Thomas McGlauflin

**** ********, **************

254-***-****

adi5qt@r.postjobfree.com

Project Superintendent

Thomas McGlauflin Construction Superintendent

40+ years in the construction industry, the last 20 years as superintendent. A broad range experience in areas including vertical and horizontal construction, infrastructure improvement, interior finish out, retail stores, superintendent responsibilities, coordinate subcontractors, provide each subcontractor with a 3 week schedule, coordinate weekly subcontractor meetings, weekly tool box meetings, inspects all phases of work to insure the quality and the plans are followed, daily safety evaluations and review JHA, insure specs and drawings are followed.

Certifications Held

USACE Quality Management for Contractors Certification

CPR /First Aid Certified

ACI Certified Tilt-up supervisor

OSHA 30 HOUR and 10 hour refresher

OSHA #510 class

OSHA Excavation safety

OSHA Electrical Standards

Procore Safety Classes on Celica safety, fall protection,

176 hours of STP

Supervising training & preparation through the AGC.

Experience

Schwob Building Company, Ltd 2019 2020

Scheduling sub through 3-week schedule, conducted weekly sub meetings and Safety with all subs, check all phases of work. Help on 1 south eastern fright line metal building with 40 or more dock doors in Helped on an Old Dominion fright line metal building with 40 or more dock doors in Oklahoma

Helped on SMU indoor practice field Headed up Patterson UTI placing 12-inch Roller Compacted Concrete over 8” limed sub grade on 40 Acer job site

Griffco Design/Build, INC Jan 2018 Jan 2019

Senior Superintendent

Scheduling subs through a 3-week schedule, check all phases of work, weekly safety meeting and sub meetings. Took over a 170,000 Sq. foot Tilt wall shell building with 20 dock doors

Built 90,000 sq. foot metal building new JB WELD with 11 doc doors

Bob Moore Construction 2013 - 2017

Project Superintendent

Schedule subs typically for 3-week schedules, check all phases of work

Completed a 300,000 sq foot ware house tilt wallNGC RENEWABLES with dry wall office area. Worked 250,000 square foot retail mall, 280,000 sq foot manufacturing plant with a 80,000 sq foot office space that was high end finish / detailed - Channell Commercial. Completed a 600,000 SQ FOOT distribution center for Sherwin Williams. 200,000SQ FOOT 2-story tilt wall and finish out at GM Finical building in San Antonio Tex 120,000 sq foot meatal building in Hillsboro Tex.

Azbell

Suppersport February 2013 to August 2013

Planning scheduleing subs ware house office

Express, Aero Tech and Suntiva 2011- 2013

Completed a 3-month job in 2 months – remodel check point stations in El Centro, CA. Check points #86 and #111. Completed columnrepairat#111; added new lighting, booth, and shutters to #86.

Replace Fire Alarm System – roof replacement on buildings 255& 256 Laughlin AFB Texas

Training QCM on submittals keeping up with submittal log; supervision of fire alarm installation and roof replacement to insure all specifications are met; held weekly subcontractor meetings; weekly safety meetings; held weekly owner meetings. Also led preparatory meeting with all subcontractors before starting work to review specs and cover safety and AHA.

Worked as the QA Contractor for the USACE on 2 dorms at Goodfellow AFB TX,

Military - 100 room dorm and another 200-room dorm

As Quality Assurance, I reviewed all submittals, oversaw all prep meetings, did all initial inspections and follow up inspections. Performed all testing of all underground plumbing, backfilling, rebar insulation, concrete pours temp and slump, fire suppression, mass notification, security systems, as-builts to ensure everything was recorded. Reviewed all site safety plans and made sure these plans where followed.

Harrison Walker & Harper (HWH) 2004 –2011

Project Superintendent

Completed the Dyess AFB C130J Multipurpose Hanger; $23M in new military construction

Along with Cleburne

Civic

Center;

tilt walls & metal stud framing renovation, McLennan Community College; New Science Building and the TexasStateTechnicalCollege;interior finish renovation of the welding shop & offices, Newlywed Foods; tilt wall structure& metal stud framing, new construction

Essilor Clean Room and Office; Renovation interior finish out, Phases 1 & 2, Ponder Elementary School - admin. and locker rooms

Waco Construction (WCI) 1998 –2004

Interior finish out Project Superintendent & Asst. Superintendent

Memorial Dorm Dining Hall add-on BaylorUniversity; Asst. Supt.

BaylorUniversityHankamerSchool of Business; renovated all 3 floors Asst. Supt.

BaylorUniversityStudentLifeCenter; Asst. Supt.

BaylorUniversity(old) LawSchool Renovation; Asst. Supt.

Baylor University Stacey Riddle Pan-HellenicBuilding

Remolded several other buildings at Baylor in this time frame

Professional References:

Lawrence Hall 817-***-**** Superintendent

Michael Cayton 903-***-**** Superintendent

Andrew Levchak 239-***-**** Project Manager Bob Moore

Rick Kincaid 817-***-**** Project Manager