Walter Scott Hughes
Thicket Tx. 77374
P.O. Box 20
Thicket Tx 77374
Cell 936-***-****
CREDENTIALS
Over 20 years oil and gas exploration experience, with 7 1/2 years as a drilling consultant in Oklahoma Scoop and Stack drilling horizonal wells in the Woodford, Springer, Sycamore, Mississippi Lime formations up to 10,000’ laterals.
Communicate well with all levels of management, contractors, and team members.
Utilize total quality and safety management principles to operate successfully in a stressful, fast-paced, deadline-oriented, “no errors” environment.
1- year experience in pipeline maintenance and construction.
CERTIFICATIONS
Well control and blow out prevention.
ISTC Basic plus
Safe Land/Safe gulf
WORK HISTORY
GULF COAST PIPELINE SERVICES
Operator/Laborer – October 2019 to Current
Responsibilities include anomaly digs and assisting with pig runs, bolt-up fitting, line location, and hydrotesting of lines.
MARATHON OIL
Wellsite Supervisor – March 2019 to September 2019
Working with the team to insure we drill quality wells putting safety as top priority, while communicating with superintendent, engineer and directional team to drill successful efficient wells in the Meramec, Woodford And Springer Shales. Batch drilling on multi well pads. Using the Managed pressure drilling (MPD) System as needed out from under surface to TD of wells. Insuring everyone is Life Critical trained and in the ISN network before starting work on Marathon location. Worked with wellview for over 7 years submitting morning reports.
CONTINENTAL RESOURCES
Wellsite Supervisor - January 2012 to February 2019
Work with Engineer, Superintendent and directional team to drill horizonal wells the safest and most efficient way in the Oklahoma Scoop Field. (Woodford, Springer, and Sycamore shale plays)
DDC
Level 3 Directional Driller September 2011 – January 2012
Work with drilling engineer, company man and rig personal drilling horizonal wells in the Haynesville, Barnet, Eagle Ford, And Fayetteville Shale plays.
NOMAC DRILLING Marshall, Tx
Rig Manager August 2010 – September 2011
Responsibilities included supervising rig crew and assisting rig crew in daily maintenance of rig and repairs. Holding pre-tour safety meetings with crews and discussing any hazards associated with up-coming tasks.
Driller June 2008 – August 2010 (promoted to Rig Manager)
Responsibilities included Operating rig and over seeing rig crew during day to day operations.
Derrick-man April 2008 – June 2008 (promoted to driller)
Responsibilities included mixing mud additives and maintaining mud weights and assisting the driller in operating rig and over-seeing rig crew.
MEAD WESTVACO, Evadale, Tx
Operator October 2000 – April 2008
MARINE DRILLING, Sugar Land, Tx.
Crane Operator February 1998 – October 2000
Floors and Derricks October 1992 – February 1998
REFERENCES
Cory Marsh
Energy Transfer
Brian Butler, Pioneer
Andy Cogburn, Marathon Oil
Jeremy Yarborough, Continental Resources