GLENN C. MIJARES
OBJECTIVE:
To obtain a challenging career opportunity for my profession in construction industry in the field of installation/erection and inspection. Also to enhance my skills and knowledge geared toward professional career growth and to blend with co-workers in order to achieve common goal in a highly competitive working environment.
SUMMARY OF QUALIFICATION
Gain over 25 years total excellent experience and 18 years in the Middle East for various field of installation/erection and inspection for Oil and Gas, Petrochemical Plant, Power Plant, Desalination Plant and High Rise Building Project for mixed used residential, commercial & retail.
Good analytical and communication skills (English).
Excellent skills in identifying key strategic issues, opportunities and risks, in establishing priorities in planning, coordinating, monitoring work and making timely decisions under stressful conditions.
Excellent skills in establishing and maintaining effective and efficient working relationship.
WORK EXPERIENCE (ABROAD)
Company : CONSPEL QATAR WLL
P.O. BOX 23100, DOHA, QATAR
Project : MSHEIREB DOWNTOWN DOHA PROJECT PHASE III
(MSHEIREB PROPERTIES) MP
COMMERCIAL, OFFICES. RESIDENTIAL. HOTEL BUILDINGS & RETAILS
Location : DOWNTOWN DOHA
Designation : QA/QC ENGINEEER (MEP)
Duration : JANUARY 2014 UP TO PRESENT
Consultant : CEG INTERNATIONAL
DUTIES AND RESPONSIBILITIES
Preparation of project quality inspection plan such as method statement/inspection test plan, procedure for scope of work related and implementation as per design and specification approved by the client and in accordance to Saudi Aramco Standards, NEC, BS, IEC and other applicable standards.
Responsible for the implementation as per design and specification of electrical works and installation (especially inspection). Documentation and tendering of RFI request (ready for inspection) and pre inspection prior to RFI schedule.
Coordinate quality procedure to construction department, project management and client inspector. To include the log book answers and corrective action for client inspection and comment.
Testing and Commissioning for Electrical installation.
Conduct inspection for the all electrical installation such as Power Transformer, Bus Duct installation, Rectifier, Substation works such as MV/LV Switchgears installation and Terminations, DCS, AC/DC Panels for UPS system, Battery System and other electrical installations.
Drawing review and check field installation in conformance with the specification and applicable standards. Preparation of non conformity reports in all deviation and violations of approved standards met during the inspection.
Ensure all works done as per approved drawing, specification and other applicable standards. Implementing quality control requirements on construction sites mainly in the installation of electrical works. Attending for weekly QA/QC meeting and to discuss quality matters that arise during the installation stage.
Maintain documents in respect of quality records required and quality control checklist.
Witness for the testing such as Hi-pot, Insulation resistance test, Transformer oil filtration and Oil BDV (Break Down Voltage test or Die Electric Strength test) Polarity Index test, Ratio test and others. MV/LV Switchgear, Bus Duct/Bus Bar test also Contact Resistance test.
Company : SAUDI BINLADIN GROUP PBAD (PUBLIC BUILDINGS AND AIRPORT DIVISION)
P.O BOX 26106, RIYADH 11486, KINGDOM OF SAUDI ARABIA
Project : KING ABDULLAH FINANCIAL DISTRICT EPC PROJECT (RESIDENTIAL,
COMMERCIAL, OFFICES AND HOTEL BUILDINGS ALSO SUBSTATION)
Location : RIYADH (MARKOS MALE EXIT 4)
Designation : ELECTRICAL ENGINEER (MEP)
Duration : JUNE 2010 UP TO APRIL 2013
Consultant : DAR AL RIYADH
Company : STRABAG QATAR W.L.L.
C-RING ROAD, 2ND FLOOR, AL EMADI BLDG. P.O. BOX 22980, DOHA STATE OF QATAR
Project : PEARL GTL (GAS TO LIQUID) EPC PROJECT (PLANT OFFICE BUILDINGS)
Location : SHELL, Ras Laffan Industrial City, Qatar
Designation : SITE ELECTRICAL ENGINEER (MEP)
Duration : OCTOBER 2007 UP TO NOVEMBER 2009
Consultant : KBR / JGC (KELLOGS BROWN AND ROOT / JAPAN GAS CORPORATION)
Company : ARABIAN BEMCO CONTRACTING COMPANY LTD.
P.O. BOX 86984, RIYADH 11632 KINDOM OF SAUDI ARABIA
Project : RIYADH POWER PLANT NO. 9 EXTENTION AND REINFORCEMENT PROJECT
(BLOCK C, D & F / 1920 MW) EPC PROJECT
Location : SAUDI ELECTRICITY COMPANY, RIYADH KINGDOM OF SAUDI ARABIA
Designation : SITE ELECTRICAL ENGINEER
Duration : JUNE 2006 UP TO SEPTEMBER 2007
Consultant : SAUDI CONSULT
DUTIES AND RESPONSIBILITIES
Responsible for planning, controlling & monitoring of the actual execution of all electrical related works. To ensure that the project is done in accordance with all the approved construction drawings, contractors documents, specification and all applicable standard.
Responsible for the implementation as per design and specification of electrical works and installation such as Inter Bus Transformer/Super Grid transformer, Generator Step Up Transformer (GSU), Isolated Phase Bus Duct (IPB), Auxiliary Transformer, Non Segregated Bus Duct (NSBD), Station Current Limiting Reactor (SCLR) and other electrical equipment.
Substation works such as MV/LV Switchgears, Distributed Control System (DCS), AC/DC Panels, Battery System, UPS System also Terminations, Lighting System installation and Small Power.
Cable Tray installation, Conduiting to include Duct Banks and others, Cable Pulling and field termination such as Motors and Panels also Earthing installation and Lightning Protection for the plant installation and High Rise buildings.
Installation of Extra Low Voltage (ELV) such as Fire Alarm System, Paging System or Public Address, Access Control, CCTV, LAN, Structured cabling, Badge Reader, BMS and etc.
Assisting for the Vendor representative during the installation and testing of major equipment.
To report directly to the Construction Manager with regards to the electrical installation and activities in day to day basis and to discuss problems encounter in the site and action to be taken.
Coordination to the other trade such as Civil, Mechanical and Instrumentation that can affect the electrical works in order to avoid problems and corrective actions taken during the installation stage to both department.
Materials Take off or Bill of Quantities required as per drawing against the actual installation, Material Requisition and coordination to the Warehouse for the materials needed for mobilization at site also Manpower allocation for a certain job. And preparation of material submittal for approval as per the design and specification of the project.
Coordination to the Engineering Department with regards to the revision and changes as per site condition for as-built.
Attending for the weekly coordination meeting related to construction activities, schedules and preparation for the status of project and other important matters to consider.
Company : DANWAY ELECTRICAL AND MECHANICAL ENGINEERING
P.O. BOX 50048, DUBAI, UNITED ARAB EMIRATES
Project : AWEER GAS TURBINE POWER STATION “H“ PHASE II
DUBAI ELECTRICITY AND WATER AUTHORITY (DEWA) 750 MW
Location : AL AWEER, DUBAI U.A.E.
Designation : QA/QC ENGINEEER
Duration : NOVENBER 2005 UP TO APRIL 2006
Consultant : MOTT MC DONALD
Company : DANWAY ELECTRICAL AND MECHANICAL ENGINEERING
P.O. BOX 50048, DUBAI, UNITED ARAB EMIRATES
Project : JEBEL ALI POWER AND DESALINATION PROJECT STATION “L“ PHASE I
DUBAI ELECTRICITY AND WATER AUTHORITY (DEWA)
Location : JEBEL ALI, DUBAI U.A.E.
Designation : QA/QC ENGINEEER
Duration : DECEMBER 2004 UP TO NOVEMBER 2005
Consultant : LAHMYER INTERNATIONAL GMBH
Company : SAMSUNG SAUDI ARABIA LTD.
P.O. BOX 35816, JUBAIL INDUSTRIAL CITY 31961 KINGDOM OF SAUDI ARABIA
Project : NATIONAL PETROCHEMICAL INDUSTRILIZATION COMPANY (EPC PROJECT)
Location : JUBAIL INDUSTRIAL CITY, KINDOM OF SAUDI ARABIA
Designation : QA/QC ENGINEEER
Duration : SEPTEMBER 2002 UP TO SEPTEMBER 2003
Consultant : FLOUR DANIEL
Company : METAL SERVICE COMPANY
P.O. BOX 12290, DAMMAM 31473, KINGDOM OF SAUDI ARABIA
Project : SAUDI STRATEGIC STORAGE PROGRAM (SSSP)
UNDER ABV ROCK GROUP, 240 KM. PIPELINE PROJECT
Location : JIZAN BULK PLANT TO ABHA RECEIVING STATION
Designation : ELCTRICAL INSPECTOR
Duration : DECEMBER 2000 UP TO NOVEMBER 2001
Consultant : AL HOTY UNDER ARAMCO
Company : METAL SERVICE COMPANY
P.O. BOX 12290, DAMMAM 31473, KINGDOM OF SAUDI ARABIA
Project : PETROKEMYA OLEFINS III, PIPELINE PROJECT 70 KM.
Location : JUAYMAH GAS PLANT RASTANURA TO PETROKEMYA JUBAIL
Designation : ELCTRICAL INSPECTOR
Duration : MAY 1999 UP TO DECEMBER 2000
Consultant : AL HOTY UNDER ARAMCO
SAME AS ABOVE FOR QA/QC ENGINEER EXPERIENCE
WORK EXPERIENCE (LOCAL IN THE PHILIPPINES)
Company : R-II BULDERS INC.
136 MALAKAS STREET, DILIMAN, QUEZON CITY, PHILIPPINES
Project : SMOKEY MOUNTAIN DELEOPMENT AND RECLAIMATION PROJECT
Location : MANILA, PHILIPPINES
Designation : FIELD ELECTRICAL ENGINEER
Duration : JUNE 1997 UP TOAPRIL 1999
Company : DAVID M. CONSUNJI INC.
(ENGINEER-CONTRACTORS)
TAGUIG BATHCING PLANT, TAGUIG, METRO MANILA, PHILIPPINES
Permanent : BATCHING PLANT
Location : TAGUIG METRO MANILA, PHILIPPINES
Designation : PRODUCTION SHIFT IN CHARGE
Duration : SEPTEMBER 1996 UP TO JUNE 1997
Company : NEW WALL BUILDERS INC.
(CONSTRUCTION AND MANAGEMENT)
384 ANDA ST., COR, SAN JUAN DE LETRAN INTRAMUROS MANILA, PHILIPPINES
Project : COMMERCIAL AND OFFICE BUILDINGS
Location : MANILA, PHILIPPINES
Designation : PROJECT INSPECTOR
Duration : JUNE 1994 UP TO AUGUST 1996
TYPE OF MAJOR PROJECT PARTICIPATED
OIL AND GAS PROJECT
PETROCHEMICAL PROJECT
DESALINATION PLANT PROJECT
POWER PLANT PROJECT
HIGH RISE BUILDING PROJECT (RESIDENTIAL, COMMERCIAL, RETAIL, OFFICES AND HOTEL BUILDINGS)
Power Transformer such as 500MVA (Inter Bus Transformer/Super Grid Transformer), 360MVA, 240MVA & 180MVA (Generator Step Up Transformer), 100MVA, 50MVA, 10MVA and Small Transformers also Solar Arrays, Isolated Phase Bus Duct (IPB) and Non Segregated Bus Duct (NSB)
Underground Power Distribution Lines (132kV, 34.5kV, 13.8kV, 6.6kV, 4.16kV) Low Voltage and Control
Indoor Substation (34.5kV, 13.8kV, 11kV, 6.6kV, 4.16kV) Low Voltage and Control
Medium Voltage Motors for Shipping Pump, Booster Pump and Desalination Pumps
Telecommunication (Fiber Optic Cable)
Cross Country Pipeline and Cathodic Protection
Industrial, Commercial and Residential Facilities
EDUCATIONAL ATTAINMENT
COLLEGE
1986 – 1993 Technological Institute of the Philippines
Bachelor of Science in Electrical Engineering 20th Avenue Cubao, Quezon City
(BSEE)
SECONDARY Aklan National College of Fisheries
1980 – 1986 New Washington, Aklan
ELEMENTARY New Washington Elementary School
1976 – 1982 New Washington, Aklan
GOVERNMENT EXAMINATION TAKEN
Electrical Engineering Licensure (Passed) – Registered Electrical Engineer (ID # 0007863)
Duly Recognized By: Philippine Regulation Commission (PRC)
GROUP AFFILIATION
Institute of Integrated Electrical Engineers of the Philippines (IIEE)
Lifetime Member (ID # 10139)
Saudi Council of Engineer’s (SCE)
(Member)
SHORT TERM COURSES/TRAININGS
Train The Trainer – July 01, 2009
Pear Village Training Center
Ras Laffan Qatar
(J/K, SHELL and QATAR PETROLUEM)
Introduction to HSSE & Leadership – June 21, 2009
Pear Village Training Center
Ras Laffan Qatar
(J/K, SHELL and QATAR PETROLUEM)
Quality/ FSI Awareness and Challenges – November 16, 2008
Strabag Qatar Training Center
Ras Laffan Qatar
Introduction to FSI, TSTI and FTW – October 25, 2008
Pear Village Training Center
Ras Laffan Qatar
(J/K, SHELL and QATAR PETROLUEM)
Calibration for Process Instrumentation - August 2002
MERALCO FOUNDATION INC.
MFI Building, Meralco Center
Ortigas Avenue, Pasig City 1600
Electro Pneumatics Automation and Control - August 1997
(DUALTECH TRAINING CENTER)
A project of Dualtech Training Center Foundation Incorporated and Hanns Seidel Foundation
of Germany
Industrial Motor Control Wiring and Maintenance - June 1997
(DUALTECH TRAINING CENTER)
A project of Dualtech Training Center Foundation Incorporated and Hanns Seidel Foundation
of Germany
ACHIEVEMENT AND AWARDS
Recipient for the Achiever of “High Level of Quality Excellency Award “
Given by JGC/KBR, Shell and Qatar Petroleum for the Pearl GTL Project
Recipient of Quality Award “Best Site Engineer “ (Electrical Department) for Pearl GTL Project Given by Strabag Qatar (November 12, 2009)
PERSONAL INFORMATION
PERMENENT ADDRESS : Tambac, New Washington, Aklan
DATE OF BIRTH : December 19, 1969
PLACE OF BIRTH New Washington, Aklan
NATIONALITY : Filipinos
CIVIL STAUS : Married
RELEGION : Roman Catholic
COMPUTER SKILLS
Windows Explorer, MS Word, MS Excel and Internet Explorer and E-mails (MS Outlook, Lotus Notes & Outlook Express)
# Block 10 Lot 1 Withholding Street, BIR Village, West Fairview, Quezon City, Philippines
Email: adiv1i@r.postjobfree.com
Tel. No.: +63-2-351-7085
Mobile No.: +63-998-***-****