PIYUSH KUMAR SANODIA

Mail id:-adi7u9@r.postjobfree.com

Contact no-075********,076********

Objective: Todevote my entire zest and capabilities for the progress and growth of the Organization, which is highly professional & constantly enhancing my skills to perfectionwhile being resourceful, innovative and flexible.

SNAPSHOT

A seasoned professional withmore than 8 years’ experience in operation and maintenance, Project Of Thermal Power Plant. Results –driven and dedicated with wide range experience in project, commissioning and maintenance of thermal power plant. Excellent track record devising,evaluating and implementing continuous improvements to minimize downtime,reduce cost while maximizing efficiency and quality by establishing effective quality and safety programs. Excellent communicator, success building cohesive teams focused on goals, safety and throughput.

Adept at project planning, monitoring, servicing, testing and maintenance.

Experience in logic design, Drive Automation and implementation.

Experience in Installation,commissioning & Testing of new equipment and ensuring its operability at desired capacity.

Experience in Boiler Automation

●Troubleshooting and logic modification of various equipment like mills, fans,pumps, relay based and microprocessor based control system.

●Calibration and maintenance of feeder and drum level control system for reliable operation.

Skills

Good understanding of P&I drawing, Relay, Logic drawing, Electrical MCC Drawing and signal marshalling drawing.

Familiar with concepts in instrumentation system design integration of various systems.

Knowledge for Turbine Governing System including HIGH PRESUREE and KWU .

Experiences in Boiler& Auxiliary’s Erection

Experience in Critical Power Cycle Piping (HP Piping) erection and quality checking.

It include all connecting piping between Steam Generator and turbine (Main Steam, HRH,CRH), BFD, AUX PRDS, auxiliary Steam piping.

Complete Pressure Part erection till HYDRO Test.

CAREER CONTOUR

Current EMPLOYER

From October 2020 to till date

Toshiba JSW power system

(under contract) at NTPC,kudgi karnataka (3x800MW)

Working as project C&I Engineer

PAST EMPLOYER

From 26 August 2017 to 13 March 2020

Narmada Sugar Pvt.Ltd,Sailchouka Narshighpur

Role and Responsibilities

Working as Shift in charge (operation and maintenance)

Planning & execution of Preventive maintenance, Shutdown & Breakdown

Identifying new areas, Planning activities & Document preparation for up gradation/modification of old system.

PAST EMPLOYER

From 5 April 2013to 5 January 2016

Aditya Aluminium Limited,Sambalpur, Orissa

Working as an AssistantManager in 6 x 150 MW BHEL make Boiler and Turbine Commissioning

Role and Responsibilities

Completed C&I commissioning of 2 (150MW each )Unit including BOP part .

Working as Shift DSC and Maintenance engineer in (C&I) Deptt.

PAST EMPLOYER :-

25th august 2010 to 31st March 2013

Adhunik Power & Natural Resources Limited, Jamshedpur

Company promoted by AdhunikMetallic’s& Steel Ltd. Setting a project of 1080MW (4x270MW) Thermal Power Plant in two phases (4x270MW each phase) at Padampur in Jamshedpur, Jharkhand.

Role and Responsibilities

Worked as Shift DSC and Maintenance engineer in (C&I) Deptt.

Worked here from project stage to running stage of both 270 MW’s Units

10th Sep 2007 to 29th Jun 2009

M/S Ind Synergy Ltd., Raigarh (C.G.),

Company is involved in Sponge manufacturing, full fill power requirement with Captive Power Generation.

Roles and Responsibilities

Working as Assistant Engineer (operation and maintenance)

Operation, maintenance and Calibration ofdifferent Field Instruments & Control device.

It include

●Transmitter (temperature, pressure, level & flow) ABB, ROSEMOUNT NOVUS and YOKOGAWA make, through HART COMMUNICATOR HT 861. (SIEMENS–DCS)

●Switches (pressure, temperature, differential pressure and level),

●pneumatic control valve(MIL,Fisher and forbesmarshell)

●PID Tuning of control valves &Calibration of position feedback

Power distribution and control to Steel Melting Shop.

Grid management (Controlling of MAX. Demand and MIN. Demand)

Executing cost saving and energy saving techniques/measures and modifications to achieve substantial reduction in O&M Expenditures and work within the budget.

Training, participation and Technical skill

Participated in 210MW Advance Thermal Power plant Simulator Training.

Duration -09/01/2012 to 21/01/2012

Venue- Bakereshwar Thermal Power plant (WBPDCL), Bakreshwar(WB)

Participated in 500MW Thermal Power Plant Simulator Training.

Duration - 29/03/2010 to 09/04/2010

Venue - National Power Training Institute, Faridabad

Participated in 15 days Class Room Training in Projected Management

Organized by IIPM,rourkela

ACADEMIA

PGDC in“Thermal Power Plant Engineering” from NPTI, Durgapur from in August 2010 with 74.6%.

B.E in Electronics & Instrumentation engineering from Samrat Ashok Technological Institute(Government Engg. College),Vidisha (M.P) with 67.40%in 2007.

Higher secondary from Sarawati higher sec. school, Seoni (m.p) with 74.44% (M.P Board) in 2002

High school from Sarawati higher sec. school Seoni (m.p ) with 82.80% (M.P)

PERSONAL DOSSIER

Fathers Name : Mr. B.P. Sanodia

Mothers Name : Mrs. Savitri Devi

Matrilal status : Married

Date of birth : 12th Aug 1984.

Language known : English, Hindi

Permanent address :Ganga nagar,seoni (mp)-480661

PIYUSH KUMAR SANODIA



Contact this candidate