Personal Summary:

WORK EXPERIENCES

• Undertake regular inspection to ascertain that work is being undertaken in accordance with the contract, approved plans and project specifications.

• Involved in Earth works, Foundations, Pipe sleepers, Pole Foundations, Pipe Protection, Manholes, Crossing Ducts, Landscaping and Steel Structure, Etc.

• Oversee all new access roads including underground facilities being installed onsite. Including all radius added to existing roads. All cement stabilization recorded and checked to stay in compliance with specification standards.

• All excavations checked for correct size and bottoms checked for load bearing in accordance with specifications in original plans.

• Final checks of all rebar to ensure proper size and spacing with original specifications of engineered blueprints.

• Oversee all concrete pours and tests run on concrete to ensure it is kept in the guidelines of standard specifications. Processes of slump test, air test, water consistency, amount of vibration used, and time between loads brought from batch plant.

• All foundations checked prior to backfill for any discrepancies in concrete. Cracks or large air pockets that would need addressing before covered.

• Manage all backfill procedures so that they are carried out in the manner one-foot lifts and compacted so that ground is compacted to the necessary rating needed as per standard specifications.

• Inspected the construction work (Work Inspection Request, Material Inspection Request, Etc.) regularly to ensure that the contractor follows the Standard Specification and the work is done accordingly.

• Reviewed various Submittals (Material, Method Statement, Prequalification, Etc.) of the contractor to ensure that comply with standard specifications.

• Monitor construction throughout the duration of the project to ensure everything is progressing as planned and took photographs of the actual works done at site.

• Coordinated with the contractor to resolve any problems encounter at site.

• Conduct walkthroughs at the end of a project to determine overall quality; over course of employment, found issues with roads & buildings that needed to be rectified immediately.

Knowledge in using AUTOCAD, PRIMAVERA

P6 Software.

Computer literate

Ability to motivate multidisciplinary team

Knowledge and understanding of

construction management.

Preparing and delivering briefing to staff on

technical

Delivering projects to the required quality,

timeline and budget.

Coordination skills to allow every member of

the team to be utilized properly.

Knowledge of basic mathematical principles

to determine what overall budget needs to

be for a project to be done correctly.

Character References

Available upon request.

• Certificate of Appreciation for the Civil &

Building Conducted Best Employee given by

Doosan Heavy Industries & Construction Co.

Ltd. for the Ras Al Khair Phase – 1 Package

“D” Desalination Plant Project.

• Certificate of Project Completion given by

Assad Said for Cont. Co. Ltd. for General

Electric Manufacturing Technology Center

Project.

INTERESTS & HOBBIES: Construction, Supervising,

Quality Control, Planning, Sports.

WORK ATTITUDE: Hard – working, Reliable,

Open minded, highly – motivated.

EDUCATION: BS Civil Engineering –

St. Anthony’s College, 2005.

MARITAL STATUS: Married

AGE: 38 years old

LANGUAGES: English, Arabic, Tagalog, Kinaray-a,

Hiligaynon, Ilonggo

Civil Inspector / Material Inspector (March 2019 – February 2020) SALFO AND ASSOCIATES SA - PMC (Abu Dhabi, United Arab Emirates) www.salfo.gr

AFFILIATE ORGANIZATION

Philippine Institute of Civil Engineers, Inc.

(PICE)-UAE Chapter No. 1179

Al Hudayriat Island Project Phase-1, Hudayriat Island, Abu Dhabi, U.A.E. Client: Musanada & Gen. Con.: Six Sigma Middle East Const. LLC www.6sigma-mc.com Al Hudayriat Island Campsite & Infrastructure Project, Hudayriat Island, Abu Dhabi, U.A.E. Client: Modon Properties & Gen. Con.: Hilal Bil Badi Partners Cont. Company www.hilalco.com Etisalat Data Center Project, Al Ain, U.A.E.

Client: Etisalat Group & Gen. Con.: Huawei Tech. Investment Co. Ltd. www.huawei.com Al Hudayriat Island Access Road & Site Wide Development Project, Hudayriat Island, Abu Dhabi, U.A.E. Client: Modon Properties & Gen. Con.: Nael & Bin Harmal Hydroexport www.nbhh.ae Civil Engineer License No. 0106490

HAN L. LABONETE

A flexible, hardworking and highly motivated individual who has a clear understanding of the role and responsibilities associated with being a Civil Engineer/Inspector. Over 14 years of extensive experience and a strong track record of delivering high profile and challenging projects for a broad range of clients throughout the Middle East most specifically in Kingdom of Saudi Arabia & United Arab Emirates. Possesses a broad range of technical, personal effectiveness and leadership skills and uses rigorous logic and methods to come up with effective solutions to difficult problems. Physically fit and able to work on-site and at remote locations, is more than willing to undertake any work of a technical nature that falls within my ability and competence. Someone who can work easily with different kinds of people and very willing to learn new things that will help me become a better person. Currently looking for a suitable position with an ambitious company where he will be working with industry experts, people who have the skills and experience to make a real difference to the future.

Project / Civil Engineer (Estimator/Planning/QAQC/QS Engineer) (April 2015 – March 2019) BIN JUMA AL SUWAIDI GROUP / ADVENT ENG’G.CONSULTANCY LLC (Abu Dhabi, United Arab Emirates) www.bjsgroup.ae & www.advent-ec.ae

Residential Villas for Heirs of Dr. Jauan Salem Al Dhaheri, Al Maqta, Abu Dhabi, U.A.E. Proj. Value of 50,000,000.00 AED 1 Basement & 2 Storey Residential Villas (3 Units) for Salama Al Suwaidi, Abu Dhabi, U.A.E. Proj. Value of 22,000,000.00 AED 1 Basement & 2 Storey Mercure Suite Hotel, Jabeel Hafeet, Al Ain, U.A.E. Proj. Value of 24,000,000.00 AED Residential Villas For Adil Marzouqi,Al Shahama,Abu Dhabi, U.A.E. Proj. Value of 3,000,000.00 AED 2 Storey Dalma Hotel, Dalma Island, Abu Dhabi, U.A.E. Proj. Value of 51,000,000.00 AED

• Leadership skills and the ability to meet deadlines and provide high-quality service to the client.

• Responsible for day to day interaction with client/consultants/sub-contractor’s regarding progress of the work.

• Preparing Detailed Construction Schedule from BOQ using Primavera & MS Project software and assist in preparation of accurate project programs, clearly indicate the timeframes and activities involved in the project and monitor progress against the project plan taking corrective action where required through effective coordination with the client, various type of sub-contractors, etc.

• Conduct quality checks and complete quality check list with the QC Inspector, on works carried out to ensure that the project meets the specifications.

• Supervise and ensure adherence to QA/QC and HSE policies to ensure quality and guarantee safe and healthy work place.

• Monitoring the Whole Activities of the Projects.

• Ensure that all materials incorporated into permanent construction follow the contract requirements.

• Responsible to implement, monitor and document the QA / QC activities as per the established Inspection & Test Plans

(ITPs) and Quality Control Procedures (QCPs) narrated in the Project QA / QC Plan.

• Reviewing Material Submittals, Method Statements, RFI’s and Sub-contractor’s Prequalification in compliance with Project Specification & Contract Documents.

• Raised Non-Conformance Report (NCR) and Site Observation Report (SOR), once the activities are deviated from the Contract Specifications or normal construction practices.

• Checking Invoice/Billing on the Sub-Contractors.

• Request all materials needed on site until the project completed.

• Prepared status report about the daily in the site work, weekly progress, & monthly reports for management.

• Calculates various statistical data such as quantity take-offs, material price lists, labor costs per man-hour, and equipment’s needed to carry out the project as per design drawings, specifications and meeting planned dates in schedule with the client & management.

• Organize and manage the workforce, supervise the site and keep the PM updated on the progress of the project, attend to all technical and engineering problems and drawing change in an effective and timely manner.

• Execute issued snag list from the consultants, oversee contractors for various works and monitor all jobs for timely completion and compliance.

• Supervise the site regularly, keep the client updated on the progress of the project and attend to all technical and engineering problems, additional manpower requirements, drawing changes, etc. in an effective and timely manner thereby achieving project requirements and quality standard.

• Ensure that all materials incorporated into permanent construction follow the contract requirements.

• Monitoring the Whole Work Activities of the Projects such as Precast Elements delivery and Installation, concrete, blocks, steel structure, rebar, earthworks, landscaping and finishes of the projects.

• Provide assistance to project manager and supervise office engineering construction.

• Collates and studies survey reports, maps, drawings, blueprints, aerial photographs and other data required for construction projects.

• Reviewed drawings and made necessary modifications in the soft copy (AutoCAD) as suggested by the manager and discussed the changes with the client.

• Conducts tests on materials and soil to determine their quality and if present status can support design and development specifications.

Civil Engineer / Field Engineer (March 2014 – April 2015) SEOYONG CONSTRUCTION CORPORATION, LTD. (Abu Dhabi, United Arab Emirates) www.seoyong.com

• Mark out the site, makes sure designs are applied correctly and liaise with main and sub-contractors and the site manager

• Act as day-to-day managers on a construction site, and the main source of technical advice and quality control for everyone working on it.

• Checked the drawings and quantities to ensure the accuracy of calculations.

• Resolve technical or any other problems crop up in the site.

• Plan the work to be done and organize things so that deadlines are met.

• Check all materials and equipment’s available in day to day operations

• Supervise the site regularly and ensure adherence to QA/QC and HSE policies to ensure quality and guarantee safe and healthy work place.

• Arrange sub-contractors for various works, equipment to be used and monitor all works for timely completion so that the deadlines are met.

• Conduct quality check and complete quality checklist with the QC Inspector at site, on works carried out to ensure that the project meets the specifications.

• Organizing materials and ensuring sites are safe and clean.

• Preparing cost estimates and ensuring appropriate materials and tools are available.

• Providing technical advice and suggestions for improvement on particular projects. Field Monitoring Engineer / Civil Site Engineer (August 2008 – March 2014) ASSAD SAID FOR CONTRACTING CORP., LTD / GROUP OF COMPANIES. (Riyadh, Saudi Arabia) www.assadsaid.com

Ras Al Khair Phase–1 Package “D” Power & Desalination Plant Project, Jubail, K.S.A. Proj. Value of 59,496,051.00 USD Client: Saline Water Conversion Corp. & Gen. Con.: Doosan Heavy Industries & Const. Corp. Ltd. www.doosanheavy.com Riyadh 2 x 1,750 MW Independent Power Plant 11 Project, Dhurma, K.S.A. Proj. Value of 113,985,437.00 SAR Client: Saudi Electricity Company & Gen. Con.: Hyundai Heavy Industries Corp. Ltd. www.hhi.co.kr General Electric Manufacturing Technology Center Project, Dammam, K.S.A. Proj. Value of 13,118,302.39 USD Client: GE Energy & Gen. Con.: Al – Alalamiah Technical Corp. www.alalamiah.info 380 KV GIS Building Expansion Project s/s 9011, Sudair, K.S.A. Proj. Value of 2,572,944.30 USD Client: Saudi Electricity Company & Gen. Con.: Siemens Arabia Ltd. www.siemens.com.sa Rabigh Desalination and 2 x 660 MW Independent Power Plant Project, Rabigh, K.S.A. Proj. Value of 133,000,000.00 SAR Client: Rabigh Electricity Company & Gen. Con.: SEPCO III Electric Power Const. Corp. www.sepco3.com Reinforcement of Wadi Dawasir Power Plant Project, Wadi Dawasir, K.S.A. Proj. Value of 23,959,000.00 SAR Client: Saudi Electricity Company & Gen. Con.: Al Toukhi Company for Industry Trading & Contracting www.altoukhi.com.sa Riyadh 4 x 120 MW Power Plant 8, Extension III CCPP Project, Riyadh, K.S.A. Proj. Value of 2,241,379.31 USD Client: Saudi Electricity Company & Gen. Con.: Al Toukhi Company for Industry Trading & Contracting www.altoukhi.com.sa

• General and Technical Site supervision of civil works at power sub-stations, including foundations, trenches, control building and associated works.

• Worked with various functions to ensure the project achieves corporate goals set for environmental, safety health, quality, cost, and schedule.

• Prepared reports such as punch lists, RFI and status report about the daily and weekly progress, non – compliance and delay in site work.

• Assigns and actively monitors the construction activities of Civil Workers to ensure that the project remains up to date.

• Utilized computer software such as Excel, Word, Power Point and AutoCAD in preparation of reports to the project.

• Knowledge on Landscaping such as Parking & External Works for Completion of Projects.

• Check all materials and equipment’s available in day to day operations.

• Supervise the site regularly and ensure adherence to QA/QC and HSE policies to ensure quality and guarantee safe and healthy work place.

• Arrange sub-contractors for various works, equipment to be used and monitor all works for timely completion so that the deadlines are met.

• Conduct quality check and complete quality checklist with the QC Inspector at site, on works carried out to ensure that the project meets the specifications.

5,600 MW Barakah Nuclear Power Plant Project (4 APR-1400 Nuclear Reactor), Abu Dhabi, U.A.E. Proj. Value of 32,000,000,000.00 USD Client: Emirates Nuclear Energy Corp. (ENEC) & Gen. Con.: Korea Electric Power Corporation (KEPCO) www.home.kepco.co.kr Sub-Con.: Hyundai Heavy Industries Corp. Ltd. www.hhi.co.kr & Samsung Engineering & Const. Group www.samsungengineering.com Safety Engineer / Civil Site Engineer (September 2005 – August 2007) ALTIS CONSTRUCTION (Manila, Philippines)

• Managed and supervised general labor and workers.

• Met inspectors on site to keep the development process proactive.

• Responsible for survey crew training and scheduling.

• Verified field measurements of survey team for final designs.

• Prepared the cutting list of steelworks and the daily activity reports to senior management.

• Upheld all HSE standards and regulations.

• Completed water pipeline designs to meet customer specifications.

• Resolved all technical problems in engineering blueprints.

• Handle responsibilities of handling projects that cover new pipeline construction, pipeline rehabilitation, and terminal construction.

• Perform tasks of providing detailed project design from conception through completion.

• Tested and Inspected pipeline throughout construction phases and after successful implementation.

• Supervising the work of other engineers.

Pipe Laying Project of Secondary Water Line on Various Expansion Area, Coloong 1, Valenzuela City, Philippines

Gen. Con.: Manila Water Company Inc. www.manilawater.com Construction of Sewerage Treatment Plant Parking Area, Dagat – dagatan, Caloocan City, Philippines

Gen. Con.: Manila Water Company Inc. www.manilawater.com Demolition and Renovation of the West Wing of Robinson’s Galleria, Ortigas, Pasig City, Philippines

Gen. Con.: Metro Stonerich Corporation www.metrostonerich.com Pipe Replacement of Secondary Water Line for Soba Umiray Project Phase 2, Cuneta, Park and Taft Ave., Pasay City, Philippines Gen. Con.: Maynilad Water Services Inc. www.mayniladwater.com.ph

• Managed and supervised the formworks and scaffolding/table form installation of the projects.

• Managed daily project completion and trades coordination.

• Prepared daily activity reports to senior management.

• Coordinated the field activities with design changes and internal scheduling.

• Verified field measurements of survey team for final designs.

• Supervised crews of up to 60 master carpenters and general laborer personnel.

• Defined project scope and deliverables, developed and refined design specifications, created and executed work schedules and ensured compliance with timelines.

• Assigns and schedules shifts of construction workers, employees and/or their supervisors in multiple locations and areas.

• Monitors progress status of projects through daily inspections for the purpose of staying on the project timetable.

• Reviewing reports on labour and productivity performance. 45 Storey Residential / Commercial / Sports Bldg. Victoria De Manila Tower Project, Taft Ave. corner Gen. Malvar Street, Malate, Manila, Philippines Gen. Con.: New San Jose Builders Inc. www.newsanjosebuilders.com.ph 27 Storey Residential Condominium Bldg. Seibu Tower Project at Global City, Fort Bonifacio, Taguig City, Philippines Gen. Con.: CE Construction Corporation www.ce-construction.com 43 Storey High-Rise Condominium McKinley Park Residences Project, 3rd Avenue Corner 31st Street, Fort Bonifacio, Taguig City, Philippines

Gen. Con.: CE Construction Corporation www.ce-construction.com 5 Basements & 8 Storey Bldg. Makati Medical Center new Annex Building Project, Amorsolo Street, Legaspi Village, Makati City, Philippines Gen. Con.: EEI Corporation www.eei.com.ph

Project In Charge / Project Engineer (August 2007 – May 2008) MARATAS NAPAROTA CONSTRUCTION & DEV’T. COMPANY (Manila, Philippines)