Post Job Free

Resume

Sign in

Project Engineering

Location:
Houston, TX
Posted:
December 23, 2020

Contact this candidate

Resume:

Steven E. Clayton - Resume

Name: Steven E. Clayton

*** ******** ******

West Columbia, TX 77486

Home# 979-***-****

Cell# 979-***-****

adiw2h@r.postjobfree.com

Qualifications: A.A., Business; Brazosport College – Lake Jackson, TX Coursework, B.B.A. in Management, University of Houston – Houston, TX Summary of Key Experience and Responsibilities

Over twenty (20) years of experience in Project Controls including Cost Controls, Planning, Cost Risk Analysis and Contract Administration. Fully conversant with industry software including Primavera (P3), (P6) and Microsoft Projects, Milestone Pro, SAP and Ecosys.

2007 – Present Turner & Townsend, Inc.

Shell (Mar 2, 2020 to Jul 17, 2020)

Shell Subsea Brownfield Projects

Project Planner, Senior Cost Analyst

Responsibilities include schedule and cost analysis and forecasting of client’s Brownfield Subsea Project schedules and cost reports utilizing Primavera, SAP and Ecosys.

Freeport LNG (Jan 11, 2016 to Feb 28, 2020)

Freeport LNG Expansion Project – Pre-Treatment Facility Project Planner, Senior Cost Analyst

Responsibilities include schedule, physical progress measurement, payment milestone reconciliation, cost analysis and forecasting of contractors’ schedules and reports utilizing Primavera, SAP and Ecosys. Also responsible for Owners’ Scope Projects such as Pipeline, Storage Trucking Facility (STF), Underground Storage Modifications (UGS) and Stratton Ridge Metering Station (SRMS). Chevron (Feb 23, 2009 to Jan 8, 2016)

Congo River Crossing (CRX) Pipeline Project – Houston, TX Project Controls Interface Coordinator (In-House at EDG – Houston, TX) Responsibilities include contractor cost, estimate, physical progress measurement, schedule analysis, change management approvals, Contract Administration, contractor PAFs and over-time request approvals. Coordination of project procedures, PEP and Staffing Plan. Also, received P6 Training. Resume Steven E. Clayton 2

BP (Feb 5, 2007 to Feb 20, 2009)

Texas City Automation & Control Project – Texas City, TX Cost Consultant II

Responsibilities include project cost forecasting (TIC), invoice reconciliation, change management approvals, mobilization, over-time request approvals and estimate and schedule analysis. Supported cost risk analysis on the project. 2006 – 2007 Amec, Inc.

(Aug 28, 2006 to Feb 2, 2007)

Enbridge Southern Access Project – Canada and US

Planner / Scheduler II

Responsibilities included scheduling, physical progress measurement, and minor cost forecasting for engineering and construction projects (downstream pipeline).

2006 Turner & Townsend, Inc.

(Mar 6, 2006 to Aug 25, 2006)

ConocoPhillips

Wood River Refinery Project – Houston, TX

Cost Consultant II

Responsibilities included cost forecasting, invoice reconciliation, and mobilization, over-time, and travel request approvals utilizing SAP. 2002 – 2006 Paragon Engineering Services, Inc.

(Sept 2, 2002 to Mar 3, 2006)

Various Projects – Various Locations

Planner / Scheduler II

KOC Booster Station (Downstream Compressor Station/Pipeline) (Kuwait) WAFRA Central Gas Utilization Project (Downstream Heavy Oil & Gas Production Facility) (Kuwait)

JO PNZ Large-Scale Steam Flood Pilot Project (Downstream Heavy Oil & Gas Production Facility) (Kuwait)

ChevronTexaco/Kuwait Oil (JO) – MGC EOCENE Upgrade Project, Heavy Oil Development Project (Downstream Heavy Oil & Gas Production Facility)

(Kuwait)

Pemex – FEED for Ayin-A and Ayin-B Drilling Platforms (Upstream)

(Villahermosa, Tabasco-Mexico)

ChevronTexaco Overseas Petroleum – CVX Area “A” Gas Management Project

(Upstream Production Platform) (Angola, Africa)

BP – Destin Onshore Pipeline Compressor Station (Upstream Compressor Resume Steven E. Clayton 3

Platform) (Pascagoula, MS)

BP – Mardi Gras Transportation System (Upstream Deep Water Production Platform) (Gulf of Mexico)

Anadarko – Tarantula (Upstream Shallow Water Production Platform)(Gulf of Mexico)

Responsibilities included scheduling, physical progress measurement, and cost forecasting for engineering and construction projects (downstream, upstream, compressor station and pipeline).

2000 – 2001 Petroleum Fuel & Terminal/APEX Oil

(Jan 3, 2000 to Feb 23, 2001)

Various Projects – Freeport, TX

Junior Planner / Scheduler

Responsibilities included scheduling petroleum transports, industrial maintenance, and physical progress measurement.

1998 – 1999 AMK Environmental Inc

(Jun 1, 1998 to Dec 31, 1999)

Various Projects – Freeport, TX

Junior Planner / Scheduler

Responsibilities included scheduling wastewater recovery projects and industrial maintenance.



Contact this candidate