BRIAN CONNER
**** *. ****** ****** **. Boise, ID 8371 Cell: 208-***-**** adifla@r.postjobfree.com Highly experienced Construction Manager/Superintendent and Estimator with a 25+ year record of success pre- construction negotiations, estimating and overseeing all phases of multimillion-dollar construction, infrastructure, and projects for private-sector clients and government.
Owner, Architect & Vendor Relations
Bid Package Preparation/RPF /Estimating
Review & Process Submittal Packages.
Project Scheduling
Budgeting & Cost Controls
Subcontractor/Crew Supervision
QA/QC Field Engineering
Process/Prepare Pay Applications
Professional Experience
Rennison Construction, Inc., Boise, ID
Construction Manager & Superintendent
Key projects:
The Cove at Eagle Lakes, Eagle, ID: Oversee operations for infrastructure of large subdivision for high- end homes and town homes including potable water distribution, sewer, power, fiber, irrigation distribution, storm drainage, site concrete, paving and continued into construction of buildings such as gateway entrance, pool house and town homes.
Eagle Lakes Office Complex, Eagle, ID: construction of a 30,000 sf 2-story core and shell office building with 5,050 sf medical TI. Concurrent construction of Building ‘E’, a 22,000 sf 2-story office building with a 9,000 sf TI. Includes all civil site work.
Eagle Lakes Retail, Eagle, ID: concurrent construction of Building ‘A’, a new 2,000 sf wine bar/coffee shop with complete finishes. Construction of Building ‘B’ an 8,000 sf multi-tenant retail space. Includes all civil site work.
Micron Construction, Boise, ID
Project Lead 2016-2017
Responsible for reviewing plans, layout and coordinating installation of equipment to fabricate wafers used in the semiconductor industry.
Agri-Service, Twin Falls, ID 2013-2015
Project Manager/Superintendent
Managed 30,000 SF Corporate Office Building with 18+acres of site improvements. Site improvements included new deceleration lane in ITD right-of-way, new roads, realignment or irrigation canals, and mass grading. New building constructed of steel, with polished concrete slabs in showroom, offices on second floor area and bridge cranes located in shop areas.
Conner Construction, Hailey and Twin Falls, ID
Owner/Operator
2008 – 2013
Managed complete company operations as General Contractor, including sales and actively building. Inspection processes, maintaining safety and cleanliness on the job. Emphasis on concrete, carpentry and drywall installation and finishing but also includes managing and completing residential renovation projects as well as ground up new construction. Several projects include new additions and renovations. Job duties include, site inspections, design and planning, bid preparation and calculating estimates and proposals, building material acquisition, multitasking multiple jobs, blueprint analysis, and project cost forecasting.
2005-2009
Young Construction, Inc., Ketchum, ID
Project Manager
Key projects:
Power Engineers’ New Office Building, Hailey, ID: 27,000 sf office building constructed with CIP concrete, CMU, steel framing, bar joists, metal pan deck, slab-on-deck, slab-on-grade, and all associated site work.
The Club at Copper Ranch, Hailey, ID: 20,000 sf health club constructed with CIP concrete, Durisol block, steel and wood structural members (construction delayed). Thornton Oliver Keller, Boise, ID
Construction Manager/Owner’s Representative
2003-2005
Key projects:
The Family Center: construction of several new “big-box” buildings located on Federal Way, Boise, ID.
New 29,000 sf concrete tilt-up warehouse located off Federal Way, Boise, ID.
Various remodels / tenant improvements located in Boise, ID. RSCI, Meridian, ID
Project Manager/Project Superintendent
1995-2003
Key projects:
Boise State University Student Recreation Center, Boise, ID: new 95,000 sf recreation facility constructed with architectural CIP concrete, pre-cast concrete, CMU, brick, steel. Indoor architectural CIP running track suspended over (3) regulation basketball courts; (4) racquetball courts, weight rooms, aerobics rooms.
Squad Ops / Aerial Port Facility / Apache Command Center, Gowen Field, ID: work consisted of (3) new buildings totaling 93,000 sf. Buildings were constructed with CIP concrete, slab-on-grade, steel moment frame, CMU, brick veneer.
Turbo Air aircraft maintenance hangar. Construction of new aircraft hangar on Boise Air Terminal field, Boise, Idaho
Norco West Mall. Construction of one (1) 18,000 sf stand-alone facility for Norco Medical Supply with adjacent 45,000 strip mall including all site work and county sewer and road upgrades.
C130 Prop Shop, Gowen Field, ID: work consisted of new building totaling 19,000 sf. Buildings were constructed with CIP concrete, slab-on-grade, steel moment frame, CMU, brick veneer, pre-cast concrete.
In-Flight Service, Mountain Home, ID: work consisted of 9,200 sf. remodel.
State of Oregon Correctional Institution, Ontario, Oregon. Layout, forming and placement of CIP concrete on (5) new corrections buildings.
Education, Training & Certifications
Boise State University, Boise, ID 2001-2002
Adjunct Professor, College of Engineering, School of Construction Management Teaching Construction & Construction Science
Idaho Construction Leadership Academy, Associated General Contractors 2000 Graduate
Boise State University 1993-1998
BS Business Administration
United States Marine Corps 1982-1988
Boise High School 1981
General Education
OSHA 10 Hr. Class, First Aid/CPR
Software:
Word Excel Outlook Procore Primavera P5 MS Project Procore Bluebeam Adobe Professional