Thomas McGlauflin
adi5qt@r.postjobfree.com
Project Superintendent
Thomas McGlauflin Construction Superintendent
40+ years in the construction industry, the last 20 years as superintendent. A broad range experience in areas including vertical and horizontal construction, infrastructure improvement, interior finish out, retail stores, superintendent responsibilities, coordinate subcontractors, provide each subcontractor with a 3 week schedule, coordinate weekly subcontractor meetings, weekly tool box meetings, inspects all phases of work to insure the quality and the plans are followed, daily safety evaluations and review JHA, insure specs and drawings are followed.
Certifications Held
USACE Quality Management for Contractors Certification
CPR /First Aid Certified
ACI Certified Tilt-up supervisor
OSHA 30 HOUR and 10 hour refresher
OSHA #510 class
OSHA Excavation safety
OSHA Electrical Standards
Procore Safety Classes on Celica safety, fall protection,
176 hours of STP
Supervising training & preparation through the AGC.
Experience
Schwob Building Company, Ltd 2019 2020
Scheduling sub through 3-week schedule, conducted weekly sub meetings and Safety with all subs, check all phases of work. Help on 1 south eastern fright line metal building with 40 or more dock doors in Helped on an Old Dominion fright line metal building with 40 or more dock doors in Oklahoma
Helped on SMU indoor practice field Headed up Patterson UTI placing 12-inch Roller Compacted Concrete over 8” limed sub grade on 40 Acer job site
Griffco Design/Build, INC Jan 2018 Jan 2019
Senior Superintendent
Scheduling subs through a 3-week schedule, check all phases of work, weekly safety meeting and sub meetings. Took over a 170,000 Sq. foot Tilt wall shell building with 20 dock doors
Built 90,000 sq. foot metal building new JB WELD with 11 doc doors
Bob Moore Construction 2013 - 2017
Project Superintendent
Schedule subs typically for 3-week schedules, check all phases of work
Completed a 300,000 sq foot ware house tilt wallNGC RENEWABLES with dry wall office area. Worked 250,000 square foot retail mall, 280,000 sq foot manufacturing plant with a 80,000 sq foot office space that was high end finish / detailed - Channell Commercial. Completed a 600,000 SQ FOOT distribution center for Sherwin Williams. 200,000SQ FOOT 2-story tilt wall and finish out at GM Finical building in San Antonio Tex 120,000 sq foot meatal building in Hillsboro Tex.
Azbell
Suppersport February 2013 to August 2013
Planning scheduleing subs ware house office
Express, Aero Tech and Suntiva 2011- 2013
Completed a 3-month job in 2 months – remodel check point stations in El Centro, CA. Check points #86 and #111. Completed columnrepairat#111; added new lighting, booth, and shutters to #86.
Replace Fire Alarm System – roof replacement on buildings 255& 256 Laughlin AFB Texas
Training QCM on submittals keeping up with submittal log; supervision of fire alarm installation and roof replacement to insure all specifications are met; held weekly subcontractor meetings; weekly safety meetings; held weekly owner meetings. Also led preparatory meeting with all subcontractors before starting work to review specs and cover safety and AHA.
Worked as the QA Contractor for the USACE on 2 dorms at Goodfellow AFB TX,
Military - 100 room dorm and another 200-room dorm
As Quality Assurance, I reviewed all submittals, oversaw all prep meetings, did all initial inspections and follow up inspections. Performed all testing of all underground plumbing, backfilling, rebar insulation, concrete pours temp and slump, fire suppression, mass notification, security systems, as-builts to ensure everything was recorded. Reviewed all site safety plans and made sure these plans where followed.
Harrison Walker & Harper (HWH) 2004 –2011
Project Superintendent
Completed the Dyess AFB C130J Multipurpose Hanger; $23M in new military construction
Along with Cleburne
Civic
Center;
tilt walls & metal stud framing renovation, McLennan Community College; New Science Building and the TexasStateTechnicalCollege;interior finish renovation of the welding shop & offices, Newlywed Foods; tilt wall structure& metal stud framing, new construction
Essilor Clean Room and Office; Renovation interior finish out, Phases 1 & 2, Ponder Elementary School - admin. and locker rooms
Waco Construction (WCI) 1998 –2004
Interior finish out Project Superintendent & Asst. Superintendent
Memorial Dorm Dining Hall add-on BaylorUniversity; Asst. Supt.
BaylorUniversityHankamerSchool of Business; renovated all 3 floors Asst. Supt.
BaylorUniversityStudentLifeCenter; Asst. Supt.
BaylorUniversity(old) LawSchool Renovation; Asst. Supt.
Baylor University Stacey Riddle Pan-HellenicBuilding
Remolded several other buildings at Baylor in this time frame
Professional References:
Lawrence Hall 817-***-**** Superintendent
Michael Cayton 903-***-**** Superintendent
Andrew Levchak 239-***-**** Project Manager Bob Moore
Rick Kincaid 817-***-**** Project Manager