PERSONAL INFORMATION
Syrian – Married - Birth : 1970
BSc in Civil Engineering
Post-graduate In Environment
Global Consulting Firm
PMO & PMC & Design
PE-Sce, PMP
Arabic and English
In : Muhamed sallah
Position Required
PD . Project Director
HM. Hydraulics Manager
CM .Construction Manager
PM’s . Senior Projects Manager
RE . Resident engineer
Site Manager
Chief designer
Senior utility designer
Principal civil Engineer
Principal Engineer- Wet Utilities
General Experience
Professional Engineer with 22 years of experience in Utility and infrastructure Projects, Design, Design review, Supervise, Implement, and Technical support with well-known organizations in Syrian, UAE and KSA along with a list of Clients such as Ministry of housing, Ministry of Environment Water and Agriculture, National Water Company, Eastern Province Municipality, Saudi Industrial Property Authority, Saudi Electricity Company, and Aleppo University .
10 years of project management experience for contracts valued between $2M and $115M; according to government procurement and competition system, include Attended various meetings in the office of the client;Regarding Bid Opening and Evaluation and project Briefings and Preparation of Feasibility reports, Comprehensive Design reports, and Bid Evaluation reports for various projects.
Over 15 years in Hydraulic and Hydrology projects, projects of floods and stormwater and reduce water levels in groundwater, and mix (stormwater and sewage water ) projects
Good Knowledge in Utility Requirements and Design Criteria of NWC, Modon, Ministry of housing and AASHTO ; balance and matching and harmony among all design parties.
Good Knowledge in network Analysis of Water and stormwaterand sewer, and calculation the Pipeline flows and preparing Hydraulic analysis for more than One Scenario and One Model by software
Review and approve all plan submitted by contractors like :
project management plan and schedule submitted by contractors.
safety plan ( HSE plan ), and support HSE engineer to ensure the safety of the site and men, and public and private facilities
quality management plan, and setting up a mechanism to control Quality by check lists in all construction stages ; and Strict applied in taking tests through effective monitoring, and support to implement the technical specifications in the project.
materials and suppliers, and setting up a mechanism to control procedures and standards for receiving materials before and after installation
risk management plan submitted by contractors,,and creating a risk register, and devising appropriate solutions according to for it .
shop drawings, As Built, GIS files,method of statement, Adjusted bill of quantity .
Coordination and communication with supervisors of construction work on-site, and directing subordinates to tasks required of them, and Managing the relationship between team members and containing internal team conflicts, Motivating and Optimizing and evaluate Technical and Behavioral and Contextual Competencies of the team
Managing and supervising the contractor's works according to the contracts with the owner, and ensuring that they are working at a high level of quality and skill, and evaluating their performance and reporting to the owner.
Coordination and communication between Stakeholder and PMO, and finding solutions to site problems, by Managing relationships and communications with clients, designer, contractors, supervision consultants, government management and regulatory authorities
Coordinate cross-projects activities, for deciding suitable strategies and objectives, and Submit proposals and recommendations, proportion to the financial of the project, then Apply change.
Planning of project management activities, adopting professional management systems, and compliance to PMO methodologies, and take periodic review procedures for project activities, and reformulate some technical plans to ensure the project completed within the approved time and budget,
Preparing lectures and training to Government engineers, in addition to Lecturer in saudi Engineers Authority in Jeddah, and former lecturer at the University of Aleppo and a teacher at the Technical Institute.
Strong track record in delivering projects in a fast-moving and challenging environment; and Close the projects - contractal and technical- by preparing protocol and snag list, and follow up .
Current Position
PROJECT NAME : JEDDAH STORM WATER PROGRAM
Employer Name : LOUIS BURGER – ( WSP )
Position : Haydrulics Manager (Stormwater Projects Manager )
From : march 2020 - Until now
Client : Jeddah Municipality
Estimated Cost : (661.000.000) SR
Location : Jeddah -KSA
Project Overview:
Projects Mnager of six stormwater projectsand Groundwater reduction projects in Jeddah city, those projects include multiple elements such as RCP pipes ( from 600 to 2500 mm ) and FRP pipes ( from 300 to 1000 mm), manholes, PRD’s, catch basin, shafts, lift stations, outlets on the sea, Box Culvert, Open Chanal, Groundwater drainage, as folwing :
1.30 Locations : SAJCO Contracting Value ( 32,500,000 SR ) 6 months
2.Al – waha : SAJCO Contracting Value ( 32,900,000 SR ) 10 months
3.GLOBE Around : AbualJadayel Contracting Value ( 74,800,000 SR ) 12 months
4.UP01 : SAJCO Contracting Value ( 41,900,000 SR ) 9 months
5.UP06 : SSEM Contracting Value ( 51,350,000 SR ) 9 months
6.Al-tyseer : SALCO Contracting Value ( 95,250,000 SR ) 15 months
7.Al-Harameen : CEPCO Contracting Value ( 93,000,000 SR ) 24 months
8.Al-manar : AbualJadayel Contracting Value ( 239,500,000 SR ) 18 months
My Responsibilities as Haydrulic Manager is:
My role include, Supervision, Inspection, Monitoring and Reporting, but are not limited to:
oActs as prime point of contact for the construction supervision aspects of the project, including approves and monitors contractor’s quality assurance and control, progress reporting, safety, financial recommendations, approved material submission and design modifications
oPlanning and coordination of activities for the effective management, control and reporting of the construction supervision of the projects
oPlan, schedule and oversee general contracting works, allocating work assignments and directing subordinates, ensuring works are delivered to a high standard of quality and to the satisfaction of Client, in a safe and efficient manner
oReview and approve work programs and progress schedules submitted by contractors
oMaintain continuous communication with the Client’s top management & PMO
oEvaluate, select, and adapt construction management and control techniques, procedures, and criteria to suit job tasks, and devises and implements solutions to problems encountered
oReview & approve work programs submitted by contractors
oLead site operations and implementation works, undertaking quality assurance checks and programming works, ensuring site safety and compliance with project management methodologies. Leads by example in driving safe practices on site
oPropose required rectification works in alignment with relevant quality and HSE standards and in compliance with Contract requirements
oIdentify potential problems and propose solutions
oMaintains, manages a project risk management plan and operational risk register containing all operational risks
oGuide the technical development of and participates in the delivery of training workshops for graduate engineers and other staff
oMaintain and enhance policies, procedures, technical standards and specifications
oEnsures that the project quality control procedures are used for supervision works and monitor it for improvement. Cooperate with audits required in accordance with the Contract requirements
oPlan and perform periodic audits of all elements of the process to ensure objectives are achieved
oManage projects and contractors in compliance with the contract conditions, requirements and specifications and ensure strict control of, and adherence to, project program, budget and contract administration process
oReview the contractor’s schedule for testing and commissioning of the installation, witness the tests performed by the Contractor and submit all test reports to the Client’s Representatives
oPerform other duties and responsibilities as required from time to time
oDelivery of completed projects according to a complex protocol, including Haidrolic tests, and CCTV and snag list, asbiult drawngs, gis drawngs, preliminary Delivery minutes, and all files and documents
PROJECT NAME : ENGINEERING CONSULTANCY CONTRACTS TO SUPERVISE WATER PROJECTS
Employer Name : MUSTANG AL-HEJAILAN - ( WOOD GROUP )
Position : Projects Manager
From : June 2018- march 2020
Client : Ministry of Environment Water and Agriculture (MEWA )
Estimated Cost : (342.500.000) SR
Location : Al-Qassim -KSA
Project Overview:
Water Projects Manager in Al-Qassim Region, Engineering Consultancy Contracts of two feeding lines and three STP projects, These Contracts are Supervise of Construction of four treatment plants in the towns of Al-asyah, Ayoun al-Jawah, Al-Nabhaniyah, and Shamsiyah . In addation to Two feeding lines To Al-Buraida City, as folwing :
Feeding line No 1 in Al-Qaseem, Length = 62057 m.l of carbon steel, ( 272’034’9 S.R )
Feeding line No 2 in Al-Qassem, Length = 76740 m.l / carbon steel, ( 315’524’213 S.R )
WWTP in towns of Al-asyah, Q= 15000 m3/day, ( 55’027’550 S.R )
Compact WWTP in Al-Baiytha, Q= 600 m3/day, LS tanks, ( 3’199’486 S.R )
WWTP in towns of Ayoun al-Jawah, Q= 18000 m3/day, ( 81’134’089 S.R )
My Responsibilities is:
oManagement the design review team of the Hydraulic Analysis, structural, mechanical, electrical and chemical design; for three Waste water treatment plant WWTP for Al-Asyah towns and Ayoun al-Jawah town and Al-Baiytha village
oManagement the design review team of the hydraulic Design of Feeding line No 2 in Al-Qassem
oStudying the obstacles and situations in which implementation of parts of the project is faltering and proposing hydraulic suitable modifications to the design if necessary
oDesign Review of the buildings and Landscape and masterplan, in addition to Design infrastructure networks, roads, potable water, sewage water, stormwater, irrigation, medium voltage cable
oReview the Schedule, cost, and quality of the project and ensure that the value of the value engineering is applied in the design of all projects
oPreparing and issuing change orders after the approval of the Directorate.
oProvide the owner with Suggestions about the best materials, equipment to achieve the lowest costs in operation and maintenance
oMonitoring and evaluating the performance of contractors, and their Targeted implementation ratios, the development of reform plans, and advising in relation to the Stumbling projects
oAdoption of managers and project engineers, and Recommend to adoption sub-contractors, and technical submissions, and shop drawings, and method of statement, and monthly invoices, and Bills of modified Quantities And apply the professional management systems (PMO) for MEWA
PROJECT NAME : TREATED SEWAGE EFFLUENT WATER TRANSMISSION LINE - RIYADH
Employer Name : CH2M ( JACOBS )
Position : PMC / Chief designer
From : December, 2017 - Until June 2018
Client : National Water Company - ( NWC )
Estimated Cost : (45.500.000) SR
Location : Riyadh -KSA
Project Overview:
Supply Treated Sewage Effluent (TSE) from HEET STP South Riyadh to Saudi Aramco’s Riyadh Refinery for non-potable purposes, the minimum flow supply of 11.000 m3 / day and a maximum flow demand of 20.000 m3 / day. For this purpose is necessary to build a new pipeline system, which will include TSE storage tanks, a TSE Pump Station and the corresponding connecting pipeline to the Saudi Aramco Refinery, the Main parts of the PST are:
Left Station (2P Flow 174 L\S and Head 32 m )
Pumping Station (2P Flow 260 L\S and Head 140 m )
three Steel tanks capacity of 30000 m3
three Surge tanks ( capacity of 35 m3, L=10 m, D=2.5m, internal pressuer =2.5 Mpa)
Pressure Ductile pipeline, Diameter of 500 mm, length of 13 km
Discharge Pipe Header, Bypass Line, Flowmeter Chamber, PST Block Valve, Compressed Air Unit, Water Quality Chamber, Transformer shelter, E&I-Container Chamber
My Responsibilities are:
Design Review the Reports of ( Geotechnical, Hydraulic Analysis, Steel tank calculation, Construction Calculations,Cathodic Protection Packoge )
Assistant Project Manager – and Supervising on Construction works and installation pipeline and HSE Officer, and ( QA-QC ) Engineer too
PROJECT NAME: REQUEST FOR PROPOSAL FOR STUDIES AND SUPERVISION OF THE WATER AND WASTEWATER PROJECTS IN JEDDAH AND MAKAH - TAIF CITIES BUSINESS UNITS ), ( PMO contract)
Employer Name : PARSONS
Position : Senior design Wastewater Engineer / PMO project
From : September 2016 TO December 2017
Client : National Water Company - ( NWC )
Estimated Cost : ( 80.000.000 ) SR
Location : Makah & Taif - KSA
My Responsibilities are:
a.Working in Environmental Studies Office of NWC in Taif City, for Design Review Taif projects, Designed by Saudi Engineering Union as the following :
23 Contracts Of Wastewater Network
25 Contracts Of Water Networks
2 Contracts Of Strategic Water Reservoirs capacity each one 300'000 m3
Contract Of Water Pump Station
Contract Of Radio Communication Network For Control And Monitoring System
b.Design Review the scope of work and documents submitted by Designer consultant (khatib and Alami) as : (Preliminary Design Report), (Conditions of Contract),(Technical Specifications),(BOQ’s),(Final Design Report)
c.Design Review the Calculations and Hydraulic Analysis and Drawings and Master Plan and layout of water and sewer systems and forced mains, and Checked the preliminary cost estimates to the all projects before bidding.
d.Resolve disputes between citizens and NWC, and develop satisfactory engineering solutions for both parties, this falls under the name of Stakeholder Management
e.Prepare Design Checklist to all stage of design review (documents, drawing, Sewage water, Water Reservoirs, Pumps Station, ….)
f.Training courses for NWC engineers about the NWC system requirements and design criteria and Design handly method without softwareand design and modeling Sewer network.
PROJECT NAME : AL-FAISALIYAH MIXING CHAMBER OF DRINKING WATER IN JEDDAH
Employer Name : SAUDI CONSULTING SERVICES - SAUD CONSULT.
Position : Senior Water Resources Engineer /QA-QC
From : June 2015 to September 2016
Client : National Water Company - ( NWC )
Estimated Cos : ( 96.000.000 ) SR
Location : Jeddah
My Responsibilities are:
Supervising the construction works of the Drinking water mixing chamber as QA-QC Position to Adoption of the materials submitted by the contractor ( Abu Algadayal ) in addition to the following :
Design Review the construction Drawings Designed by Saudi Engineering Union (Khatib and Alami).
Design Review the Hydraulic Analysis network and Hydraulic Report submitted by (Artelia Co & Sogreah Co) .
PROJECT NAME: 3 PROJECTS IN YANBU CITY CONTRACTED BY YAMAMAH & IAMAR COMPANIES
Employer Name : SAUDI CONSULTING SERVICES - SAUD CONSULT.
Position : Senior Design review Engineer/ Wastewater netwok
From : January 2015 to June 2015
Client : National Water Company - ( NWC )
Estimated Cost : ( 270.000.000 ) SR
Location : Yanbu
My Responsibilities are:
Those projects are : (Sewage Water Lines) And (Execution The Main Pumping Stations) And (Raising The Efficiency Of The Main Sewage Pumping Station)
Design review the Hydraulic Analysis for for those three projects, consisting of (total lengths of Pipe networks is 70 km - 5 Pump Stations - 3 Lift Stations)
Design review, Calculations, Shop drawings & as Built drawings, and solve all problems of Infrastructure networks.
PROJECT NAME: DESIGN STORMWATER AND REDUCE THE LEVEL OF GROUNDWATER
Employer Name : SAUDI CONSULTING SERVICES - SAUD CONSULT
Position : Senior Stromwater Design Engineer
From : February 2014 to December 2014
Client : Eastern Province Municipality
Estimated Cost : (400.000.000)SR
Location : Dammam
My Responsibilities is:
Setting the initial study to link the second design stage with the first stage implemented, By studying the level and diameters of the outfall, And study the variable groundwater level, n addition to linking the new area points with the old regions and unifying the benchmark point
Design and modeling stormwaterLines for Dammam and Dhahran and Al Khobar, with Unlimited software (SewerGems V8i), the Catchment area was 100 km2, and Design lift stations with capacity of 20,000 m3/h ; those Network lines are set Taking into account Topography of the Earth a by GIS and All existing and future Utilities networks, of water, drainage, electricity, petroleum, telephone and mobile networks, which we obtained from government departments. Develop the Preliminary Design Report of the project strategy, and all proposed scenarios.
Study the Catchment and porosity and the impermeable stratum and infiltration and groundwater flow and interflow, and interference of wells, and the overland flow and perennial stream and surface runoff
Study the quantity of stormwater by Rational method, input the Return Period 10-25 years in the IDF graphic curve to know the Rainfall intensity. take into consideration the time on concentration is 5-10 mints and the suitable factor of surface runoff for each area, from Manning formula the result is the Diameter of pipe
Prepare calculations and hydraulic analysis of scenarios proposed of stormwaterflows, to reach the lowest possible cost in terms of pipe size and coverage.
PROJECT NAME : DESIGN MASTER PLAN INDUSTRIAL CITIES IN KSA
Employer Name RADICON GULF CONSULT
Position : Senior Utility Design Engineer
From : February 2012 to January 2014
Client : MODON
Estimated Cost : (unknown) SR
Location : Al-Khobar
My Responsibilities are:
Those cities are : (Women's industrial city in Al Hasa, area of 500,000 m2) and (Industrial city in Dohrma, area of 5,000,000 m2) and (The 4th industrial city in Jeddah, area of 5,000,000 m2)
management of the Design team to Study and locate all existing Or proposed of the owner like Water facilities, Water Reservoirs, and Fire facilities, and Stormwater facilities, and Irrigation facilities
Preparing the Diagram of the water flow, drink water net, sewer water net, stormwaternet, and irrigation lines, to control the demand of future sewage water, and the capacity of STP.
management of the Design team to prepare Infrastructure Reports, like (Concept Design - Roads - electricity - surface System of StormwaterDrainage - Potable and Fire Water Distribution System - Wastewater Collection and industrial Wastewater Collection System - Irrigation System - Landscape Design ).
PROJECT NAME: STORMWATERAND ROADS PROJECTS, NEAR BEACHES AND DOCKS
Employer Name : AL-HABSHI & INFRASTRUCTURE IAMMAR CONTRACTOR CO
Position : Projects Manager Of StormWater Projetc
From : March 2010 to January 2012
Estimated Cost : ( 70.000.000 ) SR
Client : EASTERN PROVINCE MUNICIPALITY
Location : Khobar - Dammam
My Responsibilities are :
Execution stormwater Lines long to 12km from GRP pipes Diameter of 400 to 3000 mm, and catch basin, and Manholes Depths to -12 m, and Build Pressure Line / Diameter of 1200mm Long 800 m, and Horizontal directional drilling ( HDD) with two pipes Diameter 1100 mm long 60 m .
Execution box and Pipe culverts under the road, to transfer water to the Artificial Lake,
Execution Highway near Bahrain Bridge, on the coast directly, with attention to the existing marine docks, seemed as fingers in the sea, and Build a new marine pavement with new docks for expanding the width of the existing road to 60 m width along 7 km, by Backfill the sea with Boulder and Pitching.
PROJECT NAME: PROJECTS OF ENGINEERING UNIT CONSULTING IN ALEPPO UNIVERSITY
Employer Name : THE ENGINEERING UNIT AT ALEPPO UNIVERSITY
Position : Senior Principal Design Engineer
Company Location : Syria -Aleppo
From : March 2003 to February 2010
My Responsibilities are Design Engineer for the following projects:
1- Design of Mix Networks sewer water and Stormwater
Design Of Mix Network For Sewer Water And StormWater and Torrents For Four Villages In IDLIB.
Design Of Mix Network For Sewerwater And StormWater of Hittin Housing Town .
2- Design of Autostrada Aleppo Al-Raqah City ( 48.000.000) $
Participation in study and design highway project from Aleppo City to Al-Raqah City Length of 186 km,
Study The Drainage Of Floodwater In Low-Lying Areas, And Study Pipe Culvert, And Box Culvert, And Siphons In The Necessary Places.
Structural Study Of A Number Of Box Culvert About 30 With Multiple Dimensions, Class (12 Slots X 3m X 3m) To ( 2solts X 1m X 1m) ; To Divert Flood Water And Torrents .
3- Lecturer at Faculty of Civil and Architectural Engineering
Books of Environmental Engineering - sewage water - Traffic Engineering
PROJECT NAME: CHECK ENVIRONMENTAL INDUSTRIAL DRAWINGS
Employer Name : SYRIAN ENGINEERING SYNDICATE
Position : Senior Environmental Consultant Engineer
Company Location : SYR- Aleppo
From : January 2007 to February 2010
My Responsibilities are: Check the environmental requirements for the industrial projects for a license
PROJECT NAME: COMPLETION 47 VILLAS
Employer Name : AL- AFRA CONTRACTING
Position : Site Civil Engineer
Project Location : UAE -Abu Dhabi
From : January 2000 to February 2003
PROJECT NAME : MANUFACTURE STEEL HANGAR AND COOLING & RESERVOIRS
Employer Name : KRAYEM INDUSTRIES CO
Position : Construction Engineer
Company Location : Syria - Aleppo
From : November 1997 to January 2000
Qualifications
& Education
BSc. Degree In Civil Engineering - Environment Engineering / Complete : Aleppo University, On 10-1997
Post-graduate Diploma In Environment Engineering / Complete : Aleppo University, Syria On 11-2000
Scholarship - Master In Environment Engineering / Not complete : University of Padova, Italy On 2001
Scholarship - PHD study in traffic engineering, / Not complete : Government Penza University, Russia, On 2006, The title of the PhD thesis is " Modeling traffic flows in the Syrian Arab Republic "
< Computer Software Skills
1Ms Office
2MTeams & Microsort teams
3Go to Meeting & Webex Meeting
4Autocad 2002
5Google Earth pro.
6Sewer Cad 5.5
7Sewer Gems V8i
8Storm Cad V8i Saudi Consulting April 2014
9Water Cad V8i Saudi Consulting June 2015
10Land disktop Syrian Engineering Syndicate October 2011
11Staad Pro
1 Professional certificates
1.Primavera Khatib Center August 2004
2.Project Management Professional AlKhawarizmi College July 2016
3.OSHA Safety : Transport Safety Udemy June 2016
4.OSHA Safety : PPE Udemy June 2016
5.How to Run Professional Meetings Udemy June 2016
6.Courses In Information Security, HSE And Hazard JACOBS ch2m 2018
i.hazard communication training in accordance with 1910.1200 JACOBS ch2m May 2018
ii.HSE – Medical Course CH2M HILL May 2018
iii.Email Security
iv.Mobile Security
v.Password Security
vi.Phishing Awareness
vii.Protecting company information
7.Courses In Projects Management (pom) PARSONS 2016
i.Contract Adimnistration
ii.Project Controls
iii.Project Interation Management
iv.Project Quality Management
v.Safety And Environment Management
vi.Request For Proposal
vii.Document Control
2 Professional registration
I.Saudi Council of Engineers : Membership (189 650), Professional Engineer, Validity up to 26-4-2022
II.Syrian Engineering Syndicate : Membership (61 807) Consultant Environmental Engineer
Member of the Environment Committee
III.Syrian Computer Society : Since 1998, Level of Participation: active Engineer
Best regards
Engineer Muhamed Sallah
KSA - Jeddah