 21.5 to Km. 37.5 [existing Km 21.450 To Km 40.160] in the State of Arunachal Pradesh under SARDP-NE. 11. Four laning of Harangajo (KM. 244.000) to Balachera (KM. 275.000) OF NH-54(Ext.). Package No: EW- II (AS-14) in the State of Assam on EPC mode.

12. Construction of Two-Lane with hard shoulders of Pfutsero - Phek Road on EPC basis from existing Km 19.900 To Km 40.090 [Design Km. 20.000 to Km. 40.000] in the state of Nagaland under SARDP-NE Phase A. 13.onstruction of Two-Lane with hard shoulders of Chakabama - Zunheboto Road on EPC basis from existing Km 52.370 to Km 79.040[Design Km. 50.000 to Km. 75.00] in the state of Nagaland under SARDP-NE Phase A.

14. Construction of Two-Lane with hard shoulders of Pfutsero - Phek Road on EPC basis from existing Km 40.090 to Km 65.300 [Design Km. 40.000 to Km. 62.558] in the state of Nagaland Under SARDP-NE Phase A. 15. Construction of two-lane with hard shoulders of Chakabama-Zunheboto road of Package IV [Design Km 75.000 To Km 95.000] and Package V [Design Km 95.000 to Km115.534] in the state of Nagaland under SARDP-NE.

16. Construction of Two-Lane with hard shoulders of Chakabama - Zunheboto Road on EPC basis from existing Km 100.345 to 122.250 [Design Km. 95+000 to Km. 115+534] (Design Length - 20.534 Km) in the state of Nagaland under SARDP-NE Phase A.

17. Rehabilitation and Up-gradation of Dattaluru to Kavali section of NH-167BG from existing Chainage 36.400 to Km 107.830 (Design Chainage from Km 36.400 to Km 107.530) to Two/Four lane with paved shoulder configuration in the state of Andhra Pradesh on Engineering, Procurement & Construction (EPC) Basis Contract. Authority Projects:

1. Construction of Two-Lane with hard shoulders of Chakabama - Zunheboto Road on EPC basis from existing Km. 00.000 to Km. 25.760 [Design Km. 0.000 to Km. 25.000] (Design Length - 25.00 Km) in the state of Nagaland under SARDP-NE Phase A.

2. Construction of Two-Lane with hard shoulders of Chakabama - Zunheboto Road on EPC basis from existing Km. 25.760 to Km. 52.370 [Design Km. 25.000 to Km. 50.000] (Design Length - 25.00 Km) in the state of Nagaland under SARDP-NE Phase A.

Responsibilities:

1. Detailed design and drawings of Bridges & culverts (pipe culverts, slab culverts, and box culverts). 2. Detailed design and drawings of, Box type Minor bridges, VUP's & PUP's. 3. Structural Design of RCC cover Drains & PCC drains. 4. Work collaboratively with other team members to develop design solutions and deliver documentation. 5. Performing and checking bridge design calculations and plans for projects and preparing technical reports. Personal Details:

Date of Birth: 22-07-1993.

Address: A/598 BDL Township Bhanur Patancheru Mandal Medak District. Hyderabad. Declaration: I hereby solemnly declare that the above written particulars are true to the best of my k nowledge. Dongure Naveen Kumar.



Contact this candidate