AKSHAY BANSAL
Charlotte, NC, ***** • +1-704-***-**** • adii0b@r.postjobfree.com • www.linkedin.com/in/akshay-bansal26 EDUCATION
UNIVERSITY OF NORTH CAROLINA AT CHARLOTTE, CHARLOTTE, NORTH CAROLINA Master of Science – Construction & Facilities Management (GPA 4.0/4.0) Dec 2020 RELEVANT COURSEWORK:
• Safety and Risk Management • Advanced Construction Means & Methods • Engineering Analysis V
• Operation of Constructed Facilities • Advanced Construction Materials • Master’s Thesis & Research
• Project Scheduling & Control • Advanced Construction Planning & Management MEDICAPS INSTITUTE OF SCIENCE & TECHNOLOGY, INDORE, INDIA Bachelor of Engineering – Civil Engineering (GPA 3.6/4.0) 2013 –2017 RELEVANT SKILLS & CERTIFICATIONS
CERTIFICATIONS
• Construction Manager-in-Training (CMIT), OSHA30, Procore, Auto Cad 2018
• Participated in International Civil Engineering Symposium organized by American Society of Civil Engineering (ASCE), 2014
• Member of The Honorable Society of Phi Kappa Phi COMPUTING SKILLS
• Management Packages: Procore MS Project Primavera(P6) On-Screen Takeoff MS Excel, MS Office IBM SPSS
• Designing Packages: Auto-CAD 2018 Autodesk Revit 2018 Synchro Navisworks MS Visio ACADEMIC EXPERIENCE
UNC CHARLOTTE, Charlotte, NC Oct 2019 - Present
Research Assistant
• Research Topic: “GUIDANCE FOR USE OF CONSTRUCTION AND INDUSTRIAL WASTE BY-PRODUCTS IN CONCRETE”
• Thesis work guided to support and extend the objective of the Federal Highway Administration (FHWA) Recycled Materials Scope of Work
• Formulated a methodology for evaluating the suitable uses of industrial waste by-products in concrete mixtures as either an aggregate or a supplementary cementitious material based on the literature review and survey of industry and agency (DOTs) personals PROFESSIONAL EXPERIENCE & INTERNSHIPS
B.R. GOYAL INFRASTRUCTURE PVT. LTD., Indore, MP, India Project Engineer Jan 2017 – Nov 2018
• Executed pre-construction and construction tasks for a $24.5M Concrete Road Project (48 miles)
• Assisted the Project Manager in reviewing the Submittals, RFIs, Project drawings and Change orders
• Organized construction site operations by scheduling trades, preparing daily and weekly reports, leading meetings and safety orientations
• Estimated the cost incurred based on the quantities for the Project Manager
• Managed subcontractors to certify that construction projects are carried out safely, efficiently, and on schedule
• Established, modified, and updated construction schedule using Primavera P6 & MS Project B.R. GOYAL INFRASTRUCTURE PVT. LTD., Indore, MP, India Summer Intern July 2016 – Aug 2016
• Familiarized with the processes involved in concrete road construction
• Prepared bill from quantities and maintained material log
• Tested concrete cubes and managed reports
• Estimated the total cost of equipment operation and maintenance
• Headed on-site inspection for safety, quality & construction issues SARTHAK INNOVATIONS PVT. LTD., Indore, MP, India June 2015 – Aug 2015 Project Intern
• Toiled at the construction site of a B+G+8 residential building with 2BHKs and 3BHKs of 210,000 ft plot area
• Conducted a thorough study of parameters influencing construction quality, cost & resource optimization
• Analyzed drawings and the detailing in RCC structures and checked steel layout before concrete pour
• Oversaw quality tracking on jobsite following company’s quality control policy and reported to head office RELEVANT PROJECTS
PRIMAVERA P6 Project Aug 2019 - Dec 2019
• Planned and Scheduled over 100 activities from bid document of new bridge construction using CPM
• Sketched the Work Breakdown Structure and developed the project schedule as per the requirements of job lists, material, and budget SAFETY AUDIT FOR ADMISSION BUILDING AT UNC CHARLOTTE Jan 2019 - May 2019
• Identified safety deficiencies, hazards, consequences and risks in building by performing safety risk evaluations during construction
• Applied safety management principles for complying safety of the site according to the standards issued by OSHA PARTIAL REPLACEMENT OF CEMENT BY GGBS & NATURAL SAND BY QUARRY SAND IN CONCRETE Aug 2016 – Dec 2016
• Conducted a material survey of Cement, GGBS (Ground Granulated Blast-Furnace Slag), Silica Fumes, Marble Dust Powder, Fly Ash, River Sand, Manufactured Sand
• Mix Proportioning for concrete of M-40 grade (40 MPa) and casting of concrete cubes with the mixture and then testing the cubes