Ryan Diaz
Quality Manager
Objective: Continue growing my Renewable Energy career by transitioning
from the quality supplier role into project management/project development with a company that I can grow my abilities.
4+ Quality management experience developing multi-million dollar new development wind projects throughout the United States. Overseeing in the construction process as well as the commissioning phase to get the product into an operational status to be handed over.
•
Proven ability to analyze and solve highly complicated issues on the go in a fast paced working environment.
•
Ability to interpret highly complex data, procedures, blue prints, one-line diagrams, electrical and hydraulic schematics.
•
Proven ability to organize daily operations and communicate effectively between multiple different parties.
•
Quality Coordinator- QA/QC Site Manager
Wood Group
Review and be familiar with the job specifications, drawings, submittals and the contract documents which will outline the quality requirements for site specific project.
•
Maintain a job file of all the contract documents for handover on COD.
•
Make daily inspections of the work in progress across disciplines and maintain very accurate records of these inspections.
•
Audited multiple different testing phases from civil, electrical and tower construction processes.
•
Verify corrective actions that have been taken when discrepancies have been identified. Must also submit a report on the methods and procedures that were used to correct identified problems.
•
Recommend revision to methods of operation, material handling, equipment layout, or other changes to increase production or improve standards.
•
• Review all inspection reports for compliance.
Prepare non-conformance reports and assist in developing corrective actions
•
• Assisted in resolving any discrepancies and ambiguities Assure all non-conformance and resolution activities are communicated in appropriate manner with all stakeholders.
•
• Review inspection test packages during the course of the projects. Outside Sales Representative
Sunbelt Rentals
Maintain sales KPI targets in my territory with multiple different types of key accounts.
•
Summary
Experience
2020-05 -
present
2019-09 -
2020-04
Personal Info
Address
3405 Canemont Drive
Midland, Texas 79707
Phone
adiua5@r.postjobfree.com
Date of birth
1990-09-22
https://www.linkedin.com/in/ryan-
diaz-b57031a3/
Skills
SAP
Strong understanding and working
knowledge of program
Office 365 (Excel, Word,
PowerPoint, Outlook)
Fluent working with all Office
programs
One-Line Diagram
Able to interpret and analyze
diagrams
Electrical & Hydraulic Schematic
Reading
Strong understanding
Apple Mac & Android Programs
Fluent working in all aspects of
smartphones
Willingness to Learn New Skills
8D/Root Cause Analysis
Advanced working knowledge
AutoCAD
Intermediate working knowledge
Data Analysis
Able to analyze and sort data
accordingly
Develop new leads to gain new clientele to expand the Sunbelt Rental portfolio.
•
Proven knowledge of general tooling used to develop and maintain various types of projects in the construction industry as well as warehousing.
•
Quality Site Manager
Siemens Gamesa Renewable Energy
Overseeing that the proper assembly, documentation and operation of million-dollar equipment be constructed and passed to energy service suppliers in the best quality functional condition.
•
Created non-conformity reports (NCR) when necessary through SAP for any defect seen in the construction or operation phase
•
Used SAP to check the bill of materials of multiple different components, create cost orders when necessary to charge the responsible party for a deviation found.
•
Perform an 8D investigation to identify the root cause of defects found to provide the most quality assured product/
•
Develop complex procedures and data trackers to track deviations found on site.
•
Manage quality inspectors at site, coordinate inspections & audits to ensure the product being provide is suitable to sustain the lifespan of a project
•
Manage the quality portion budget on site to ensure all cost be accounted for and be within the budget provided from project management.
•
Maintained and managed documentation pertaining to that project with information for all components on site to be handed over to client as well as services team.
•
Responsible for ensuring technical information such as documents, procedure, diagrams and blue prints with the BOP erecting the Siemens Gamesa turbine.
•
Internship
Westwood Professional Services
Used AutoCad to design multiple aspects of a project such as road infrastructure, foundation layout, project offices and transmission line routing.
•
Responsible for setting up final design work for clients and city officials for approval
•
Developed multiple spreadsheets for tracking of the construction staking phases and developing layouts of landowners on a given project.
•
Texas Tech University
- Financing (Using Excel), Wind Turbine Placement (Delorme XMap, ArcGIS), Modeling & Design
• Bachelors of Science Wind Energy
Leaned multiple different phases entailed in developing a wind project
•
2015-11 -
2019-08
2015-01 -
2015-03
Education
2011-08 -
2015-05
Quality Inspection/Documentation
Fluent working knowledge
GIS
Intermediate working knowledge
Relationship Building
Expert
Communication
Excellent
Contractual Document
Understanding
Strong understand