Glenn A. Hablero, RME # *******
Molino *, Bacoor City, Cavite, Philippines
****-906-***-**** 0063-995-1461-728 *********@*****.*** *********@*******.***
Oil &Gas Industry Professional
Construction Superintendent/Supervisor
“Quest for a next level of career success in Oil & Gas field as Piping/Mechanical Supervisor within a well reputed firm to enhance analytical knowledge and expertise gained in previous positions in order to contribute in organisation efficiency and productivity”
“A Recognized Expert in Construction & Project Management, Experienced in All Aspects of Construction Engineering /Superintendent Services”
Highly accomplished and results driven Construction Supervisor/Superintendent, offering 25 years of experience in execution of early works, onshore piping, mechanical rotating, static, package equipment, API Tanks, structural and civil/electrical and instrumentation interface discipline, constructability review, pre-commissioning/commissioning & maintenance support within Upstream/Downstream Oil, Gas, Chemical, Power Generation, Utilities and Offsite Project.
Expertise and fully involved in Brownfield, Greenfield/Grassroots, and Turnaround/shutdown environment within EPC, EPCM and PMC contract.
Efficient project and constructions management abilities to coordinate and follow up construction schedule, progress review, engineering deliverables, bulk material management, quality control, safety and cost-effective project.
Highly experienced in implementation of shop pipe fabrication, pressure testing & cleaning, execution of NDE activities & steel structure stick built, Pre-assembled Unit & Pre-assembled Piperack module installation.
Expertise in executing Heavy lifting/Rigging & erection of Mechanical Rotating, Static & Package Equipment such as Compressors, pumps, blowers, fans, turbine, columns, vessels, heat exchangers, Field Erected boilers, HRSG, Heater, Furnace, Reformer, Flue Gas Treatment plant, HVAC, cooling tower, API tanks fabrication & installation
Proactive team player, demonstrate self-initiative & team building skills, strong leadership & delegation of work to subordinates and mentoring Field Supervisors.
Highlights of Expertise
Piping Fabrication/Installation
Project/Construction Management
Turnaround (TAR) & Shutdown Pipe Tie In Coordinator, Mechanical Equipment Modification
Civil, Electrical & Instrument Interface Discipline
Vendor Relationship Management
Equipment Preservation
Constructability Review
Rotating/Static / Package Equipment Assembly & Erection
Turnover & Pre-Commissioning
Engineering & QA/QC Deliverables Coordination
HSE Implementation Champion
Career Experience
Fluor Kuwait, KOC PMC, EF - 1669 Feed Pipelines for New Refinery Project, Kuwait
Construction Engineer - Mechanical (Piping/Pipeline/Equipment), PMC (May 01, 2019 to July 16, 2020)
Ensure EPC Contractor are complying & following the Company International Standard, Contract, Project/Construction Execution Plan, Method Statement & procedure, and ITP/QCP for the installation of upstream/downstream mechanical equipment, on plot piping, pipeline, pigging facilities, API tankage, piping tie-in in Brownfield & Greenfield area for the KOC/KNPC/KIPIC Feed Pipelines for New Refinery Project.
Successfully reinforced & implemented Health, Safety & Environment program, SAFE work environment & JSA at project site.
Review, comment & controlled EPC contractors schedule vs material status & site installation activities.
Attend & witness equipment performance testing, valve testing, pipe pressure testing and material receiving inspection.
Monitor, controlled & supervise EPC Contractors piping tie in activities from pre-shutdown, isolation, draining, purging, tie-ins and commissioning of the system.
Controlled, issuance & commencement of Permit To Work (PTW) to subcontractor at site.
Fluor Philippines, JG summit Petrochem Offsite, Utilities & Power Generation Project, Batangas, Philippines
Lead Construction Supervisor (Mechanical/Piping), EPCM/PMC (May 2018 to April 2019)
Directly managed & supervise, early works, non-process buildings, all TAR activities, installation of field erected boiler & furnace, API Tanks, (Flat Bottom Tanks, Spherical Tanks), piling, U/G & A/G piping works in Brownfield & Greenfield area for the OSBL stage 1 expansion project of Petrochemical Plant Complex. Temporary Facilities & Early works Lead.
Successfully reinforced & implemented Health, Safety & Environment program and SAFE work environment at project site.
Ensure contractor have the necessary resources (manpower, tools & equipment) to execute available work front to meet project schedule.
Controlled, risk assessment prior to issuance & commencement of Permit To Work to subcontractor at site.
Managed & Delegation of field supervision & execution to Construction Supervisors.
Ensure Contractor’s safety, work & quality are carried out in accordance with execution plan, method statement, job hazard/safety analysis, engineering specification and Inspection Test Plan.
Fluor Daniel Malaysia, Refinery and petrochemical integrated development (RAPID) Project, Offsite Utilities and Infrastructures, Johor, Malaysia
General Superintendent (Civil, Machinery, Piping, Structural), EPCM/PMC (April 2016 to December 2017)
Responsible for overall supervision of steel structure installation, mechanical rotating/static and package equipment & piping installation for Offsite, Utilities, Jetty and Interconnecting Facilities Project.
Successfully reinforced & implemented Health, Safety & Environment program and SAFE work environment at project site.
Constructability & schedule review with Client, Engineering & Subcontractors.
Review and approved contractors Method Statement, Execution Plan, JHA/JSA and procedure.
Managed & Delegation of field supervision & execution to Construction Supervisors.
Participate & support Turnover group as system owner in field joint walk downs of systems for handover to pre-commissioning / commissioning department.
Ensure safety, work & quality are carried out in accordance with execution plan, method statement, job hazard/safety analysis, engineering specification and Inspection Test Plan.
Fluor Daniel Malaysia, BPC Integrated Aroma Ingredients Petrochem Complex Project, Kuantan, Pahang, Malaysia
Mechanical Superintendent – Mechanical (Static/Package Equipment), EPCM (Jan 2015 to March 2016)
Leading all the planning of heavy lifting and logistics activities, piping fabrication & site piping installation, tie-ins & field erected boiler, HRSG, furnace, gas compressors installation in brownfield and greenfield area for two chemical plant project.
Successfully reinforced & implemented Health, Safety & Environment program at project site.
Organise the punch list and systems walk down related to civil, piping & mechanical & package equipment.
Follow up & manage all contractors deliverables during the entire cycle of site execution such as IFC drawings, Engineering issues, QA/QC inspection requirement, bulk materials & all HSE site requirements.
Managed & Delegation of field supervision & execution to Construction Supervisors.
Fluor Arabia Limited, SADARA – Utilities, offsite & power generation Project, Jubail, K.S.A
Mechanical Package Equipment Superintendent/Pre-Commissioning Support, (Jan 2013 to Oct 2014)
Responsible for overall supervision of Steam Generation Unit project such as heavy lifting coordinator, installation of 6 units Boiler Big Block, Furnace, Flue Gas Treatment package, associated piping and accessories. Lead pre-commissioning activities as construction system and subsystem owner for turnover and punch list close out.
Successfully reinforced & implemented Health, Safety & Environment program at project site.
Facilitate weekly coordination meeting with mechanical subcontractor & equipment vendor discussing issues & work progress.
Work with Project Control in developing and execution of project schedule to meet milestone & commodity dates.
Ensure safety, work & quality are carried out in accordance with execution plan, method statement, job hazard/safety analysis, engineering specification and Inspection Test Plan.
Chevron Geothermal and Power, Tiwi, Albay, Philippines, City
Group Leader – Construction, PMC (Dec 2011 to Dec 2012)
Responsible for overall supervision and implementation of Facilities Engineering & Capital/Operation Expenditure Project (CAPEX/OPEX). Supervised all pipeline installation, turnaround (TAR) construction projects in upstream steam wellhead site & downstream geothermal steam power plant site.
Accomplished the activities of contractors to meet project cost, schedule and quality objectives, and implemented an Operational Excellence Management System (OEMS), CHEVRON WAY culture, IIF and Safety IN Design (SID).
Delivered continuous update of company construction execution plan, procedures, best practices, lessons learned, facilitate weekly construction meetings and lead safety walkthrough & Contractors Performance audits.
Managed & Delegation of field supervision & execution to Construction Supervisors.
Fluor China Engineering & Construction Co., Ltd., BASF-YPC, IPS II Petrochemical Project, Nanjing, China
Construction Engineer/TAR Coordinator (Piping/Mechanical), EPCM/PMC (Sep 2009 to Aug 2011)
Leading all the planning of heavy lifting & logistics activities, preparation & implementation of two major shutdown turnaround (TAR) construction work packages for piping, tie-ins & mechanical rotating & static equipment modification in brownfield area. Responsible for site supervision of piping & mechanical equipment installation of two chemical plant project in greenfield area. Lead systems and subsystems walk down& turnover and project closeout.
Successfully reinforced & implemented Health, Safety & Environment program at project site.
Facilitate weekly coordination meeting with mechanical subcontractor & equipment vendor discussing issues & work progress.
Fluor Mideast, Ltd., RasGas 3 Common Offplot Plot /Boil-Off Gas (BOG) LNG Project, Raslaffan, Qatar
Construction Engineer/Pre-Commissioning Support (Piping/Mechanical), EPCM (April 2007 to Feb 2009)
Responsible for the preparation & implementation of two major shutdown turnaround (TAR) construction work packages for piping tie-ins in LNG/BOG brownfield project. Compliance with PTW systems, permit issuer & SIMOPS coordinator regarding activities related to ISBL (Rasgas) and OSBL (Raslaffan).
Successfully reinforced & implemented Health, Safety & Environment program at project site. Achieved 45 million man-hour without lost time incidents
Supervised shutdown piping tie-in & hot tapping activities, steam blowing, pipeline cleaning, pigging & air blowing activities.
Lead all the supervision & implementation of vendor related activities for Gas Compressor & centrifugal pump installation, alignment, grouting, lube oil flushing and all pre-commissioning works.
Participate & support Turnover group as system owner in field joint walk downs of systems for handover to pre-commissioning / commissioning department.
Saudi Aramco CTS, Khursaniyah (GOSP), Gas-Oil Separation Plant, K.S.A
Construction Superintendent – Mechanical/Piping, PMC/PMT (Mar 2006 to Mar 2007)
Responsible for the implementation of piping fabrication, site pipe installation & field erected boiler, furnace, HRSG, cooling tower, condenser, desalter & other static equipment installation for the Oil Producing Facilities project.
Reviewed design drawing for completeness and constructability, actively managed all phases of construction projects as client representative, including planning/schedule, communications, supervision, execution and completion.
Supervision of all API 650 and 620 field erected tank activities including field hydro testing/ water fill test and disposal procedure.
Interbeton B.V., Sirte oil Co. utilities & power generation Project, Brega, Libya
Mechanical/Piping Supervisor, EPC (Dec 2004 to Dec 2005)
Responsible for the supervision & implementation of major shutdown turnaround (TAR) construction work packages for piping tie-ins in for cooling water & process piping of Power Generation & Marine Jetty Project. Supervision of all piping fabrication, spool coordinator & all site piping installation.
Successfully reinforced & implemented Health, Safety & Environment program at project site.
Supervised shutdown piping tie-in & hot tapping activities, hydrotesting, steam blowing, pipe cleaning & pigging activities.
Supervision of all rotating equipment such as centrifugal pumps (turbine & motor driven), compressors (turbine & motor driven) and blowers including levelling, coupling alignment & grouting.
Saudi electricity company., ghazlan power plant II Project, Juaymah, K.S.A
Construction Mechanical Engineer IV, PMT (Aug 2002 to Sept 2004)
Responsible for the supervision & implementation of mechanical & piping activities for the 4 x 400 MW Thermal Power Plant project. Supervision of all piping fabrication, spool coordinator & all site steam & associated piping installation.
Successfully reinforced & implemented Health, Safety & Environment program at project site.
Lead the implementation of installation of steam boiler, steam drum, superheater, reheater, burners, steam turbine, forced & induced draft fan, condenser & other static & rotating equipment.
Supervision of all rotating equipment such as centrifugal pumps (turbine & motor driven), compressors (turbine & motor driven) and blowers including levelling, coupling alignment & grouting.
Additional Experience
Mechanical Project Engineer, PMC (Dec 1998 to August 2002)
RPQ and Associates/Splash Corporation Pharmaceutical Project, Project 8, Q.C., Philippines
Project Engineer, PMT (Mar 1993 to Aug 1998)
Mariwasa-Siam Ceramics, Inc., Sto. Tomas, Batangas, Philippines
Education
Bachelor of Science in Mechanical Engineer, REGISTERED MECHANICAL ENGINEER
Mapua Institute of Technology, 1994
Supplemental Studies (Seminars And Trainings)
Thai Ceramic Industry, HVAC, Waste Water Treatment Plant, Aug. 1997 - Sep. 1997 ISO-9000 Awareness, Neville-Clark, Sep 1997
Instrumentation Technology, Meralco Foundation Institute, Oct. 1998 - Dec. 1998 Fire Protection System, Ramfire System, 2000HVAC SYSTEM, Overviewing Steam Power Plant, Safe Working Procedure, Mechanical System Design & Standard, 2002 -2003Glass Reinforce Pipe (GRP) Awareness, 2005 GOSP Overview, Critical Lift, 2007 Worked at Heights, Confined Space, Fall Protection, Defensive Driving, Safety Supervisory Training, Apr - Jun 2007 PTW Signatory/ Rasgas & Raslaffan, 2007
Basic Safety Orientation and PTW, Nov - Dec 2009 New to Chevron, 2012 Manage Safe work Practices, 2012
Supervisor Essential Workshop, 2012
References
1.Richard Malberg, Wood PMC, Senior Construction Manager_DUQM Process Area Project, *******.*******@*******.***
2.Jennifer Kim, Fluor Project Director, ********.***@*****.***
3.Alberto Alonzo, Senior Buyer, Worley Parsons – Fluor JV, TCO, Kazakhstan, *******.******@*************.*** / *******.******@*****.***
4.Ray Hord, Fluor Construction Manager, ***.****@*****.***
5.Ed Jones, Fluor Site Manager, **.*****@*****.***
6.Dario Torres, Saipem Indonesia, Piping Superintendent