TG. DIVAKARAN
E-mail: ************@*****.***
PERSONAL SUMMARY
Electrical Engineer with 11.5 years of experience in Projects & Operations, Highly focused with a broad knowledge in various sectors such as project skills, operations, technical services, soft services, property management. A consistent track record of successfully employing best business practices that improve efficiency, reduce implementation / operating costs whilst increasing productivity. Easy going by nature and able to get along with both work colleagues and senior managers, currently looking for a suitable manager Position.
KEY SKILLS
FACILITY/PROPERTY MANAGEMENT - MEPC PROJECTS - RESOURCE PLANNING - TRANSFORMER & DG ERECTION, HT PROJECTS - CHILLER ERECTION - ENERGY SAVINGS / AUDITS - DATA CENTER PROJECTS / OPERATIONS - STATERGY – SOFT SERVICE - BUDGET ALLOCATION - COST MANAGEMENT – VENDOR MANAGEMENT – COMPLIANCE
WORK EXPERIENCE
OYO, Nov 2018 To Present
Designation - Manager, Engineering Services
Responsibility - Repair & Maintenance, MEPC Projects, Focusing on operations, Vendor management, Budget allocation, Strategy planning.
CBRE SOUTH ASIA (I) PVT LTD, Sep 2014 TO Nov 2018
FACILITY OFFICER - Maintaining 500000 SQ FT facility area – Technical
(Transformer, DG, UPS, Breakers, HVAC, Fire Fighting Systems, Sewage Treatment
Plant, DATA CENTER, BMS, Etc). MEPC Projects, HVAC projects, Data center operations. Non - Technical (Housekeeping, Gardening, Security, Transport, Key Management, Space management, Cafeteria Management, Event Management, Statutory Documents)
RELIANCE RETAIL LTD, Oct 2013 TO Aug 2014
Deputy Manager – Electrification Projects, Facility management, Technical & Soft skills, Vendor management, Energy savings, Audits for 150 retail stores in Tamil Nadu.
CBRE SOUTH ASIA (I) PVT LTD, Aug 2012 TO Oct 2013
FACILITY EXECUTIVE - Handling Electromechanical and soft skills, Implementing Energy Audits and Energy Savings.
EMERSON NETWORK POWER (I) PVT LTD., (Oct 2010 to July 2012)
PROJECT ENGINEER – Data Center Projects, Installation and Commissioning of UPS, Transformer, Precession Air, Conditioning Unit, Server Racks, Fire Alarm System, CCTV, VESDA, WLD, Biometric, Access Control, Etc.
WELLINGDON CHARITABLE TRUST. (June 2009 to Oct 2010.)
Project Engineer – MEP Projects, Erection and commissioning of Transformer, Generators, Fire Protection, HVAC, LIFT, STP, BMS, Etc.
LEADERSHIP AND COMPETENCIES
OPERATIONS & MAINTENANCE
Facility management: Electrical, HVAC, BMS, FFE, Civil projects, Soft Skills, Landscaping etc.
Responsible for Planning & co-ordination of MEP services Monitoring, Quality & Safety for Electrical & Fire detection, Firefighting, HVAC system.
Chiller/ AHU/PAC units LCR projects.
UPS, DG, Pumps, STP LCR projects.
Assist in carrying out renovation and remodel projects within the facility.
Contract Management & Co-ordination with Project Team.
Responsible for Data Center & HUB operations, critical infrastructure - PAC, UPS, FM200, VESDA, WLD, FAS, RR. Ensuring zero down time.
Data Center - Event / Incident / Change management
Handling Statutory documents for audits - Rule 30, Fire licence, Lift Licence, Hazardous waste, Etc.
Inspection of Transformer, DG sets, HT panel, LT panel, rising main unit, Bus duct at Manufacturer work place.
Performed routine maintenance inspections of equipment to identify and respond to problems in a timely manner, thus preventing breakdowns.
Utilized different reliability and testing strategies in plants to maintain and improve operation’s profitability.
Developing of standard maintenance & Operation procedure to increase the efficiency of Electrical Equipment’s/Systems, and reduce Breakdown Maintenance.
Contract Management & Co-ordination with Project Team.
Responsible for coordinating with Government authorities for CEIG Inspection, Lift, Fire, Air & Water consents license renewal.
Conducting adequacy audit of the entire property with respect to the best standards of facility / property management and highlight the pending / incomplete / snag / unsafe / other defective works and facilitate getting things right in the stipulated time and cost.
Performed routine maintenance inspections of equipment to identify and respond to problems in a timely manner and initiating LCR.
Identify energy saving measures and the budget implement those which are cost effective and good “ROI”.
Provide administrative support, as needed including processing work orders, invoice processing and tracking of engineering, preventive maintenance and safety records.
Responsible for inventory spare maintenance for single point of failure.
Prepare MIS / Credit 360 Reports and summarize data as and when required.
Assist with Safety and Security including evacuation procedures, disaster recovery, and security monitoring equipment.
Cafeteria management, Event management, Transport management
Facility Management in Hotel and Retail Industries for R&M, with 0% UH feedback.
Facility management: Housekeeping, Security, Transport management, mail room management, etc.
Provide Client requirements and Support to all facilities employees and teams regarding day to day operations.
Keeping senior management informed of all changes in my areas of responsibility.
Responsible to ensure efficient management of assets – Managed, maintained and supported the reliability of the systems, equipment, properties and assets in the facility.
Assist with Safety and Security including evacuation procedures, disaster recovery, and security monitoring equipment.
Provide day to day operations and support to include general repairs, mechanical, electrical, plumbing, fire suppression, and generator and UPS, alarm monitoring, AV equipment furniture and locksmith services.
Provide administrative support, as needed including processing work orders, invoice processing and tracking of engineering, preventive maintenance and safety records.
Provided solutions and fixed equipment malfunctioning, system faults– Used root-cause-failure techniques, corrective actions, modifications and performed replacements and/or new installation.
Responsibility of maintaining and controlling operation teams –
Electromechanical, House Keeping, Security, Transport, Cafeteria.
PROJECTS
Responsible for managing staff, delegating tasks to team members, monitoring resources and overseeing the full scope of work until project completion.
Responsible for coordinating with vendors and supervised subcontractors during projects to ensure proper completion of work performed at customers’ facilities.
Co-ordinate for site progress review meeting with Service consultant, Architects, Design team with Execution team at site to resolve the Design related issue.
Erection, Testing and Commissioning of 11/33 KVA Transformer.
HT Erection, Testing & Commissioning.
MEP work Coordination & Review of electrical load calculation & electrical distribution scheme.
Responsible for coordinating with vendors and supervised subcontractors during projects to ensure proper completion of work performed at customers’ facilities.
Responsible for total Project and Capex Purchase in discussion with Project / Production / Engg. dept.
Coordinating with design team as per the requirement
Validation of BOQ & estimate, Quantities extract from drawings and checking/verifications of contractor’s bills etc.
Responsible for complete project execution such as cost, schedule and quality from initial preparation stage until complete handover.
Responsible for activity’s like resource planning and motivating a project team.
Responsible for cost control, Time management and updating the progress to the top management.
EDUCATIONAL QUALIFICATIONS
•Bachelor’s Degree in ELECTRICAL AND ELECTRONICS ENGINEERING – 70 % - ANNA UNIVERSITY 2009.
•12th - 62 % - Chandhabai Pagariya Matric Higher Secondary School - 62 % - 2005
•10th - Chandhabai Pagariya Matric Higher Secondary School - 61% - 2003
PERSONAL DETAILS
DOB - 18.12.1985
Address - 5/1A, Thirupathi Nagar, First Main Road, Kolathur,
Chennai – 600099.
DECLARATION
I do hereby declare that the particulars of information and fact stated herein above are true correct and complete to the best of my knowledge and belief.
PLACE: CHENNAI
DATE: DIVAKARAN T.G