.
.
Ramkannan GT
Mechanical Engineer
Tirunelveli, Tamilnadu, 627011
***********@*****.***
Seeking a responsible career opportunity in a technologically competing and up-surging mechanical industry which will provide a platform wherein, I can utilize the knowledge gained from the experience in the most productive and creative way to enhance the productivity and quality of the product which in-turn aids in achieving the vision and mission of the company Work History
Production Supervisor
Brakes India Private Limited, Chennai, Tamilnadu
• Created and implemented strategies for improving productivity and thereby operational efficiency.
• Involved in rejection analysis of the in-house and field rejection components and thereby providing the solutions in reducing the in-house and field rejections and thereby reducing the rejection / rework CPC and thereby reducing the overall CPC which in-turn improves the profit margin of the product and gain the customers confidence in buying the product
• Successful in implementing 5S concepts in the production line and thereby improving the availability time for achieving the desired OEE.
• Being a successful team player, involved in supported activities in accomplishing TPM advanced special award for the company.
• Participated in training Programme on Japanese Management Techniques – Lean Manufacturing Processes hosted by ABK-AOTS DOSOKAI, Tamilnadu Circle
• Successfully involved in the activities pertaining to the implementation of TPM Activities which focused mainly on the improvement of the company while improving the management skills of the people
• Collaborated with internal teams to streamline operations across materials handling, production and shipping.
2008-06 - Current
.
.
Production Engineer
TI Tube Products of India Limited, Chennai, Tamilnadu
• TI Tube products of India Ltd, Chennai, from June 2006 to Oct 2008.
• Manufacturing of Precession Hollow tubes
• Worked as a production engineer in leading manufacturing of automobile accessories like
• precession hollow tube. Execution of production and maintaining the quality for the customer requirement.
Roles and responsibilities
• Man power allocation based on the available resources in various machines.
• Process flow straightening, Cutting, Eddy Current test, Oiling, Packing & Dispatch is controlled as per schedule.
• Practicing continuous improvement activities trough KAIZEN.
• Identified risk mitigation actions to reduce injuries, accidents and hazards in production environment.
• Practiced lean principles, which led to improvements in workflow and quality and waste reduction.
Apprenticeship Trainee
Ashok Leyland, Chennai, Tamilnadu
• Worked as Apprenticeship Trainee in Ashok Leyland Ltd. Manufacturing of Chassis assembly in line,
• Engine Assembly section, Gearbox Assembly section, Gear manufacturing. Education
B.Tech in Mechanical Engineering
SRM University - Chennai
Graduated in First Class
Diploma in Mechanical Engineering: Mechanical Engineering Sankar Polytechnic College - Tirunelveli
Graduated in first Class with Distinction
ITI
Government ITI - Tirunelveli
Completed with 77% Marks
SSLC
St. John's Hr. Sec. School - Tirunelveli
Skills
Assembly and production
Production targets
Quality assurance
2006-06 - 2008-10
2001-06 - 2002-06
2011-06 - 2014-05
2003-01 - 2006-01
1998-01 - 2000-01
1997-06 - 1998-05
.
.
Staff Management
Equipment monitoring
Safety and compliance
Accomplishments in Brakes India
• Successfully holding Yellow Belt in Six-Sigma
• Supervising team of more than 50 members with gender equality
• Successful holding of Jishu-Hozen unit co-ordinator for slip Control Systems and supported in implementing TPM concepts focusing towards the elimination of Muda, Mura and Muri.
• Successfully holding the position as unit 5S Co-Ordinator and have done lot of improvements in implementing the 5S concepts and ensuring its sustenance.
• Successful analysis of end cap assembly failures modes & reasons and improved the First-time pass from 60% to 90%
• Successful reduction of in-house component rejection from 10% to less than 1% in ABS Hydraulic Control unit.
• Improved the man power productivity in TMC Assembly line.
• Achieved 100% on-time production of good quality components for satisfying customer requirements in-time and thereby supported in eliminating the customer line stoppages.
• Successfully implementing more than 20 Kaizens every year continuously for last 10 years and the cumulative kaizens implemented accounts to 256
• Successfully completed more than 5 Quality Circle Competitions and contributed to total savings of more than Rs. 10 Lakhs cumulatively through manpower optimisation, Productivity improvement and reduced in-house rejection.
• Honoured with 10 Year Service award during Founders day celebration of FY2018-19
• Honoured with Best Kaizen award of the year for the financial years 2010- 11 and 2012-13.
Software
AutoCAD 2020
MS Office
.