Post Job Free
Sign in

Superintendent Construction

Location:
Whitney, TX
Posted:
January 07, 2021

Contact this candidate

Resume:

Summary

MATT UNRUH

**********@*****.*** C: 806-***-**** 130 Hamilton Lane Fredericksburg, TX 78624

Accountable Construction Superintendent successful at supervising over 60 team members on various job sites. Over 30 years of experience in the construction field with excellent knowledge of all construction sub-trades. CommiĴed to ensuring quality workmanship and adherence to safety guidelines. Talented at managing budgets and implementing cost controls.

Skills

Project cost estimation Worksite Management Regulation and compliance Controlled budgeting

Establishing goals and setting priorities Blueprint reading and interpretation Basic math skills

Accurate measurements and estimates Quality control

Experience

Construction standards Dependable independent worker Strong work ethic

Exceptional problem solver Team player

Consistent work history Deadline driven

Project oversight

Timely project completion

Allen Keller Fredericksburg, TX Supervise a crew of 60. Help with training new employees in the crew, assist.

Road Construction Superintendent estimates for jobs, Schedule work crew/equipment and Help with employee

2019-present reviews. Start new jobs as well as overseeing the end of jobs.

Blackjack Energy Services Big Spring, TX Overseeing numerous projects consisting of 8 crews and 180 employees.

Project Manager 2012-2018

Servicing wind and oil energy industries needs including road work, base and foundation excavations, crushing and blasting.

* Estimating and scheduling projects and crews as well as equipment needs.

*Operating 6 rock crushers for company use and sales to other contractors.

*Using GPS and Laser Guidance systems to complete work.

Price Construction Inc. Big Spring, TX

Project Manager 2010-2012

Complete numerous projects on time and ahead of schedule for the wind, oil and solar energies.

*Estimation, project bidding and the co-ordination of sub-contractors.

*Operated rock crushers producing aggregate for company used and sales to other sub-contractors.

Granite Construction Company Watsonville, CA

Grading Superintendent 2005-2010

Granite Construction Company Watsonville, Ca

Grading Superintendent 2004-2005

Granite Construction Company Watsonville, CA

Grading Superintendent 2003-2003

Granite Construction Compan

Watsonville, CA

Field Superintendent 2002-2003

Granite Construction Company Watsonville, CA

Excavation Supervisor 2001-2002

Granite Construction Company Watsonville, Ca

Excavation Supervisor 2000-2001

Granite Construction Company Watsonville, CA

Excavation Supervisor 1998-2000

Granite Construction Company Watsonville, CA

General Foreman 1998-1998

Granite Construction Company Watsonville, CA

Excavation Foreman 1994-1998

Lubbock, TX -East- West Marsha Sharp Freeway rebuild of Hwy 62-83

*1,500,000 CY Roadway excavation and embankment

*750,000 SY of MSE wall placement and backfill with select material.

*32 bridges Abatements

*Drainage complete to 8'X8' RCB depth of 40 to 6'X6" RCB over 4miles in Length

*Trimble Bladepro System used grade width of 120' wide main lanes.

*Mined and crushed aggregate for asphalt and concrete paving.

Duvall Mine Project Major Rebuild I 19 intersection -Tucson, Arizona

650,000 CY excavated from borrow pit, hauled to embankment for new on and off ramps and bridges abutments, including the Demolition of existing ramps and abutments.

Drainage completed to 24'X 36" RCP and CMP

10,000 LF MSE wall placement and backfill with temporary wire wall placement

Bentonville, AR -FAA regulated embankment and grading work project Utilized Topcon GPS and Lase

Lubbock, TX- Parmer County Project

Embankment work for new flex base, underground removal and placement of RCP 24" X48" and rock quarry development and reclamation.

Lubbock, TX US 84 Project

Roadway excavation, embankment, placement of salvage base, flex base, fly ash and treaded sub grade along with rock quarry strip mining exploration and development to expose rock edges.

Lubbock, TX - FM2528 Project

Roadway excavation, embankment, placement of salvage base, flex base, MSE wall placement and backfill, bridge header excavation and embankment.

Laredo, TX- Camino Columbia Highway Project

Roadway excavation, embankment on major highway including bridge abutments, placement of grading of lime treatment flex base and MSE wall placement backfill.

Phoenix, Arizona - I-17 Project

Roadway excavation, embankment on major highway in heavy traffic, placement of flex base, demolition of existing concrete roadway and bridge

San Angelo, Texas - Twin Butes Dam Project

Removal and replacement of dam rip tap, evacuation and placement of coffer dam across lake, backfill major key trench for dam, strip mining for gravel sources for aggregate used for cut-off wall backfill.

Danny Wright pipeline Hinton, OK

Operator Foreman 1991-1994

Evacuated and laid high pressure 36" to 96" pipe gas line at excavation depths of 10' to 20' sometimes with cuts of 30'

Bennet Lumber Elk City, ID

Operator 1986-1991

Affixed chokers and sawed timber on the landing in steep terrain, also pioneered logging roads.

H. J. Hammond Company Elk City, Idaho

Operator 1978-1986

Built Logging roads in steep terrain and strip mined overburden on ledge of rock, which was crushed in the 1,000 tons per hour crusher to get to seam of coal 2' to 10, thick.



Contact this candidate