SUNIL KUMAR MS-EE, PMP®

PHONE: 682-***-****

EMAIL: adihc0@r.postjobfree.com

SUMMARY

Electrical Masters Graduate with six years of experience in Project Management of EPC -Transmission & Distribution Projects at international sites. Practiced in cost optimization of Utilities, Manpower & Machinery utilization. Excellent leadership, Interpersonal & Organizational skills to work in team and lead them in completing works according to quality standards. I am seeking Full-Time Opportunities in the fields of Power system, Construction of Transmission Lines, Substations. Positions in Project Management, Execution,EPC, Estimation, Planning and Construction Management. SKILLS

Project Planning, Business Development, Resource planning, Bidding Control, Procurement, Logistics, Tenders, ERP, Rapport, Cost-Cutting, Risk Management, Quality & Safety Control, Construction Management, Documentation, Design Analysis, Audits, Technical Writing, Automation, Power dispatch, Power Marketing, Power Flow Analysis, Commissioning. TOOLS

MS-Project, ERP, Primavera-P6, PLC, MS-Excel, Word, PowerPoint, Outlook, MS-VISIO, MS-Access, SQL, SAS, PLS-CADD, AUTOCAD, PSS/E, SCADA, PLC, SCADA, ETAP, PowerWorld, HMI, MATLAB- Simulink, MicroController, P/LTSPICE, DTS. PROGRAMMING LANGUAGES: Familiar with C/C++, Assembly, Embedded, MYSQL, MATLAB, Simulink . EXPERIENCE:

KEC International (RPG Groups). 6 YEARS

Project Manager -EHV -Transmission and Distribution (International) 02/2014 to 04/2018 Associate Manager – EPC (Sub Stations) INDIA 05/2012 to 02/2014 EDUCATION:

MASTER OF SCIENCE: ELECTRICAL AND ELECTRONICS ENGINEERING 2020 UNIVERSITY OF TEXAS AT ARLINGTON,TX USA

BACHELOR OF SCIENCE: ELECTRICAL AND ELECTRONICS ENGINEERING 2012 ANNA UNIVERSITY, CHENNAI,TN INDIA

ROLE AND RESPONSIBILITIES

PROJECT MANAGEMENT:

• Execution of key Project Strategies & Plans to achieve the defined monthly and annual Targets assigned to the site team.

• Conducted Quarterly Safety/QA Audits and documented all observations like NCR, CAR, PAR according to the standards.

• Inventory level Optimization by efficiently overseeing the constant flow of Units into and out of the existing resources.

• Maintained close coordination with the Execution team & Clients to have a close mentoring about the workflow at site.

• Reviewed and evaluated the contractor’s performance aligned with Project Planning to achieve targets through timely DPR.

• Conducted weekly Review meetings with the client to discuss the Project updates and get approval for release of funds.

• Procurement of Electrical Instruments like CT, VT, C.B, Relay, Cables from vendors with technical & economical relationship. PLANNING & EXECUTION:

• Provided hands-on technical support, feasibility studies on Planned Distribution systems and subsystem for contract submission.

• Prepared Micro Planning on Execution, Construction, and commissioning & development of CPM schedules with daily updates.

• Managed with all phases of construction project cycle includes Field Survey, Execution, Construction, and Commissioning.

• Maintained and controlled all project documentation like DPR, RFI, MIS, Permits, Renewals, Cost flow Reports and MOU’s

• Understanding/Evaluating SOW, Plan & Profile, SLD as-built, rating/specification of equipment, and documentation.

• Raised RFI and conducted Quality and Safety inspections on-site and Materials along with client Representatives. CERTIFICATIONS

Professional Engineer –KSA, Certified in Project Planning-PMP, Hotline Works-TEREX, DAMP-Mosdorfer, MATLAB-Math Works.

Project Experience:

Project Manager -EHV -Transmission and Distribution (International) Project : Construction of New Bay Extension for 2 no’s 115/13.8 Kv Substations

• Worked as Project Manager for a New Substation Bay extension & Construction of 2-115/13.8 Kv interlinked with 13.8/11.2 Kv .

• Conducted engineering coordination, Reviews with client, vendors and finalized the Preliminary Designs & detailed S/S Layouts.

• Prepared Equipment Specifications align with Standards /Requirements of site for Procurement and Factory Acceptance testing.

• Engineered in Equipment General Arrangement, Plans & Sectional Views with Equipment Cable, Ducts and Conduit fill calculations.

• Verified and Submitted the Substation Elementary SLD’s, Relay Connection Desings, Panel Layout, Monitoring & Control panels.

• Project Monitoring & Control by Tracking Project Schedule, DPR and provided teams with Action Plans in Achieving Timely goals.

• Member of Core Team & Internal Auditor for Implementation of Integrated Management System & Project Eagle (McKinsey).

• Assisted the Execution team in Internal Budgets, Procurement, Staffing, Policies, Quality & Risk Assessments & Work Allocations.

• Initiated new policies and helped the Organization in Achieve Certification of ISO 9001, ISO 14001:2015, EHS & OHSAS 18001.

• Conducted Communication layout inspection and UG cable laying to communication room with OCMR installation and Testing.

• Worked in the Line protection system installation & modification works for 9 circuits of 230Kv & 380Kv Transmission networks.

• Provided detailed Engineering designs includes substation Grounding Calculations, Lightning Protection & Insulation coordinates.

• Developed and submitted the designs of Sectional, Yard Layout, Plans, Control Building, All Raceways, Grid/Equipment Grounding.

• Constructed and Tested Steel Structure includes Equipment Bases for CT,CVT, Towers Proto Assembly, Erection and Final Passing.

• Conducted and carried out the Final Testing and Commissioning works in Protection and Switching system for all Load levels . Project: Construction of EHV-Transmission Line & Power Cable XLPE

• Constructed More than 600 Miles of EHV-OHTL Transmission lines with Grid integration with other networks & Local Substation.

• Served as Coach for strategic planning, ROW Acquisition, budgeting, subcontracting, EHV compliance & schedule attainment.

• Provided the Site Execution team with proper resources & utilities required as per the day-day Scheduled Work Plans.

• Wiring of OHTL Quad Power Line & OPGW stringing works with hardware installation, Sagging Bundling and Spacer Damp works.

• Carried Tunnel Construction works for the passing of High Power XLPE Cable lines into Substation bay area & Cable Termination.

• Trained and Certified in Supervision of carrying EHV-HOT LINE Emergency works on a Live line & Protection Tools utilization.

• Executed Excavation works and HDD works underground Power Cable crossing High pressure GAS/PETROL lines, Road & Railway.

• Conducted case study and provided Training in Vibration recorder installation and validation of record at high tension/wind cases.

• Executed UG High Power and Communication cable Jointing, Termination and testing commencement at Gantry/Terminal points.

• Installation and maintenance of DTS for XLPE Cable, Communication cable Reroute to Control room for SAS monitoring purpose.

• Maintained close coordination with Project Team to confirm deliverables and services are being provided to client's satisfaction.

• Successfully carried out Emergency OTHL works like Overhead Crossings at Highways/Railways & Power line Shutdown works.

• Conducted multiple High voltage tests at Load Resistivity, Cable Sheath and Load/Phase sequence on both OHTL & Power Cables.

• Carried Final Line inspection along with clients & maintenance works on Snags commented and handing over to Central Grid.

• Prepared the Listing for Tools, Spare part & Hardware fitting & submittals to the Nation Grid and Received Final Acceptance. Associate Manager -EPC -Transmission and Distribution (International) Project : Construction of OF 138/69 KV & 230 /138 KV SUBSTATIONS AT CEBU & COLON

• Executed work plans & latest techniques at site to achieve the targets with cost effective, in line with quality & safety standards.

• Monitored projects with respect to budgeted cost, demand forecasts and time over-runs to ensure seamless execution of projects.

• Reviewed the design submittals, Engineering drawings, & Equipments Technical specifications for Client Submission and Approval.

• Closely Supervised & Controlled the project activities and Critical task with help of software like MSP, Primavera project planner.

• Analyzed and reviewed the contractor's Scope Of Work (SOW), Cost estimates, Change order, Proposals & Submittals.

• Anchoring on-site construction activities to ensure Resource optimization within the time & cost parameter to maximize outputs.

• Conducting field inspection to collect data and evaluate the site conditions and operability of facilities and infrastructure at site.

• Implementation of new initiations for ensuring that Targets & plans are aligned with project requirements are achieved on time.

• Developed Substation Design in accordance with the load requirement, Fault Current Calculation, HV/MV/LV distribution systems.

• Prepared the LOQ, BOM, Tender Estimates and Claim Documents for Utility Resource Planning, verification and Bought out control.

• Managed the Technical, Quality and Physical aspects of the projects to align with SOW & Client Amendments to project necessities.

• Conducted Quality Check of the material in all dimensional & technical requirements to make approved and ready for the export.

• Logistic control for the on-time Shipment of the material to Site through Qualified & reputed Transport sources and Shipping terms.

• To identify the Risks and Hazards at site prior to execution and to take appropriate measures based upon the Scope of work.

• Diagnose system malfunction by Troubleshooting & identify Root Cause in the electrical equipments with in designated schedules.

• Co-ordinate and supervised the Factory testing of Relay, Transformers, Control Panels and Switch-gears for production approval.

• Prepared all Technical Documentation and reports for the Quality and Safety Work Procedure and ISO: 9001 certified Policies.

• Provided support to site team for safety procedures and maintenance of high-quality service standards expected by management. PROJECT COORDINATION –PROJECT MANAGEMENT TRAINEE:

• Understanding and Evaluating of Substation layout,Primary SLD as-built, rating/specification of equipment and documentation.

• Procurement and Specification Validation of Electrical instruments like CT, VT, CB, Relay, Cables, Transformers & Termination kits.

• Planning, installation, and commissioning of11kV Switch-gear system, Control circuit panels, battery bank calculation (UPS).

• Maintained and controlled all reports, technical Documentations from vendor or contractor for the client submission and approval.

• Controlled ERP (Enterprise Resources Planning) system for Material Supply Chain Management & Logistic control coordination.

• Provided hands-on technical support, feasibility studies on planned Distribution systems and subsystem for contract submission.

• Worked on Power flow, transient, steady state, Short circuit, Per unit analysis on the confined circuits in Power World & E-tap.

• Provided technical support in analyzing the Protection relay settings & configuration, load flow analysis and Arc flash calculations. Projects Accomplished

380 KV OHTL INTEGRATION BSP S/S 9009 - S/S 9010 -S/S 9011 - PS3-BSP 9050 S/S 04/2017 – 04/2018 Project.: Power Grid & Communication Network Maintenance & Integration works -372 Miles – $120 Millions Location: Riyadh,Saudi Arabia

Client. : Saudi Electrical Company& NATIONAL GRID -KSA Position.: Project Manager – (International Projects) 380 KV OHTL WORKS BETWEEN PS3 31287 BSP & 9050 S/S (AIRPORT 01/2016 – 09/2017 Project.: Construction of 380 KV OHTL & OPGW Communication Works - 100 Miles - $42 Millions Location: Rumah-Riyadh,Saudi Arabia

Client. : Saudi Electrical Company-KSA

Position.: Project Manager – Electrical (International Projects) OVER HEAD TRANSMISSION LINE – LIVE LINE WORKS TRAINING 03/2016 – 07/2016 Project.: TRAINING IN GRID MAINTENANCE ON EHV HOT LINE WITH TOOLS -4 MONTHS - $3.2 Millions Location: Riyadh,Saudi Arabia

Client. : NATIONAL GRID -SEC COA-KSA

Position.: Project Manager – Electrical

380 KV OHTL NORTH RING- POWER PLANT PP9 TO PP11 02/2014 – 06/2016 Project.: Construction of 380 KV OHTL & OPGW between Power Plant PP-9 to PP-11 - 143 Miles - 75 Millions Location: Riyadh, Saudi Arabia

Client. : Saudi Electrical Company-KSA

Position.: Associate/Project Manager – Electrical (International Projects) 380 KV OHTL BETWEEN 9023 S/S & 9027S/S 08/2014 – 01/2016 Project.: Construction of 380 KV OHTL & OPGW & XLPE works between 9023 S/S & 9027S/S- 15 Miles -$10 Millions Location: Al-Kharj, Riyadh, Saudi Arabia

Client. : Saudi Electrical Company-KSA

Position.: Associate/Project Manager – Electrical (International Projects) CONSTRUCTION OF HDD DRILLING FOR XLPE CABLE LAYING &DUCTS 02/2015 – 05/2015 Project.: Construction of HDD at Highway & GAS/OIL Pipe line crossing and Power cable laying to tunnel.- $150,000 Location: Al-Kharj, Riyadh, Saudi Arabia

Client. : Saudi Electrical Company, NGDC & MOWAH-KSA Position.: Project Manager – Electrical (International Projects) EXTENSION OF 225/33 KV EXISTING SUBSTATION 08/2013 – 02/2014 Project.: Construction of 225/33 KV Substation Extension. $25 Millions Location: LABOA, Republic of Côte d'Ivoire

Client. : Ministry of Power & Mines -Republic of Côte d'Ivoire Position.: Associate Manager – Engineering Design& Quality Control (International Projects) CONSTRUCTION OF 138 KV/69 KV & 230 KV/138 KV SUBSTATIONS AT CEBU & COLON 05/2012 – 08/2013 Project.: Construction of 138 KV/69 KV & 230 KV/138 KV substations at Cebu & Colon. $55 Millions Location: Colon & Cebu Philippines.

Client. : National Grid Corporation-Philippines.

Position.: Graduate Management Trainee-Project Coordinator – (International Projects)



Contact this candidate