Dushyant Singh
Gram - Mohammadpur Hayak, Post - Daurala, Panwari, Daurala, Meerut, Sardhana, Uttar
Pradesh, 250221
***************@*****.***
Objective To Obtain a challenging position in a high quality engineering environment
where my resourceful experience and academic skills will add value to
organizational operations.
Academic Details Uttar Pradesh Technical University
Bachelor of Technology in Mechanical Engineering, 61.84%, 2015
Work Experience SHREE RENUKA SUGARS LIMITED
Desk Engineer in Power Plant, Aug 2020 - till date
Role : Operates Coal fired AFBC (Atmospheric fluidized bed combustion ),
Capacity 90TPH, Working Pressure- 80 kg/cm^2, boiler type - single drum
water tube FBC boiler in accordance with standard operating procedures .
Starts stops and operates all boiler auxiliaries ( fans, pumps ) etc. Execution
and maintenance of 15 MW Back Pressure Turbo Generator set, Make -
Siemens, Turbine Model No - SST 150, Turbine Rated Speed - 8300 rpm .
Responsible for Overhauling, breakdown, Regular and Preventive
maintenance of ACW Pumps, Reciprocating Compressors, Economizer, Air
Pre Heater (APH), Electrostatic precipitator (ESP), Boiler feed Water
Pumps, Drag chain Feeder. Change over equipment per rotation to
standardize operating times. Records data hourly on all equipments under
my jurisdiction and reports any usual conditions to the watch engineer.
NKG INFRASTRUCTURE LIMITED
Mechanical Maintenance Engineer, Sep 2019 - Jul 2020
Role : Plan, direct and monitor the construction equipment especially earth
moving equipment . Analysis of machine's failure . Estimation of
maintenance costs. Replacing the spare parts of machines as and when
required. Day to day monitoring the progress as per the biggest .
Minimizing fuel and lubricant consumption with proper maintenance .
Maintenance and repair of Backhoe Loader 3DX, D- Coil Machine, Cat
Excavator 320DL, Transit Mixer, Concrete Pump SP1400, SP1807,
Escort Hydra 12T, F15, Wheel Loader HM 2021, Ace Fixed Tower Crane
, Ace Mobile Tower Crane, Batching Plant CP60 or M1, CP30, Monkey
Crane, DG Set- 250, 125 Kva, Mait Machine .
GPT INFRAPROJECTS LIMITED
Assistant Engineer Mechanical, Nov 2018 - Aug 2019
Role : Plan, direct and monitor the construction especially earth moving
equipment . Worked in report making towards maintenance done on
specified machinery with the easier format that cover the entire data of work
done which was developed by me . Adopt and implement a detailed
maintenance plan to minimize the failure resulting in stoppage of work .
Maintenance and repair of Batching Plant CP18, Macons MA12, Air
Compressor P310, Hand Grinder, Welding Transformer, Bar Bending
Machine, Backhoe Loader 3DX, Escort Hydra 12T, Concrete Pump
SP1400, Electric Vibrator, Diesel Genset - 125, 82.5, 30 Kva .
UTM ENGINEERING PVT LTD
Graduate Engineer Trainee in Mechanical, Nov 2016 - Oct 2018
Role : Plan, direct and monitor the construction equipment especially earth
moving equipment . Analysis of machine's failure . Estimation of
maintenance costs . Replacing the spare parts as and when required . Day
to day monitoring the progress as per the biggest . Minimizing the fuel and
lubricant consumption with proper maintenance. Maintenance and repair of
Boomer L2D, Air Compressor GA 90, Excavator EC140BLC, Transit
Mixer, Sika Shotcrete Machine PM4207P, Diesel Genset - 320, 180 Kva
, Batching Plant CP30, Tata Hitachi Excavator 110, Water Pump,
Ckncrete Pump BSA 1404E .
Project Details 15 MW SHREE RENUKA SUGARS LIMITED ( SRSL ) CO GENERATION
POWER PLANT
Operates 90 TPH Coal fired Atmospheric fluidized bed combustion ( AFBC
) boiler, Make - cethar vessel ltd, Boiler type - Single drum water tube FBC
boiler. Outlet steam pressure - 67 ATA, temperature- 500 degree celsius .
Furnace size - 9630 5132 MM, Expanded bed height - 975 MM . 15 MW
Back Pressure Turbo Generator set, Make - Siemens .Turbine Model No -
SST 150, Turbine rated speed- 8300 rpm, Direction of rotation- Counter
clockwise . Inlet steam Pressure - 64 ATA, temperature- 495 degree
Celsius. Exhaust steam pressure- 2.5 ATA, temperature- 250 degree
celsius . 50 m^3/ hr demineralised water plant, make- thermax india pvt ltd,
RO generation capacity - 120 m^3/hr, DM Generation Capacity- 50 m^3/hr .
100 TPH Capacity Coal Handling Plant, Make - Hycube india pvt ltd .
Period : Aug 2020 - Till date Team Size:
Role : Desk Engineer in Power Plant
GURU GOBIND SINGH INDRAPRASTHA UNIVERSITY PROJECT
After a long wait, the project committee of Delhi government has passed
the decision on the construction of guru gobind singh indraprastha
university's campus in east delhi shahdara . The foundation stone of
building was laid by the former minister of human resource development
smriti irani in 2014. Spread over 18.75 acres of land .
Period : Sep 2019 - July 2020 Team Size:
Role : Mechanical Maintenance Engineer
CONSTRUCTION OF BRIDGE OVER KATAKHALI RIVER OF 2.8 kM IN
NORTH 24 PARGANAS .
The Project involves construction of bridge over river Katakhali in
Hasnabad for linking Taki rod ( SH2 ) with Hasnabad Hingalganj road (
MDR ) in North 24 Parganas district .
Period : Nov 2018 - Aug 2019 Team Size:
Role : Assistant Engineer Mechanical
USBRL ( UDHAMPUR- SRINAGAR- BARAMULLA RAIL LINK) PROJECT
The Jammu - Udhampur - Katra - Quazigund - Baramulla railway line is the
biggest project in the construction of mountain railway since independence.
From Jammu to Baramulla, length of the new rail line is 345 km . The
Project has been declared as a project of national importance in march
2002 .
Period : Nov 2016 - Oct 2018 Team Size:
Role : Graduate Engineer Trainee in Mechanical Department
Field of Interest Operates Coal fired Atmospheric Fluidized Bed Combustion ( AFBC ) Boiler
, Capacity- 90 TPH .
Responsible for Overhauling, breakdown, Regular and Preventive
maintenance of 15 MW Back Pressure Turbo Generator Set.
Responsible for Overhauling, breakdown, Regular and Preventive
maintenance of ACW Pumps, Reciprocating Compressors, Air Pre Heater (
APH ), Electrostatic Precipitator ( ESP ), Economizer, Belt Conveyor, Boiler
Feed Water Pumps, Drag Chain Feeder.
Execution and maintenance of 15 MW Back Pressure Turbo Generator Set
, Make - Siemens, Turbine Model No- SST 150, Turbine Rated Speed-
8300 rpm .
Skills Operates 1 90 TPH Atmospheric Fluidized Bed Combustion ( AFBC )
Boiler .
Starts stops and operates all boiler auxiliaries like fans, pumps etc .
Erection and dismantling parts.
Assembling of heavy machinery according to the job requirements.
Industrial Industrial Visit at:
Exposure SHREE RENUKA SUGARS LIMITED, From Aug 2020 - Till date
NKG INFRASTRUCTURE LIMITED, From Sep 2019 - July 2020
Implant Training at:
Daurala Sugar Works, DCM Shriram, First Plant in india to manufacture
double refined Sugar of international quality.
Achievements Proved to be an excellent team leader .
Was able to eliminate machine failure to the minimum possibility.
Strength Quick Learner .
Verbal Communication Skills .
Decision making, Critical thinking
Flexible to different situations.
Self motivation, initiative with a high level of energy.
Declaration I hereby declare that the above written particulars are true and correct to the
best of my knowledge and beliefs.
Date : October 03, 2020
Place : Haldia, West Bengal