Post Job Free

Resume

Sign in

Power Plant Engineer

Location:
Bagdogra, West Bengal, India
Posted:
January 06, 2021

Contact this candidate

Resume:

Dushyant Singh

Gram - Mohammadpur Hayak, Post - Daurala, Panwari, Daurala, Meerut, Sardhana, Uttar

Pradesh, 250221

745*******

adi7no@r.postjobfree.com

Objective To Obtain a challenging position in a high quality engineering environment

where my resourceful experience and academic skills will add value to

organizational operations.

Academic Details Uttar Pradesh Technical University

Bachelor of Technology in Mechanical Engineering, 61.84%, 2015

Work Experience SHREE RENUKA SUGARS LIMITED

Desk Engineer in Power Plant, Aug 2020 - till date

Role : Operates Coal fired AFBC (Atmospheric fluidized bed combustion ),

Capacity 90TPH, Working Pressure- 80 kg/cm^2, boiler type - single drum

water tube FBC boiler in accordance with standard operating procedures .

Starts stops and operates all boiler auxiliaries ( fans, pumps ) etc. Execution

and maintenance of 15 MW Back Pressure Turbo Generator set, Make -

Siemens, Turbine Model No - SST 150, Turbine Rated Speed - 8300 rpm .

Responsible for Overhauling, breakdown, Regular and Preventive

maintenance of ACW Pumps, Reciprocating Compressors, Economizer, Air

Pre Heater (APH), Electrostatic precipitator (ESP), Boiler feed Water

Pumps, Drag chain Feeder. Change over equipment per rotation to

standardize operating times. Records data hourly on all equipments under

my jurisdiction and reports any usual conditions to the watch engineer.

NKG INFRASTRUCTURE LIMITED

Mechanical Maintenance Engineer, Sep 2019 - Jul 2020

Role : Plan, direct and monitor the construction equipment especially earth

moving equipment . Analysis of machine's failure . Estimation of

maintenance costs. Replacing the spare parts of machines as and when

required. Day to day monitoring the progress as per the biggest .

Minimizing fuel and lubricant consumption with proper maintenance .

Maintenance and repair of Backhoe Loader 3DX, D- Coil Machine, Cat

Excavator 320DL, Transit Mixer, Concrete Pump SP1400, SP1807,

Escort Hydra 12T, F15, Wheel Loader HM 2021, Ace Fixed Tower Crane

, Ace Mobile Tower Crane, Batching Plant CP60 or M1, CP30, Monkey

Crane, DG Set- 250, 125 Kva, Mait Machine .

GPT INFRAPROJECTS LIMITED

Assistant Engineer Mechanical, Nov 2018 - Aug 2019

Role : Plan, direct and monitor the construction especially earth moving

equipment . Worked in report making towards maintenance done on

specified machinery with the easier format that cover the entire data of work

done which was developed by me . Adopt and implement a detailed

maintenance plan to minimize the failure resulting in stoppage of work .

Maintenance and repair of Batching Plant CP18, Macons MA12, Air

Compressor P310, Hand Grinder, Welding Transformer, Bar Bending

Machine, Backhoe Loader 3DX, Escort Hydra 12T, Concrete Pump

SP1400, Electric Vibrator, Diesel Genset - 125, 82.5, 30 Kva .

UTM ENGINEERING PVT LTD

Graduate Engineer Trainee in Mechanical, Nov 2016 - Oct 2018

Role : Plan, direct and monitor the construction equipment especially earth

moving equipment . Analysis of machine's failure . Estimation of

maintenance costs . Replacing the spare parts as and when required . Day

to day monitoring the progress as per the biggest . Minimizing the fuel and

lubricant consumption with proper maintenance. Maintenance and repair of

Boomer L2D, Air Compressor GA 90, Excavator EC140BLC, Transit

Mixer, Sika Shotcrete Machine PM4207P, Diesel Genset - 320, 180 Kva

, Batching Plant CP30, Tata Hitachi Excavator 110, Water Pump,

Ckncrete Pump BSA 1404E .

Project Details 15 MW SHREE RENUKA SUGARS LIMITED ( SRSL ) CO GENERATION

POWER PLANT

Operates 90 TPH Coal fired Atmospheric fluidized bed combustion ( AFBC

) boiler, Make - cethar vessel ltd, Boiler type - Single drum water tube FBC

boiler. Outlet steam pressure - 67 ATA, temperature- 500 degree celsius .

Furnace size - 9630 5132 MM, Expanded bed height - 975 MM . 15 MW

Back Pressure Turbo Generator set, Make - Siemens .Turbine Model No -

SST 150, Turbine rated speed- 8300 rpm, Direction of rotation- Counter

clockwise . Inlet steam Pressure - 64 ATA, temperature- 495 degree

Celsius. Exhaust steam pressure- 2.5 ATA, temperature- 250 degree

celsius . 50 m^3/ hr demineralised water plant, make- thermax india pvt ltd,

RO generation capacity - 120 m^3/hr, DM Generation Capacity- 50 m^3/hr .

100 TPH Capacity Coal Handling Plant, Make - Hycube india pvt ltd .

Period : Aug 2020 - Till date Team Size:

Role : Desk Engineer in Power Plant

GURU GOBIND SINGH INDRAPRASTHA UNIVERSITY PROJECT

After a long wait, the project committee of Delhi government has passed

the decision on the construction of guru gobind singh indraprastha

university's campus in east delhi shahdara . The foundation stone of

building was laid by the former minister of human resource development

smriti irani in 2014. Spread over 18.75 acres of land .

Period : Sep 2019 - July 2020 Team Size:

Role : Mechanical Maintenance Engineer

CONSTRUCTION OF BRIDGE OVER KATAKHALI RIVER OF 2.8 kM IN

NORTH 24 PARGANAS .

The Project involves construction of bridge over river Katakhali in

Hasnabad for linking Taki rod ( SH2 ) with Hasnabad Hingalganj road (

MDR ) in North 24 Parganas district .

Period : Nov 2018 - Aug 2019 Team Size:

Role : Assistant Engineer Mechanical

USBRL ( UDHAMPUR- SRINAGAR- BARAMULLA RAIL LINK) PROJECT

The Jammu - Udhampur - Katra - Quazigund - Baramulla railway line is the

biggest project in the construction of mountain railway since independence.

From Jammu to Baramulla, length of the new rail line is 345 km . The

Project has been declared as a project of national importance in march

2002 .

Period : Nov 2016 - Oct 2018 Team Size:

Role : Graduate Engineer Trainee in Mechanical Department

Field of Interest Operates Coal fired Atmospheric Fluidized Bed Combustion ( AFBC ) Boiler

, Capacity- 90 TPH .

Responsible for Overhauling, breakdown, Regular and Preventive

maintenance of 15 MW Back Pressure Turbo Generator Set.

Responsible for Overhauling, breakdown, Regular and Preventive

maintenance of ACW Pumps, Reciprocating Compressors, Air Pre Heater (

APH ), Electrostatic Precipitator ( ESP ), Economizer, Belt Conveyor, Boiler

Feed Water Pumps, Drag Chain Feeder.

Execution and maintenance of 15 MW Back Pressure Turbo Generator Set

, Make - Siemens, Turbine Model No- SST 150, Turbine Rated Speed-

8300 rpm .

Skills Operates 1 90 TPH Atmospheric Fluidized Bed Combustion ( AFBC )

Boiler .

Starts stops and operates all boiler auxiliaries like fans, pumps etc .

Erection and dismantling parts.

Assembling of heavy machinery according to the job requirements.

Industrial Industrial Visit at:

Exposure SHREE RENUKA SUGARS LIMITED, From Aug 2020 - Till date

NKG INFRASTRUCTURE LIMITED, From Sep 2019 - July 2020

Implant Training at:

Daurala Sugar Works, DCM Shriram, First Plant in india to manufacture

double refined Sugar of international quality.

Achievements Proved to be an excellent team leader .

Was able to eliminate machine failure to the minimum possibility.

Strength Quick Learner .

Verbal Communication Skills .

Decision making, Critical thinking

Flexible to different situations.

Self motivation, initiative with a high level of energy.

Declaration I hereby declare that the above written particulars are true and correct to the

best of my knowledge and beliefs.

Date : October 03, 2020

Place : Haldia, West Bengal



Contact this candidate