Post Job Free
Sign in

Piping Engineer/Supervisor (Power Plant.Oil and Gas)

Location:
Philippines
Posted:
December 22, 2020

Contact this candidate

Resume:

POSITION DESIRED: Piping Engineer / Piping Supervisor

Availability Date: 1 month Prior to work engagement if selected

I hereby apply, any position that commensurate my qualifications. And be among the elite work force of your good and prestigious company.

KEY COMPITENCIES:

A positive attitude to developing engineering experience across diverse engineering projects within the organization.

Having worked in different countries, companies & offices for a number of years. For both local & overseas, my general knowledge of overall Piping Execution, Inspection & documentation in office duties is one of a high standard.

Capable for any Piping related jobs such as: Material control, Engineering, Welding Inspection, Pre-commissioning, Piping execution for underground & aboveground.

Certified/Approved PTW Receiver (Saudi Aramco Riyadh Refinery)

Knowledge in ASME 31.1 (POWER PIPING)

Knowledge in ASME 31.3 (PROCESS PIPING)

Knowledge in ASME 31.4 (PIPELINE)

Knowledge in ASME 31.5 (REFRIGERATION AND HEAT TRANSFER COMPONENT)

Knowledge in ASME 31.8 (GAS DISTRIBUTION)

Knowledge in API 570 (Inspection Code ) Inspection, Repair and Alteration of In service line

Rehabilitation & Revamping Experienced in SAUDI ARAMCO and SONATRACH (Oil and Gas)

Sex: Male

Nationality: Filipino

Religion: Roman Catholic

Height: 5’7”

Weight: 145lbs

Passport No.: P1506811A

Basic Capabilities

* CIMS (Construction Integrated Management System)

* Database Control Engineer (Piping Department)

* Basic knowledge in Autocad

* Knowledge in Naviswork 3D model Operation

* MS Office

Employment History (RECENT 11 COMPANY ABROAD) excluding Local

Local Employment

(1)Process Operator : Petron Refinery ( Limay Philippines)

Plant Type : Oil and Gas

Duration : 3 yrs (2001 to 2004)

(2)Machine Operator :Texas Instrument (Baguio City Philippines)

Plant Type : Semi-Conductor

Duration : Duration : 1 yr (1998 to 2000)

Overseas

1.Project : UZGTL (Uzbekistan Gas to Liquid Project)

Type : Greenfield (Oil and Gas)

Company : ENTER ENGINEERING (PMT-Engineering)

Position : Piping Engineer

(Deputy Technical Manager)

Location : Kashkadarya, UZBEKISTAN Inclusive Dates: August 10,2018 to Present

Area Responsibilities:

UG Piping (Firewater, Cooling Water, OWS Line, Effluent Line)

AG Piping Utilities and Process

-Monitor progress and performance of the Fabrication Subcontractor to ensure that he performs to the approved schedule, specification and standards

-Coordinating with the Piping Installation Superintendent and Mechanical Completion Team in preparing and clearing any construction punch list items and testing requirements.

-Coordinates with QC, Painting Supervisors and Client rep. for hydrotest and completion

-Prepare necessary documents as and when required for all additional work requirement.

-Responsible for MTO take off and follow up

-Responsible in executing Hydrotesting based on the Test Packages which are already released for testing.

-Raise Revision Orders to the Yard personnel for any works performed outside original scope of work/change of the scope.

-Iso Drawing Checking and Status Monitoring for issuance to Contractor.

-Ensure that all drawing is Updated and issued to Contractor as per latest Revision.

-Ensure that only suitable erection equipment, tools and inspection instruments are used for the execution of work. Verify the qualification of personnel carrying out the work

-AS-Built Drawing checking and Confirmation if it is Design Change or Fault by sub contractor.

-Provide Daily Supervisory Surveillance checks and record, ensuring that contractor management and supervision are providing safe working condition, experienced/qualified supervision and manpower, with reliable, well maintained equipment to execute fabrication scopes to support field installation schedules and targets.

-Dealing with general technical and practical problems related to the erection

-Review and Comment on the PID for Hydrotest Diagram (System and SubSystem)

-Review and Comment of Contractor Procedure and Method of Statement as per Local and International Standard.

-Supervise and Guidance of Fabrication and Site Erection to ensure safe productivity and efficiency result in meeting the production targets.

-Check MIR (Material) status based on availability and Spool wise.

-Coordinate with the Contractor for the Plan and Schedule of execution

-Technical Support for Piping

-Progress Monitoring on Shop and Field as per Plan

-Assure the effective and efficient management of the construction change control process both for the Companies and the Sub- contractor construction activities.

-Supervision of quality tests related to the installation, prepare erection inspection forms to confirm compliance with Technical Documentation

-Routinely study, check, review and validate the contractors correct interpretation and compliance with the latest revision of ISO Drawings, Quantities and Specification.

-Ensure that fabrication and construction hazards and risks are fully considered by designers, Contractor and Subcontractor and that appropriate mitigation actions are implemented, and appropriate action taken

-Review and approve project procedures, specifications, material requisitions, technical bid summaries, stress calculation reports when required.

-Update Progress as per project schedule, provide input for monthly progress reports and drawing indices to Project Control.

-Preparing, Reviewing, Issuing and follow up of all Piping Deliverables up to the issue for construction.

-Ensure adequate manpower resources and their technical competences are available for his assigned area.

-Reviewing, issuing and follow-up the comments, within his term of reference, on all drawings/documents related to other discipline which may be affected by piping activities.

2 . Project : 700 MW Jamex (Jebel Ali M Station Extn) DEWA Plant

Type : Greenfield / Brownfield (Power Plant)

Company : SIEMENS AG (Power Generation)

Position : Piping Engineer

Location : Jebel M Station Extn,Exit 25 Sheikh Zayed Rd. DUBAI U.A.E

Inclusive Dates: October 1,2016 to August 6,2018

Area Responsibilities:

Unit 71UMB/72UMB HRSG, GTG Piping Unit 70UMA STG Piping, Process Piping (BOP) and Fuel Gas Buffer and Reducing/Compressor Station Vendor Piping (Internal / Interconnecting)

-Supervision of fabrication and installation of piping items as per drawings and clients specifications

-Responsible for planned progress schedule without compromising quality and safety

-Carry out daily reporting and monitoring at site progress in order to achieve and planned schedule

-Ensure that all field construction is executed in an integrated way in accordance with the project specifications, schedules, cost estimates, procedures, quality requirements and safety standards.

-Assure the effective and efficient management of the construction change control process both for the Companies and the Sub- contractor construction activities, such that changes are correctly documented and approved prior to the work being implanted.

-Oversee piping construction and testing activities are fully aligned with pre commissioning and commissioning requirements and Sub- contractors site supervision have a full understanding and are aligned to deliver these requirements.

-Field erection and installation of Critical Piping Steam, Vendor and internal/external Piping of (HRSG, GTG, and STG)

-Check corresponding P&ID and ISO according to its system and its design

Plan, detail and review technical documentation relating to piping and mechanical systems' construction and installation.

-Vendor Material Inspection Prior to its system and Drawing

-In charge in Floating of Main Steam connection to Turbine nozzle for load and alignment

-ensure their work packages in their site areas are carried out on schedule and in accordance with Project Specification

-Monitor progress of the shop fabrication activities and highlight any concerns raised.

-Review drawing, MTO and requisitions, highlight any shortages to Procurement/Project Team.

-Ensure materials, fabrications and installations are in accordance with the specifications and drawings

-Resolve technical issue at site.

-Support for fabrication - installation - issuing material - monitor – follow up and prioritizing Line work and punch list clearance and Hydrotest

-High standard of safe working practice, quality and productivity as well as compliance with the code of business conducts.

-Report all deviations between engineering documents and construction execution to Construction Manager Erection, prepare non-conformance reports.

-Improving work procedures in case of necessity and prepare supporting documents (e.g. sketches) for the construction staff. Analyzing the actual work progress data and ensure, that the target data are achieved

-Ensure, that the applicable standards are observed and elaborate countermeasures in case of deviations

3. Project : 1600 MW Independent Water and Power Plant

Combine Cycle (STG,HRSG, GTG, Open Cycle)

Type : Greenfield / Brownfield (Power Plant)

Company : Hyundai Engineering and Construction

Position : Piping Engineer

Location : Al-MIRFA Western Region,ABU DHABI U.A.E

Inclusive Dates: August 04, 2015 to Sept. 29,2016

Area Responsibilities:

Unit 1/ 2/3 HRSG, GTG Piping,Unit 1 / Unit 2 STG Piping, Unit 1/2/3/4 OCGT Piping, Process Piping (BOP)

-Field erection and installation of Critical Piping Steam, Vendor and internal/External Piping of (HRSG, GTG, OCTG and STG)

-Check corresponding P&ID and ISO according to its system and its design.

-Checking of Design and detailing in accordance with acknowledged industry Codes and Standards as per Client Specifications .

-Scopes of Work Plan, detail and review technical documentation relating to piping and mechanical systems' construction and installation.

- Vendor Material Inspection Prior to its system and Drawing

- Monitor contractor piping activities and maintain alignment with the client's requirements and specifications

- Monitor site construction activities to ensure that discipline related activities, including material and equipment receipt, storage and installations are accomplished in full compliance with the HSE procedures, applicable specifications and standards.

- Maintain daily activity report on HSE, progress, material status, quality issues and resources afforded to the work.

- Maintain documentation necessary to verify that the work performed meets contractual requirements.

- Participate in Safety walk downs and audits.

- Carry out surveillance and inspection including approval of testing as deemed necessary.

- Verify installation for compliance and invoice validation support.

- Assist the Sub-Contractor with coordination of the work.

- Participate and support in mechanical completion, pre-commissioning and turnover of plant facilities.

- Support plant commissioning when required and approved

4. Project : 2 X 500 MW Mong Duong1 Plant

Type : GREENFIELD (Coal Fired Power Plant)

Company : Hyundai Engineering and Construction

Position : Piping Engineer

Location : Quang-Ninh Province, VIETNAM

Inclusive Dates: October 13, 2013 to June 24,2015

Area Responsibilities:

Unit 1 and Unit 2 Boiler and STG Piping

-Supervise erection and installation of Critical Piping (Main Steam, Hot Reheat, Cold Reheat, Steam Bypass and Feed water.)

-PID Mark-up for test prior to line list and system availability

-Plan and Schedule of modification line according to the Area Availability

-Supervised on the De-Blocking of Hanger/Spring Support and check the Load data.

-In charge on the Adjustment of load on the spring support as per LISEGA Recommendation.

-Making Schedule of activity on Steam Turbine Nozzle Connection (Horn Drop Test)

5. Project : SAUDI ARAMCO Waste Water Treatment and Lift Station System (BI-10-00787)

Type : BROWNFIELD (Oil and GAS) (SHUTDOWN)

Company : STX Construction

Position : Piping Engineer

Location : Saudi Aramco Riyadh Oil Refinery, SAUDI ARABIA

Inclusive Dates: Nov. 13, 2012 to Sept. 03,2013

Area Responsibilities:

API Separator, Lift Station Oily Water, Stormwater, Sour water and Hydrocarbon Unit, Gas Oil Separator Area

-Coordinate pipe work and mechanical engineering support to the execution of multidiscipline projects in line with defined budget and schedule.

-Provide piping engineering assistance during occasional periods of site working as per Saudi Aramco Standard.

-Execute proper installation of piping line in accordance of approved construction drawing or isometric drawing and record any discrepancy on punch list form.

-Conduct field inspection on a regular basis such as visual checking dimensional checking and witnessing all piping works,etc..to ensure that they comply with the project specification.

-Ensure assigned scope of work is carried out without any significant HSE incidents

-Responsible for construction piping activities through the contractors supervision in respect of HSE, method, working practices, quality and timely execution of the works

-Initiate and manage the piping project element of the continuous improvement processes

-Maintain records of site activities and check Contractor records for accuracy

-Carry out inspection, surveillance witnessing of contractor activities, ensuring records are maintained, including as-built data

-Detailing the work progress, number of contractor personnel and equipment available on site and other related items identified in the scope of work

-To be fully familiar with the contractors methods of construction, schedule and procedure

-Ensure that construction hazards and risks are fully considered by designers and contractors and that appropriate mitigation actions are implemented and appropriate action taken

-Supervise the contractor and sub-contractor personnel to ensure contractor performs all work to agreed standards for safety, health and environment and to attaining high levels of HSE performance

6. Project : 3 x 230 MW MARAFIQ YANBU 2

(Power and Water Desalination)

Type : GREENFIELD (Power Plant)

Company : Hanwha Engineering and Construction

Position : Piping Engineer

Location : Yanbu City, Kingdom of SAUDI ARABIA

Inclusive Dates: June 17, 2012 to October 10,2012

Area Responsibilities:

STG Piping, Pipe Rack Piping and Desalination Area

-Supervise erection and installation of Critical Piping (Main Steam, Hot Reheat, Cold Reheat, Steam Bypass and Feed water.)

7. Project : RA1Z Sonatrach Refinery Rehabilitation &

Adaptation Project

Type : BROWNFIELD (Oil and Gas)

Company : Hanwha Engineering and Construction

Position : Field Piping Engineer/Piping Lead (Tie-in)

Location : Arzew, Algeria, NORTH AFRICA

Inclusive Dates: June 25, 2010 to April 26,2012

Area Responsibilities:

Isomerate, LN HDT unit, Waste Water Treatment, Gas Plant, Topping, Reforming Area, MEK and Hot Oil,Cruder Tower modification,Charge and Superheater,All Tie-in Process and Utilities (Rehabilitation and Revamping)

-Over All In-charge in Dismantling and Tie-in Revamping(Shutdown) Area in Gas Plant, Reforming and Topping Area for Rehabilitation and Adaptation Project.

-Review of the method statement for execution to ensure compliance with the zero impact target for execution.

-Supervision of sub-contractor work during the execution of the tie -ins.(Dismantling of Pipe as per (Tie-In)(Process and Utilities Area)

-Responsible for Sub Contractor Execution and quality of tie-ins Works and Dismantling

-Coordinates problem rectification between Engineering office,Sub-contractor office.

-Ensures that tie- in installations is in the conformance with project specifications.

-Execute proper installation of piping line in accordance of approved construction drawing or isometric drawing.

-Conduct field inspection on a regular basis such as visual checking dimensional checking and witnessing all piping works,etc..to ensure that they comply with the project specification.

-Oversee piping construction and testing activities are fully aligned with pre commissioning and commissioning requirements and Sub- contractors site supervision and have a full understanding and are aligned to deliver these requirements.

8. Project : AAC Ethyleneamines (ZAMIL/HUNTSMAN)

Type : GREENFIELD (Petrochemical)

Company : Hanwha Engineering and Construction

Position : Piping Engineer

Location : Jubail Industrial City, SAUDI ARABIA

Inclusive Dates Dec 27, 2008 to Dec 27,2009

Area Responsibilities:

Process, Evaporator and Utility Area

-Oversee on site piping construction and coordinate with PMT including sub-contractors and vendors as necessary to meet schedule requirements.

-Review Sub- contractors installation and erection procedures and approve as required.

-Ensure that all field construction is executed in an integrated way in accordance with the project specifications, schedules, cost estimates, procedures, quality requirements and safety standards.

-Assure the effective and efficient management of the construction change control process both for the Companies and the Sub- contractor construction activities, such that changes are correctly documented and approved prior to the work being implanted.

-Oversee piping construction and testing activities are fully aligned with pre commissioning and commissioning requirements and Sub- contractors site supervision have a full understanding and are aligned to deliver these requirements.

-Ensure that all Companies systems of Quality Assurance are adhered to and assist the project Quality Assurance function in the completion of site system test sheets and the test dossier.

9. Project : PDH/PP Sahara basell

Type : GREENFIELD (Petrochemical)

Company : DAELIM Co.Ltd.

Position : CIMS Engineer/Piping Engineer

Location : Jubail industrial City,SAUDI ARABIA

Inclusive Dates : July 18,2007 to September 17,2008

10. Project : FORMOSA PETROCHEMICALS CORP.

OLEFINS N0.3 PROJECT

Type : GREENFIELD (Petrochemical)

Company : CTCI ENGINEERING CORP.

Position : Mech.PIPING INSPECTOR

Location : Mailiao, Yunlin, TAIWAN Republic of CHINA

Inclusive Dates : July 28, 2005 – April 01, 2007

11. Project : PETROKEMYA N0.3 BUTENE-1 PLANT

Type : GREENFIELD (Oil ang Gas)

Company : M.S. AL-SUWAIDI INDUSTRIAL SERVICES

Position : Mech. PIPING Inspector

Location : Jubail Industrial City, SAUDI ARABIA

Inclusive Dates : March 05, 2004 – March 05, 2005

Summaries of Duties and Responsibilities:

Over All In-charge in Dismantling and Tie-in for Revamping Area in Gas Plant, Reforming and Topping Area for Rehabilitation and Adaptation Project.

In charge of piping modification, erection and layout of Pipe Rack unit for Isomerate, LN HDT unit, Flare Stack,Waste Water Treatment, Gas Plant, Topping, Reforming Area and Furfural, Mek, Hotoil Zone

-Check and review AFC Isometric drawing for U/G RTRP and A/G Piping field installation.

-Supervise field installation of under ground and above ground piping activities.

-Check and control piping field installation to ensure that the quality and workmanship conform to drawing specification.

-Engage in monitoring of sub-contractor supervisors activities as per schedule plan.

-Review client specification and drawing prior commencement to any inspection activities.

-Conduct visual inspection prior marking, cutting, fit-up and welding.

-Conduct daily monitoring on in process welding to ensure that correct parameters are being followed as per ( WPS ).

-Engage in inspection of all pipe materials, code and heat number prior to fabrication and installation.

-Engage in material inspection & dimensional checking as per Isometric drawing and bill of materials prior to welding.

-Engage in alignment & squareness checking prior to welding.

-See to it that welding filler, electrodes and other parameters are in accordance with the company specification.

-Review isometric drawing, piping lay-out and P&ID drawing prior to erection.

-Work on upper rack for the erection and installation of different kinds and sizes of pipes such as stainless, carbon, LTCS, Monel, Inconel, Alloy, Duplex & Nace (MR0103) pipe and etc.

-Work on fabrication and fabricate different kind and sizes of spools based on isometric drawing for underground and above grounding piping.

-Erection and installation of coated pipes for underground piping.

-Installation of different kinds and sizes of valves as required. Bolting and hot bolting job.

-Fabrication, installation of RTR, FRP & GRP pipes on underground piping systems.

-Performing / witnessing of all inspection and testing as per approved Inspection test plan / procedures.

-Inspection of all incoming materials based on the material test certificates..

-Drawing Review and Documentation

-P&ID Drawings Mark-up for preparation of Test Package

-Vendor piping Drawings

-Material Specifications Checking

-Material Preparation, Bill of Materials

-Knowledge Weld mapping or Shop Drawing

-Wide Knowledge of 3D model operation (smart plant review)

-Wide Knowledge of CMS,CIMS, Naviswork 3D operation

-Material Expedite, Inspection & equipment Preparation

-Drawing Modification for Field Adjustment

-Giving proper work order & Instructions to Sub Contractor

-Pipes & spool Internal cleaning inspection

-Valves flow direction checking

-Orifice flange Internal & Orientation Inspection

Training and Certification

Eurolink Safety

Confined Space Entry

Location : Dubai, United Arab Emirates

Certificate # 131704

Validity : October 22 2018

Saudi Aramco Riyadh Refinery

Permit To Work Certificate

Location : Dharan Saudi Aramco

Personal Reference

Mr.Markus Eul

Piping Manager (Germany)

Siemens AG (Gas-Power Division)

Mobile : +49-170*******

Mr. Roberto Panteras

Piping Superintendent

Enter Engineering (Uzbekistan)

Mobile:+998-*********

I hereby certify that all the above information is true and correct to the best of my knowledge and belief.

Chester Velasco Madayag



Contact this candidate