ASHWANI GUPTA. (GM, Electrical & Automation)
Professional Skills B e h a v i o r a l Skills
Strategic Planning, Scheduling & Implementation * Team Building & Leadership
Total Productive Maintenance * Effective Communication
Value Additions / Innovation * Interpersonal Relation
ISO 9001, OHSAS 18001 activities * Delegation
Energy Conservation, condition monitoring * Subordinate development Professional Experience
Presently I am working in Valley Iron & Steel Co Ltd, Paonta Sahib (HP) since 2015, its final products are SS pipe, coils and flat.
My Existing Experience
Preventive Maintenance & Corrective Maintenance of 220/11KV Sub Station
(Transformer 63MVA, VCB, SF6, Isolator Switch, Checking of Relays) and 33/11KV substation.
Preventive Maintenance of Electrical Equipment of Steel Melting Shop (20MT induction furnace, AOD, Caster and all utility equipment i.e. Pump House, Laboratories, DG set, Oxygen Plant, Electrical Work Shop).
Preventive Maintenance of Hot Rolling & Tendam Mill Electrical Equipment i.e. DC motors, DC drives (Siemens) and utility equipment.
Preventive Maintenance of Electrical Equipment of Cold Rolling Mill, Annealing & Pickling line, Shot Blasting, BA line i.e. DC motors, DC drives (Siemens) and utility equipment.
Project: Three Induction furnaces Crucible of 20T capacity with two panel erection work is under progress.
I had worked in Jindal Stainless Limited Hisar from 1989 to 2015; it was an integrated steel plant with annual capacity of 0.80 MT.
My prime responsibility was to availability of electrical equipment of Electric Arc Furnace
(45MT), Bloom Caster (two strands), Slab Caster, EOT Crane, Pollution Plant, Ladle Refining Furnace, Induction Furnace, AOD, Shot Blasting, and Auto Grinder. Job Profile
Planning of Maintenance Schedule & Implementation
Man Power Planning for Day to Day activity.
Implementation of new Projects
Training to Subordinates
Communication with peers for availability of equipment for maintenance
Spare Management, identify of spares, indenting and correspondence with supplier.
Yearly budget and monitoring
Main experience
Maintenance and Electrical operation of following main equipment’s electrical system and automation of Steel Melting Shop
• Electro-hydraulic controlled 40MT EAF with MA200/1 PLC control-ABB.
• Arc Furnace Transformer 36 MVA, 11KV/(200-610)V
• On Load Tap Changer make- BHEL and ESUAN-MR.
• Electrical controlled 50 T LRF.
• Two strands 200x200mm Bloom Casting Machine – PLC 5/60 Allen Bradley
• Induction furnace 20MT capacity- Electrotherm make
• Slab Caster Max. width 1250mm – PLC RS Logix5000 Allen Bradley
• EOT cranes up to 125 T capacity – WMI
• Fume Extraction System
• Material handling equipments.
• Service & utility equipments.
• Electro-hydraulic controlled 40MT EAF- SIMELT AC Electrode Regulation System
• Shot Blasting Machine, Step S7-300 PLC control
• Auto Grinder, Step S7-400 PLC control
Working in Project & Developments
Erection and commissioning of
• Two Strand Bloom Caster Electrical systems like MCC panel, DC Drive (Analog) in 1989.
• Slab Caster (1270mm width) Electrical systems like MCC panel, DC Drive (Analog) in 1990.
• Slab Caster analog system replace with digital, install PLC 5/60 make Allen Bradley and DC Drive 1395 of Allen Bradley in 1994.
• Bloom Caster analog system replace with digital, install PLC 5/60 make Allen Bradley and DC Drive 1395 of Allen Bradley in 1995.
• Electric Arc Furnace 35MT ABB make, electrode control with hydraulic system, Electrode Regulation System and Melt Control System with PLC MA 200/1 ABB make in 1997.
• Bloom Caster two strand (200x200mm) make Concast India and automation with PLC 5/60 make Rockwell Automation and AC drive 1336 plus in 1997.
• EOT 100/35T crane make WMI.
• LRF electrode control panel and testing.
• Designing of PCC and MCC panel for Slab Caster (1250mm width), planning regarding execution of the project i.e. cable schedule, location of the panels, installation of the panel etc in 2005.
• All planning and execution of the project to replace Electric Arc Furnace Transformer from 25MVA to 36 MVA in 2005.
• Shot Blasting machine for Slab in 2006.
• Auto Grinder (China make) for Slab in 2006.
• Design of PCC and MCC panel for Pump’s motor in 2008.
• Execution of Electro Magnetic Sterer (ABB) project for Bloom Caster in 2009.
• Execution of Auto Grinder (Danieli) project for Slab in 2009.
• Replace the Electrode regulation panel of Electric Arc Furnace from ABB make to Siemens SIMELT AC Electrode Regulation and MDC in 2009. Prepare I/O list of existing control system, cable schedule, new design of control desk, Interlocking in PLC S7-400 system, operational programming in HMI for MDC.
• Replacement of Electrode Regulation System of SMS1 is under progress. Exposure
A u t o m a t i o n
Have experience to modify the program in PLC’s –
• Allen Bradley 5/60, ABB MP200/1 and Control Logix 5555, S7-Siemens.
• Automatic Electrode Regulation, SIMELT AC, Siemens make
• RS-View32, Allen Bradley
P o w e r E l e c t r o n i c s
Have experience to find out problem of following type of drives, setting of parameters and testing of motors.
• Digital DC drives-1395, Allen Bradley.
• Digital AC drives-1336, Allen Bradley, Power Flex -700, Micro Master – Siemens, Simovert Drive -Siemens, Sinamics Siemens.
• LRF winch motor control system-Power Electronics and Project. E l e c t r i c a l
• Power Transformer-EMCO, Power Transformer – CGL up to 36MVA
• On Load Tap Changer, ESUAN-MR and BHEL make
• Vacuum Circuit Breaker up to 3150Amp. Siemens make
• LT Panels ( Star Delta Starter, Rev/Fwd Starter, DOL Starter)
• AC Sq Cage motors up to 220 kW, Slip Ring Motors up to 225kw, DC motors. Training
• ISO9001-2000 & related documentation. OHSAS 18000 and EMS 14000.
• Digital DC Drive 1395 (Allen Bradley Ltd.)
• PLC 5/60 Maintenance (Allen Bradley Ltd.)
• PLC - MP200/1 Programming (Asia Brown Boveri Banglore)
• Team Leadership, Personality Development, Communication Skills.
• Lead Auditor from BSI.
• Management Development Institute, Gurgoan
Expected salary: Negotiable.
Education
• AMIE ‘A’ Section - 1991 - The Institute of Engineers, India
• Diploma in Electrical Engineering - 80% (3rd Position in UP), UP Tech Board, Lucknow in 1988
• B.Sc - 57% from Meerut University, Meerut in 1985.
• 12th - 54.6% from U.P. Board in 1983
• 10th - 54.6% from U.P. Board in 1981
PERSONAL DETAILS:
Date of Birth: 17-11-1966
Nationality: Indian
Marital Status: Married
ASHWANI KUMAR GUPTA ***********@*****.***
S/O SH. Sunder Lal Gupta Mobile no.-989-***-****