Post Job Free
Sign in

Engineer Industrial Training

Location:
India
Posted:
December 12, 2020

Contact this candidate

Resume:

WASEEM AKHTAR

·Work in TORRENT POWER Ltd. Agra Address: Waseem Akhtar

Diploma in Electrical Engineering S/O,Shri Abdul Rahman

Diploma in Computer Application Near Sardar Patel School

Panna Naka Umari

Satna (M.P.)485001

Email ID: ***************@*****.***

Mob.no.097********,089********

ABOUT ME :Seeking a challenging position power system where my skill and knowledge can be utilized for the growth of the

organization and self.

QUALIFICATION:

Year of Passing

Qualification

Institute

University/Board

Percentage

2007-09

Diploma(Electrical)

S.V. Polytechnic Collage Bhopal

RGTU Bhopal

68.43%

2006

12th

Govt.Venkat H.S. No1 school Satna

M.P.Board

75.11%

2004

10th

Govt.Venkat H.S. No1 school Satna

M.P.Board

70.40%

WORK EXPERINCE:

From Sept. 2009: Working with leading Power Distribution Company as Junior Engineer till date.

Company: - TORRENT POWER LIMITED, AGRA (Distribution Franchise)

Licensee: - Dakshinanchal Vidyut Vitran Nigam Limited (DVVNL)

I am involved with the following departments during my work:-

Professional Synopsis

1+ year experience in Project Management, Site Engineering and Team Management.

Presently associated with torrent power, Agra as junior Engineer in network management.

Proficient in deploying and coordinating the operations of large task groups with demonstrated leadership qualities & organizational skills during the tenure.

Experience in installation, integration, deployment, operation and maintenance of various systems.

Excellent organization building capability with proven ability in planning optimal utilization of resources.

Experience of undertaking power distribution projects.

Core Competencies

Operation and Maintenance

1 Erection & commissioning of various

2 Planning and effectuating predictive & preventive maintenance schedules of various equipments to enhance the equipment reliability and increasing machine up time.

3 Taking steps to rectify the equipments through application of troubleshooting tools.

4 Design, Installation and Execution of purposed Distribution Routes.

5 Handling Team of Contractor and Engineer for Execution and installation Purpose With Them.

Site Management

·1Managing all site activities including providing technical inputs for methodologies & co-ordination with Site Management as part of overall engineering support planning.

2 Mobilizing and supervising manpower resources for various types of job, resolving bottlenecks and ensuring their focus towards project goals in a cohesive manner.

3 Negotiating with vendors for the procurement of material / equipment, as per project requirements.

Organizational Experience

1 Network Management

•Attending Lt and Ht breakdown.

•Project planing,scheduling & monitoring for distribution of LT&HT network.

•Improve the old network for reducing the breakdowns and NPC.

•Planing for revamping of old network for reducing the NPC.

•Maintenance of ABC conductor and ACSR conductor.

•Electrical Pole Shifting.

•Installation of LT Lines .

•Maintenance of tail race of transformer .

•Laying of UG LT lines .

•UG cable Jointing .

•Installation Meters .

•Laying of Lt cables .

•Attending LT and HT breakdowns.

•Patrolling of ht feeder at breakdown time.

•Attending LT ug faults.

2 No Power Complaint

• Update SINGLE LINE DIAGRAM BOOK (SDB)

• Fault allocation to gangs at site and handling manpower for NPC section.

• Roster plan formation for staff.

• Handling HT as well as LT complaints .

• Imparted training to junior staff for Network Management and No Power Complaints.

• Fault attending in NPC section.

• Handling HT as well as Lt consumer complaints.

• Prepare damage memo.

• Servery of new consumer.

• Permit to work given to contractor lineman.

• Prepare safety audit report.

• Installation of MCB's and HRC.

• Repair lt jumper 's and re jumpering .

• Reconnection and disconnection of lt and ht consumers.

• meter sealing and re termination of service cable.

3 2 month working with RPRC department.

4 1 month training at TORRENT POWER Bhiwandi Maharastra.

5 Meter reading & Distribution (MRBD).

Allots area & bills to meter readers on the basis of group lot.

6 Non payment of bill(NPB).

Disconnection and Reconnection of lt as well as HT consumers .

Punch disconnection & reconnection.

SUMMER INTERNSHIP:

June-July 2008: 1 two week’s industrial training on “MPSEB BHOPA LMP”

2 two week’s industrial training on “NTPC BAITUL MP”

PROJECTS:

Academic Project: Major Project on “ELECTRICAL& ELECTRONIC DEVICE TESTING” at college level.

1)COMPUTER PROFICIENCY: DIPLOMA IN COMPUTER APPLICATION

Operating System: Windows XP/98, Proficiency in MS Office.

2)AREA OF INTREST:

Machines

Power System.

3)HOBBIES:

Playing chess, Listening Music.

4)EXTRA CURRICULAR ACTIVITIES:

NCC “A” Certificate at school level.

5)PERSONAL DETAILS:

Name : WASEEM AKHTAR

Father’s Name : Sh. Abdul Rahman

Date of Birth : 01September1989

Gender : Male

Marital Status : Unmarried

Nationality : Indian

Linguistic Skills : Hindi, English

Permanent Address : Near Sardar Patel school panna Naka

Umari Satna 485001 M.P.

DECLERATION:

I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars.

Place: WASEEM AKHTAR

Date:



Contact this candidate