Durgeswara Rao Kapu
Mechanical Engineer
Mobile: 970*******
adir8j@r.postjobfree.com
adir8j@r.postjobfree.com
Profile
Overall profession experience of 18+ Years In Oil&gas, refinery, petrochemicals, air separation, water treatment Piping execution & tanks, chimney fabrication, erection
Fabrication of piping spools at shop floor. Fabrication of pipe supports, structural steel.
Planning resources to achieve targets and attending meeting with contractor and client/consultant
Erection of Piping, Static equipment, pipe supports, valves and special piping items as per drawing
Supervision of cross country p/l mainline welding, tie-in, crossings and laying
Supervision of tank plates Rolling, Laying of tank bottom plate, shell plate erection, supporting structure as per drawing
Developing standard work procedure and rigging plans. Prepare Check list, box up and loop file.witnessing of dpt, vacuum,chalk test, hydo/pneumatic test.
Supporting Commissioning team in commissioning activities
Key experience
● Refineries
● Oil terminal
● gas terminal
● Petrochemical
● Cross country P/L
● Power plant
● DM plant
Profession
Manager Mechanical
Previously Worked With Reliance corporate IT park ltd, Dahej site.
Nationality / Languages Indian / Telugu/Hindi, English.
Qualifications
Diploma in Mechanical
Engineering.
Govt polytechnic,Vizag
Soft Ware Experience
• AutoCAD-2D
• MS Office
Code & Standards
• ANSI B31.3
• ANSI B31.4
• API 650/IS 803
• Standard Engg practices
1)Worked in LPG terminal project with M/s KPTL as a Manager from Sep,2018-Jan,2020
a)Executing mechanical works as per schedule
b)Attending weekly and monthly meetings with client and PMC
c)Co-ordinating with engineering team, stores and other depts.
d)Certifying contractor bills
e)System marking & loop marking, MC, HT of loops.
f)Erection of equipments(vessels,exchangers,KOD,Heaters,Pumps etc) as per rigging plan and procedure.
2)Worked as a site incharge with Local contractor
a)Execution of piping and structure fabrication and erection
b)Execution of Storage tank fabrication and erection
3)Worked in M/s Reliance Corporate IT Park Ltd as a Senior Manager from December-2013 to June-2015
a)Preparing SOQ of Piping fabrication and erection .
b)Planning and ensuring resources required (manpower, machinery) as per requirement to achieve targets.
c)Co-ordinating with contractors and vendors, material department .
d)Erection of Condenser, Crystallizer, Compressor areas Piping & also Rack piping
e)Executing job as per code and standard practices .
f)Follow up with process team for loop clearance and HT.
g)Preparing as built drawings
h)Participating in Pre commissioning activities.
i)Clearing and checking contractors bills.
4)Worked in M/s Sri Krishna Engineering Works as a Site -incharge
From April,2011 to November,2013
a)Freezing the total scope of piping job of the project.
b)Scheduling and executing fabrication and erection as per isometrics/piping layout.
c)Installation of equipments as per layout drawing
d)Reviewing rigging plan and erection procedures of equipments
e)coordinating for materials as per fabrication requirement.
f)Planning and executing Fabrication of Piping at PFS (pipe fab shop)
g)Ensuring color coding of pipes and stenciling of line no, spool no, joint no
h)Coordinating for mechanical clearance, NDT, Hydro testing of lines.
5)Worked in Mott MacDonald Pvt Ltd. As a Senior Engineer
From Feb,2010 to Mar, 2011
Client: HPCL Visakhapatnam
Project : HPCL BOT, WOT . Visakhapatnam.
Duties : a. Supervising Piping fabrication and erection, Storage Tanks, Utilities
b. 8” cross country pipeline execution .
c. Approving QAP,WPS,PQR, Working Procedures.
d. Witnessing WQT, DPT, Hydro test, Chalk test
e. Coordinating with client, vendors and contractors.
f . Ensuring quality as per project ITP (QAP), Codes.
g. Ensuring safety measures at site.
Project : Aditya Birla Nuvo Ltd
Hi Tech Carbon Patalaganga Project
Duties : a. Supervising the execution of Piping system, Storage Tanks, Utilities.
b. Executed IBR steam line of pressure 65 kg/cm2 c. Supervision of Equipment installations like pumps, reactor, MBF,silo
Structural columns, pipe rack etc.
d. Coordinating with client, vendors and contractors.
e. Ensuring quality as per project ITP (QAP), Codes.
f. Ensuring safety measures at site.
g. Coordinating in commission activities.
6)Worked as a Sr. Engineer in Reliance Engineering Associates Ltd (REAL)
for KGD6 Terminal Project, from November 2006 to June 2009.
Project : KGD6 Gas terminal, Gadimoga – Kakianada.
Achievements: Successfully completed the project in record time.
Duties: a. Calculating the total scope of piping job of the project.
b. Finalizing the scope of fabrication and erection as per isometrics
c. Spooling of Isometric drawings and joint numbering.
d. coordinating for materials as per fabrication requirement.
e. Planning and executing Fabrication of Piping at PFS (pipe fab shop)
f. Ensuring color coding of pipes and stenciling of line no, spool no,
joint no.
g . Coordinating for mechanical clearance, NDT, Hydro testing of lines.
h. Execution of piping fabrication and erection.
7)Worked in DOSHI ION Ltd, as a Sr.Engineer from August 2004 to November 2006.
Project : HZL, Chittorgarh –Rajasthan.
Duties : a. Supervision of storage tanks fabrication and erection.
b. Supervision of installation of DM water plant capacity is 86 m3/hr.
c. Supervising erection of pumps, compressors, monorail etc.
d. Supervision of offsite piping fabrication and erection.
e. Supervision of structural fabrication, erection of pipe racks.
f. preparation of as-built drawings.
g. Familiar with all construction methods.
h. Involved in execution of RO Plant, ETP.
8)Worked as a Site Enginer from April 2000 to July 2004 in M/s. B.K.Enginering
Industries Pvt.Ltd.
9) Worked as a Mechanical Supervisor in Modern Erectors from Jan 1998 to
Mar 2000. SRU Plant In HPCL
10) Worked as a Mechanical Supervisor in Larsen & Turbo Ltd. (ECC) for
18” cross country P/L from May 1997 to Dec 1997.
Duties : a) Supervision of mainline welding
b) Checking weld visuals and attending repairs
c) Supervision of Tie-in joints of crossings
d) Supervision of Pipeline laying
Salary drawn : 9.6 Lakh PA
Salary Expected: Negotiable
Place: Visakhapatnam.
(KAPU DURGESWARA RAO)