N. SankarKumar
**************@*****.***
Mobile No:+91-709*******
Professional Summary
• Instrument Engineer responsible for Oil&Gas Instrumentation engineering
• Document preparation ITP, QAP,Procedure for all instrument activites.
• Erection and Commissioning for Level Instrument, Pressure Instrument,Valves, Sensors, Impulse piping, control room panels,Pre-commissioning and commissioning activities. Project 1: 6 No’s of C2+liquid Storage Tank [From July2013 to Dec2014] Client: Brahmaputra Crackers and Polymer Limited, Assam PMC: Engineers India Limited
Designation: Instrumentation Engineer
Responsibility:
scheduling of Instrumentation Activities
Calibration and Installation of pressure transmitter, Pressure Gauge, Level Transmitter.
Cables laying and cable termination of instruments.
Installation Impulse hookup line. Installation Impulse hookup line.
Loop drawing and loop checking of instruments.
Instrument cable termination & continuity checking at both instrument sides & field junction box sides in accordance with the designed drawings.
Erection and Commissioning for 6 No’s deluge valve (150NB) Project2:1 No of Deaerator[From July 2013 to Dec2014] Client: Brahmaputra Crackers and Polymer Limited, Assam PMC: Engineers India Limited
Designation: Instrumentation Engineer
Responsibility:
scheduling of Instrumentation Activities
Calibration and Installation of instruments (Level transmitter, Level Gauge).
Cables laying and cable termination of instruments.
Installation Impulse hookup line.
Loop drawing and loop checking of instruments.
Instrument cable termination & continuity checking at both instrument sides & field junction box sides in accordance with the designed drawings. Project3:1 No of Nitrogen Gas Holder[From July 2013 to Dec2014] Client:Numligarh Refinery Limited, Assam
PMC: Engineers India Limited
Designation: Instrumentation Engineer
Responsibility:
scheduling of Instrumentation Activities
Calibration and installation of instruments ( Level Transmitter, Level Sensor, Rotor Operated Valve)
main and secondary cable tray
Cables laying and cable termination of instruments.
Installation Impulse hookup line and Loop drawing and loop checking of instruments.
Instrument cable termination & continuity checking at both instrument sides & field junction box sides in accordance with the designed drawings. PProject4: Oil Storage Terminal, 48 No’s of Storage Tank (Janaury2015 to june2017) Client: Gulf Petrochem (I) Pvt Ltd
Designation: Instrumentation Engineer
Responsibility:
scheduling of Instrumentation Activities
Calibration and Installation for pressure transmitter, Temperature Transmitter, Pressure Gauge, Temperature Gauge, pressure Safety Valve, Level Switch High,Radar Level Transmitter, Temperature Element, Pressure Switch, PD Meter, Batch Controller.
Fire Alarm System for Control room and Storage tank Area.
Control Room Panels Erection and Commissioning
Installation, testing and commissioning of public addressable system in terminal.
Installation Impulse hookup line for all instruments. Loop drawing and loop checking of instruments.
Instrument cable termination & continuity checking at both instrument sides, field junction box sides and Control Panel sides in accordance with the designed drawings. Project5:2No's Double Wall LPG StorageTerminal(july 2017 to at present) Client:BharatPetrolieumCorporationLimited
Designation:Deputy manger
Responsibility:
schedulingofInstrumentationActivities
Prepare ITP, QAP, Procedure for instrument activities as per EIL Standard
CalibrationandInstallationforpressuretransmitter,TemperatureTransmitter, PressureGauge,TemperatureGauge,pressureSafetyValve,RadarLevelTransmitter, Temperature Element, Pressure Switch,
Fire Alarm System and public addressable system for terminal.
Installation Impulse hookup line for all instruments. Loop drawing and loop checking of instruments.
Instrument cable termination & continuity checking at both instrument sides, field junction box sides and Control Panel sides in accordance with the design drawings.
Erection and installation of 6 No’s In tank pump in storage tank (Make : EBARA CORPORATION –USA)
Monitoring, testing and commissioning of product leakage in tank using of fiber optic leak monitoring system .(Make:YOKOGAWA INDIA LIMITED)
Cathodic production system of 416 no’s RCC foundation piles Education
DIPLOMA in Electronics and Communication Engineering, DOTE, Chennai2008.
B.E in Instrumentation &Control, Anna University, Tirunelveli 2011. PERSONAL DETAILS
Name : SANKAR KUMAR.N
Father's Name. : NAGENDRAN
D.O.B : 04/06/1988
Language Known : Tamil, Kannada,Hindi
Present Address : D.No:8, M.D.R. 7th
Street, chockalingapuram
Aruppukottai, Virdhunagar district,
TAMILNADU, INDIA
Permanent Address : D.No:151, North Car Street, chockalingapuram Aruppukottai, Virdhunagar district-626101
TAMILNADU, INDIA