SEEKING ENTRY-LEVEL FULL-TIME POSITION WITH INTEREST IN THE ROLES OF
CONSTRUCTION FIELD/PROJECT ENGINEER, COST ESTIMATOR & COST ANALYST. PROFESSIONAL EXPERIENCE
TECHNICAL SKILLS
MS CONSTRUCTION MANAGEMENT
Texas A&M University GPA 3.25
College Station, TX 2018-2020
BE CIVIL ENGINEERING
University of Pune GPA 3.7
Pune, IN 2013 – 2017
PROFILE
HARSHAL SANJAY
GHUGE, M.S.
Scheduling & Quantity Take-Offs
Document Control; CO, RFP, RFI
Subcontractor Management
Cost/Performance Tracking
Resource Planning
Project Phase Execution, Closeout
Professional Communicator
Quick learner, with a positive attitude, focus
on safety and time management. Reliable &
down to earth individual, proficient in
design, analysis, testing, engineering
processes, and procedures combined with
proven expertise in quality control. Excellent
in field supervision, schedule & resource
planning, cost management, inventory
control using critical thinking & problem
solving. Adept at multitasking able to bring a
high volume of project tasks to completion
with accuracy and professionalism.
FIELD ENGINEER
Jaikumar Construction LLP / Nashik, IN / Jan 2018 – June 2018 Project : Parksyde Homes/High Rise Multifamily/(approx. 20mil) – 1000 Units
Prepared work plans and documented daily progress to ensure quality performance and scheduling requirements were met on the Parksyde Homes, Phase 4A which involved Construction of 5 Building Blocks, 240 Units, RCC, Stilt +12 Floors.
Prepared & Assisted Senior Site Engineer with RFIs, submittals, punch list, office reports, weekly progress reports for RCC and Finishing work of the residential towers.
Worked alongside QA representative inspecting construction work and performing material testing. Coordinating closely with the inventory manager, ensuring products comply with legal standards and quality.
SITE ENGINEER
Suyojit Infrastructure Pvt. Ltd. / Nashik, IN / August 2017 – December 2017 Project : Viridian Vallis/High Rise Retail & Multi-Family/(approx. 25mil) – 3000 Units
Served as a site engineer for civil and structural construction on Viridian Vallis, Phase 1 which involved 6 Buildings, 11 Row Villas. Monitored work being performed by field crew on soil excavation, pile foundation & RCC work up until basement and plinth.
Worked with lead to become efficient in reviewing and executing different types of work packages. Maintained quality log, tracking list/logs of materials ordered/delivered.
Analyzed and reported on schedule performance including earned value management, labor rate tracking, cash flow analysis, trend analysis and projections. BRACKENRIDGE PARKING GARAGE, SAN ANTONIO, TEXAS
Performed quantity takeoff using OST and Prepared a contractor’s bid estimate following CSI Master divisions and standard bid sheet format. FIRE STATION PROJECT, TEXAS
Developed a cost/resource loaded master schedule, estimated impact of change orders on project schedule, identified optimum path for crashed schedules using MS Project. SH-225 AT BW8 PROJECT, HOUSTON, TEXAS
Generated a feasibility analysis report with zero-financing and debt-financing models considering NPV, IRR, ROE, Payback Period, and Profit Margins as deciding factors. 979-***-****
adig50@r.postjobfree.com
San Jose, CA - 95112
Linkedin.com/in/harshalghuge
GRADUATE SCHOLARSHIP
COSC Department/ 2018 - 2019
JUNIOR FELLOWSHIP
O.N. Mitchell / 2019 - 2020
COMPUTER-AIDED DESIGN
Autodesk Revit, Building Information Modelling,
AutoCAD, E-Quest, Navisworks
PLANNING & SCHEDULING
Primavera P6, Microsoft Project, Look Ahead
Schedule, Resource Loading Master Schedule
HONORS
PROJECT MANAGEMENT
Prolog, Resource Management, Work
Packages, Budgeting, WBS, IPD, DB, CMR
OTHER SOFTWARE
Procore -PM, BIM360, Bluebeam, PlanGrid,
QuickBooks, Sketchup, MS Excel, OST
EDUCATION
EXPERTISE RELEVANT COURSEWORK