Post Job Free

Resume

Sign in

Manager Mechanical Engineer

Location:
Dubai, United Arab Emirates
Posted:
December 11, 2020

Contact this candidate

Resume:

* ** * * * g e

Ashish Kumar Misra, Sr. Projects Manager-MEP, adikrp@r.postjobfree.com, 009**-********* Ashish Kumar Misra

Mobile: 009**-**-*******

Email: adikrp@r.postjobfree.com, adikrp@r.postjobfree.com Application for the post of MEP-Sr. Projects Manager / Projects Director with 24+ years of experience in MEP / Electromechanical WORKS Dear Sir,

I wish to offer myself as one of the candidate for the post mention above. My present job responsibilities and capabilities are in the Planning, Execution, Testing and Commissioning of MEP Projects, which involves HVAC, Plumbing, Drainage, Fire Fighting, Electrical and ELV Systems.

HVAC Systems involves installation of ducting (GI & Pre-insulated) with complete accessories, all type of A/C units (DX types and chilled water types), and VRF system. All type of ventilation / exhaust fans. Underground / above ground chilled water / condensing water pipelines / piping’s with all accessories, fittings and control fittings including installation of water and air cooled chiller plants having all equipment such as pumps, heat exchanger, AHUs, FCUs, FAHUs, ecological units, cooling tower, cold storage, District cooling system etc. Plumbing and Drainage involves underground and above ground water and drainage piping’s with valve chambers and sewage manholes, Sewage Pumping manhole stations / STP, domestic / irrigation water pump rooms, R.O Plant, Solar Plant, filtration system, Dosing system, water tanks, water heaters/ Calorifiers and installation of sanitary ware fixtures and fittings etc. Fire Fighting Services involves installation of GI piping, sprinklers head all type, fire hose reel with cabinets, fire hydrant, fire extinguisher, breeching inlets, fire hose rack with landing valve, zone control valve assembly, firefighting pump room set, FM-200 in Electrical substation, pre action sprinkler system in lift machine room, foam agent system in diesel generator room and deluge system etc. Electrical Services involves installation of primary cabinets, MCC, MCP, MCCP, DB S, SMDBs, MDBs EMDB S, Transformers, capacitor banks, Lighting fixtures (external and internal), Lightning Protection, Bus bars, cable trunking, wiring with all accessories, lighting controls, cable trays, ladders and earthing system etc. ELV systems involves installation of CCTV, SMATV, PAVA, fire alarm, Access Controls, Gate barriers, Structure cabling, BMS / BAS, Central battery / UPS, etc. The projects include High-rise commercial & Residential Buildings, Hotels, Hospitals, Airport terminals, Schools, Metros, Restaurants, Clubhouse, Parks, Warehouse, Luxurious villas, Palaces, Infrastructure and Industrial projects (Please see the list of projects annexed herewith) I am a license holder certified / approved engineer by Dubai Municipality (Reg. no. 114900) for the above services in their electromechanical projects under electromechanical equipment’s installation /maintenance contractors. Affiliated and member of UAE Society of Engineers Reg. no: 2018 / 52350 Experience in Projects Management / Coordination, Project Planning / scheduling, Estimation, Contracts and sub contracts finalization. Well conversant with FIDIC standard contracts. I had earlier experience in Plant Piping, Pipelines, Tanks, Structural Works, Equipment’s Erection, Painting, Blasting, Cathodes Protection, Wrapping-Coating, Welding, Preheating, PWHT, Refractory Insulation, Hydro testing, Air Blowing, Pigging, Vacuum test. Monitor NDT activities, such as RT, UT, MP and DP TESTS. Preparation of WPS, WPQT (PQR), WQT procedures etc. QC records preparations & preparation of final Dossiers etc.

I am also enclosing below my detailed Resume for your consideration please. I hope to hear a favorable response at your earliest convenience from your good office. Yours faithfully

Ashish Kumar Misra

2 of 5 P a g e

Ashish Kumar Misra, Sr. Projects Manager-MEP, adikrp@r.postjobfree.com, 009**-********* CURRICULUM VITAE

NAME Ashish Kumar Misra

FATHER’S NAME Mr. C K Misra

DATE OF BIRTH 26-09-1975

PASSPORT NO L 4579596, Indian

UAE DRIVING LICENCE Valid up to – Y 2024

LANGUAGE SKILLS Hindi / English

MARITAL STATUS Married with 2 kids

MOBILE 009**-**-*******

EMAIL adikrp@r.postjobfree.com, adikrp@r.postjobfree.com PROFESSIONAL QUALIFICATIONS

Bachelor of Mechanical Engineering in 1996 from MIT- Manipal Institute of Technology- Manipal, Securing First Division with Distinction.

MBA - Marketing from IMT Ghaziabad.

Diploma in Materials Management from AIIMS Madras. ACADEMIC QUALIFICATIONS

Higher Secondary School (10+2) in 1992 from Kendriya Vidyalaya Mathura, Securing First Division with Distinction.

EXTRA / ADDITIONAL CERTIFICATIONS

Certification in Project Management using Primavera Project Planner, Version (P3) as Professional tool.

Certification in PMI @ Project Management Institute courses and certificate training.

License holder certified / Approved Engineer by Dubai Municipality (Reg no. 114900) for electromechanical Projects under electromechanical equipment installation /maintenance contractors.

Affiliated Member of UAE Society of Engineers Reg no : 2018 / 52350

Certification in Piping Engineering Design Course (CEASER-11) at CAD Centre, IIT Bombay (Powai)

Certification in AUTO CAD from MIT Manipal.

Certification in NDT, ASNT LEVEL 11, in RT.

Certification in Introvalve Penstocks and Flow Control equipment’s at M/s Hepworth PME LLC Training School in Dubai.

Well conversant with Computer Knowledge, Microsoft Excel and Word star, Planning packages for projects (MS Projects).

JOB RESPONSIBILITIES - OVERVIEW

Contract review & job cost analysis.

Project management, project control, project execution, project monitoring Project design / detail engineering, finalization of all resources required for the Project, Project planning, project coordination, Mobilization, Demobilization, Testing / Commissioning, Design Detail Engineering, Claims, Variations, Subcontract finalization and TOC with successful handover of the project. Organizing and assuring proper smoothness throughout DLP period.

Preparation of project planning schedules with manpower projections and cash flows.

Reviewing of all quality control documents related to the projects.

Planning and execution of all day to day activities.

Coordination with all services and agencies involved.

Attend all technical Meetings with Consultants, Clients, Main Contractor and coordinate works with other trades.

3 of 5 P a g e

Ashish Kumar Misra, Sr. Projects Manager-MEP, adikrp@r.postjobfree.com, 009**-*********

Control and delegate work to subordinates staff.

Daily site coordination meetings with subordinates in order to evaluate and plan for ongoing and upcoming activities, resolve any unforeseen problems, evaluate progress and quality of work on a daily basis.

Review the Shop Drawing and Material Submittal Plan.

Review the project execution plan.

Review and ensure that company procedures are being implemented.

Carry out daily site visits to monitor progress and performance & notify deficiencies.

Improve the QHSE implementation at each site in liaison with the concerned personal.

Compile monthly evaluation claims

Responsible to ensure Document Control, Communication Protocol and that information transmission is enforced as per company procedures.

Responsible to monitor and control inventory on site.

Responsible to handle disciplinary issues on site. WORK EXPERIENCE (Total 24+ Years)

1) Working as MEP Senior Projects Manager in Pivot Engineering and Contracting LLC in Dubai since Mar 2017 till date.

Looking after all electromechanical / MEP works execution which includes Project Management, Project Planning, Project Coordination, Project Control, Project Execution, Project Monitoring, project Design / Detail Engineering, Finalization of all Resources required for the projects, Mobilization, Demobilization, Testing / Commissioning, claims, variations, subcontract finalization and TOC with successful handover of the project. Organizing and assuring proper smoothness during DLP period without any trouble to the client.

a) Club villas Project (150 villas) at Dubai hills estate development with M/s Emaar (Dubai hills estate) as client, M/s U+A / M/s RAMBOLL as consultant and Pivot Engineering as main Contractor.

b) Azalea Villas Project (108 villas) at Arabian ranches with M/s Emaar as client, M/s Awaj / M/s consistent engineering as consultant and Pivot Engineering as main Contractor. c) Proposed Villas GF+FF+Roof (55 villas) at Arabian ranches with M/s Emaar as client, M/s Design Center as consultant and Pivot Engineering as main Contractor. d) Two Mock up Villas project at Dubai south with M/s Emaar as client, M/s U+A / M/s RAMBOLL as consultants and Pivot Engineering as main Contractor. e) The Terraces (Two Restaurant) project at Arabian ranches with M/s Emaar Mall Group Retail as client, M/s Design center / M/s AK DESIGN as consultants and Pivot Engineering as main Contractor.

f) Golden Sands 14, Residential Building, Al Mankhool (B+G+7) 2) Worked as MEP Senior Projects Manager in M/s United Masters LLC in Dubai (M/s ECC group of companies), from Feb 2015 to Feb 2017.

a) G+4 JVT school in jumeirah village triangle, M/s GAJ LLC as consultant, M/s Fortes/Edutech holdings LLC as client, M/s ABM LLC as Main contractor, total built up area 45000 SQ meters. Looked after all electromechanical works execution which includes project management, project planning, project coordination, mobilization, demobilization, testing / commissioning, claims, variations, subcontract finalization and TOC with successful handover of the project. Organizing and assuring proper smoothness in the process during DLP period without any trouble to the client. b) Talah board factory in khalifa port and industrial zone, M/s Talah board as client, M/s GREEN consulting as consultant, M/s Cemento Engineering Contracting LLC as main contractor (M/s ECC group of companies).

4 of 5 P a g e

Ashish Kumar Misra, Sr. Projects Manager-MEP, adikrp@r.postjobfree.com, 009**-********* 3) Worked as MEP Projects Manager in M/s Albonian International LLC in Dubai, from Aug 2011 to Jan 2015.

a) G+4 staff housing (Four seasons Hotel LLC) in Jabelali, M/s DXB LAB LLC as consultant, M/s Bright Star LLC as client, M/s DCC LLC as Main contractor, M/s HH LLC as project management consultant. Looked after all electromechanical / MEP works execution which includes project management, project planning, project coordination, mobilization, demobilization, testing / commissioning, claims, variations, subcontract finalization and TOC with successful handover of the project.

b) Luxurious villas / palaces compound in different location of Dubai such as Jumeriah, palm Jumeriah etc. client as M/s HH investments and developments / Siddiqi sons’ investment. c) Junabi tower and Al-Hababi tower, 3B+G+M+12 FLOORS with M/s KEO LLC as Consultant, M/s SEG Societe d’Entreprise & de Gestion as main contractor in Abudhabi, UAE. 4) Worked as MEP Project Manager in M/s Arabian MEP Contracting (Al Malki Group of companies) in Doha Qatar from Apr 2010 to Jul 2011. a) New Arrival Terminal (ATB), Air Port Project, M/s Qatar Airway s as client and M/s GHD as Consultant. Looked after all electromechanical / MEP works execution for The Airport Terminal Project which includes project management, project planning, project coordination, mobilization, demobilization, testing / commissioning, claims, variations, subcontract finalization and TOC with successful handover of the project.

b) Supply and installation of air-conditioning & refrigeration units at Doha & Dukan in various projects with M/s QP as client.

5) Worked as MEP Project Manager in M/s ETA M & E Division LLC in Dubai from Oct 2006 to Mar 2010.

Looked after all electromechanical works execution which includes project Management, project planning, project coordination, Mobilization, Demobilization, Testing / Commissioning, claims, variations, subcontract finalization and TOC with successful handover of the project. Organizing and assuring proper smoothness in the process during DLP period without any trouble to the client. a) Dubai Metro Project with M/s RTA as Client and M/s WS Atkins, M/s Parsons / Systra as Consultants.

b) P & L Ware house, Emirates Airlines Storage at Quasis Dubai, with M/s Emirates as Client and M/s CDC as Consultant.

c) Proposed Commercial Hotel Apartments Building 2B+G+M+7 FLOORS at Dera Muteena Dubai, with M/s Alghurair investment as Client and M/s Arif & Bintoak as Consultant. d) Al Thuraya Tower, 3B+G+M+55 FLOORS with M/s archon LLC as Consultant, M/s SS Lootha as Main Contractor in Sharjah, Al Tawun UAE. 6) Worked as Senior Project Engineer Mechanical in M/s a&p Paraskevaides & partners L.L.C.

(Electrical & Mechanical Engineering Contractors) in Dubai and Qatar from Sep 2002 to Sep 2006.

a) HAMMAD HOSPITAL at Doha Qatar with M/s AEB as Consultant Works involved Planning, Execution, Testing and Commissioning of HVAC Systems, drainage, Plumbing and Fire Fighting Services.

b) Zabeel Park at Dubai with M/s WS Atkins’s as consultant and Dubai Municipality as Client Works involved Planning, Execution, Testing and Commissioning of HVAC Systems, Drainage, Plumbing and Fire Fighting Services.

5 of 5 P a g e

Ashish Kumar Misra, Sr. Projects Manager-MEP, adikrp@r.postjobfree.com, 009**-********* c) EPH (Emirates Palace Hotel) at Abu-Dhabi. With M/S Keo and M/S Turner as consultants, Engineering and Project Management.

Total Mechanical works involved Planning, Execution, Testing and Commissioning of chiller Plant i.e. Installation of Complete HVAC System, Plumbing, Drainage, Chilled water / Condensate Water piping underground and above ground, Erection of all equipment s with Chillers, Installation of Cooling tower. 7) Worked as Project Mechanical Engineer in M/s Sumatec Corporation SDN. BHD. (Head Office based at selangor D.E.Malaysia) in Construction field from Dec 1999 to Aug 2002. a) Residential and industrial buildings Joint Consortium with M/s Petrofac International ltd, for M/s GNPOC (Greater Nile Petroleum Operating Company) and M/s OGP Technical services SDN BHD as Consultant at Munga Oil Fields in Sudan. Total Mechanical work Involves, Planning, Execution, Testing and Commissioning of drainage, Plumbing, HVAC system, Fire Fighting Services, for Infrastructure development, Residential / Industrial Projects facilities etc.

b) Male s International Airport Fuel Storage Expansion and Upgrading, Was Posted in Republic of Maldives.

Total Mechanical work Involves, Planning, Execution, Testing and Commissioning of HVAC, drainage, Plumbing, Fire Fighting Services, for Infrastructure Development of Airport fuel Storage tank farm area etc.

8) Worked as Mechanical Engineer in M/s Punj Lloyd Ltd in construction field from Aug 1996 to Nov 1999 was posted in India.

a) Mathura Refinery Project in Hydro cracker Unit. Executed the Fabrication and Erection of Piping Works (CS, AS, SS, IBR CS) and all other related activities involving the piping works. Dealing and Handling of all Designing Aspects of Piping, Providing the Solution at site itself etc.

b) Panipat Refinery Project in Hydro cracker / Hydrogen Generation Unit. Executed the fabrication and Erection of Piping. Executed the Fabrication and Erection work of OHCU HEATER, the work involved Support Structures, Columns, Frames, refractory Insulation Stacks, Coiling etc. Executed the Fabrication and Erection work of Reactor and Regenerator in Hydro Cracker Unit, having plate thickness of around 180mm, work involving M.P test, D.P test, Radiography, Submerged ARC welding, MIG welding, Preheating, Hydro testing, Post weld heat treatment etc. DATE PLACE



Contact this candidate