VELU PALANI

PRODUCTION ENGINEER

REACH ME

+919*********

***********@*****.***

https://rb.gy/dz8tej

Thiruvannamalai,

Tamil Nadu

Result-oriented individual with rich 9 years

experience.

Manufacturing Industrial Production

Assembly Continuous improvement

Team management

YOU MUST KNOW

Manufacturing engineering in Auto

Ancillary & Electronic Industries

Process Enhancement, Cost and

waste reduction.

Sub assembly & production improvement

QA, 4M analysis, LOB, PFMEA, 5WHY

Kaizen, Kanban, PRO 3M+, 5S

Shift in-charge & Leadership

Team, equipment, machines, product

handling

SKILLSETS

People management

Automated Conveyer line assembly

EXPERIENCE

Nov ' 18-Present

Mar'13-Nov'18

Apr ' 12-Mar'13

Feb' 11-Feb' 12

EDUCATION

PRODUCTION ENGINEER

Flextronics TechnologiesIndia

Pvt. Ltd, Chennai -EMS

Production & Manufacturing

SENIOR ASSOCIATE

Samsung India Electronic Pvt.

Ltd, Chennai- Home

Appliances

Production & Manufacturing

PROJECT ENGINEER

Shiram SEPL Composites Pvt.

Ltd, Chennai- GRP pipe

Manufacturing

Project &Production

ENGINEER TRAINEE

TVS Sundaram Fasteners Pvt. Ltd,

Hosur -Automotive

Production

Intelligent automation& assembly line

Production defects &loss check

Product quality and targets

Presentation & communication

Lean Six Sigma tools

Selecting and develop the right people

MS office, SAP-MM, Tact Time, Cycle time

Management, Line of balance algorithms

BE MECHANICAL ENGINEERING

Arunai Engineering College,

Tiruvannamalai

75%

HIGHER SECONDARY (HSC)

Joseph Boys Higher Sec.

School, Tiruvannamalai

71%

SSLC

Government High School,

Namathodu

82%

2010

2006

2004

PROJECTS &

IMPLEMENTATIONS

DETAILED RESPONSIBILITY

PRODUCTIVITY IMPROVEMENT

Reduction cell cycle time & 5

Man power/Shift. Conveyer automation.

DOOR FOAMING, SUB ASSEMBLY

Sub assembly defect reduction by

20% by 4M method

PRODUCTIVITY, OVERHEAD

REDUCTION

Redesigned floor layout, process.

Increased volume & standard of

product

GRP PIPE ERECTION

4 X 300 thermal power plant

OPERATION JUGGERNAUT

1st place at operation juggernaut at

door foaming line

LANGUAGES

English

Tamil

Hindi

Kannada

PERSONAL INFO

Born on 3rd April 1989

Married

Adapt easily to situation

Team leader

Positive attitude,Go-getter

Reliability and consistency

Quick learner

REFERENCES

Will be provided if needed

I DECLARE,

All the particulars made in application are

true to the best of my knowledge

and belief.

Flextronics Technologies India Pvt. Ltd, Chennai

Responsible for total operations with accountability for Production Targets, Meeting, Delivery Date, Productivity, Quality & Manpower management.

Ensures allocation of jobs as per schedule, follow up by feedbacks in backend assembly line

Good exposure in Manpower handling by regular

Inter actions and day to day resolving related matters. Optimizing man & machine utilization to achieve preset production targets of Huawei Mobile assembly & iPhone Apple mobile adapter manufacturing

Samsung India Electronic Pvt. Ltd, Chennai

Analysis of process defect, scrap analysis and on- time loss Line Cycle time study, Allocation of new process, monthly LOB improvement, Line process to reduce the neck time in cell line Implementation of Low-Cost Intelligent Automations to Reduce Operator fatigue, poke- yoke implementation, Manpower reduction & team handling, man & machine scheduling Implementations of new process through line trial for new product launch coordinating with R&D dept-1&2Door Refrigerator assembly Preparing PFMEA before new model implementation & Implemented REBA projects bin lifters tape dispensers, small automations. Conducting 4M, 5WHY, Joint wise Pareto analysis for daily Brazing & performance defect reported in GMES system & Scrap analysis finding the root cause and taking corrective action. Responsible for layout design and modification & optimizing main line assembly, Block cell line & Sub assy process includes brazing, Lokring, Pinch off operation, Gas leak testing (CTQ),Door foaming line. Shiram SEPL Composites Pvt. Ltd, Chennai

Hands on experience in Erection & Commissioning of GRP Pipe line in 4*300 MW thermal power plants for sea water intake at Ratnagiri, Maharashtra.

Hands on experience in Erection of Pipe fittings- Butt wrap joint, Bell & Spigot joint, Tee joint, flanges & hydro testing for water leakage in pipe line flow in ETE.

Coordination among Erection,Maintenance,Site management, Improvement Projects, Customer Co- ordination, and Strong technical Capabilities.

TVS Sundaram Fasteners Pvt. Ltd, Hosur

Supporting line production with design & implementation of new Jig & fixtures for easier operation and defect prevention Hands on experience in CNC & VMC Machine line in charge for one shift – Manufacturing in Wheel Hub & Stub Axle products for OEM Volkswagen.

Maintaining Critical spares (Purchase, Maintenance & Stock management) for CTQ process as per the production

Requirement.

Maintaining WI, Work standard, Control plan, document display as per process change.



Contact this candidate