A: Charlotte, NC E: *****.*******@*****.*** M: 704-***-**** L: http://linkedin.com/in/ishanneema EDUCATION
University of North Carolina at Charlotte Charlotte, NC Master of Science in Construction & Facilities Management, GPA 3.72/4 Dec 2020 Rajiv Gandhi Proudyogiki Vishwavidyalaya Bhopal, India Bachelor of Engineering in Civil Engineering, GPA 3.5/4 Jun 2015 SKILLS AND CERTIFICATIONS
Project Management Software: Primavera P6, Procore, MS Project, MS Office pack, OTS, Bluebeam Designing Software: AutoCAD, Revit (BIM), Navisworks, Synchro, Sketchup, Civil 3D, 3DX Max, Road-estimator Data Analysis: Python, MATLAB, MS Visual Basic
Certifications: CMIT, OSHA 30, Procore, Primavera P6, MATLAB, AutoCAD, 3DX Max PROFESSIONAL EXPERIENCE
Graduate Research Assistant University of North at Charlotte Jul 2019 – Dec 2020
Developed a deterioration model & utilized it for predicting pavement’s performance & serviceability
The model integrates the effects of flooding and can predict pavements’ performance for pre-and-post flood times Assistant Project Manager Maa Narmada Infra. Ltd., India 100-Mile Interstate project Jun 2016 – Dec 2018
Oversaw and completed the construction of infrastructure projects of the budgeted cost of more than $100 million
Procured and organized RFIs, RFQs, submittals, shop drawings, and change orders that expedited project completion
Performed regular site inspections for ensuring workmanship that resulted in strict quality and controlled budget
Effectively scheduled and updated work activities using MS Project and supervised project CPM management
Addressed and resolved work bottlenecks by leading review meetings with field crews and project management team
Developed project lookahead for three weeks using the Procore
Monitored and coordinated subcontractors, which helped in achieving expected work progress and gross profit margin Project Engineer Maa Narmada Infra. Ltd., India 100-Mile Interstate project Jul 2015 – May 2016
Administered and completed construction of 3 long-span bridges of the budgeted cost of $3 million
Prepared and submitted phase-wise as-built drawings by the reconciliation of the site work
Prevented budget overruns and improved decision-making by accurate estimation of quantity take-offs
Optimized vendor evaluation and selection by precise solicitation of RFQs and RFPs
Acted as a liaison between the GC & client that improved communication and efficacy
Prepared bid estimated and bid documents that lead to the procurement of new contracts Assistant Project Engineer Indore Development Authority, India 7-Storey Building Jun 2014 – May 2015
Designed architectural component of a residential tower using AutoCAD and Revit within the assigned time
Prepared bill of quantities, bar bending schedule, activities inventory, and punch list for submittals
Facilitated material testing and prepared QA/QC reports as per the design and specifications ACADEMIC PROJECTS
Designed 3-Storey Health Center at UNC Charlotte, NC using Autodesk BIM Mar 2020 – May 2020
Designed architectural, structural, and MEP components of the health center using Autodesk Revit
Detected & resolved clashes in building components; produced 4D simulation and quantity take-off on Navisworks Developed the construction schedule for a bridge located at Sandy Creek, NC Aug 2019 – Nov 2019
Prepared baseline schedule, earned value chart, and total cost for all project activities on MS Project Safety audit for undergraduate admission center at UNC Charlotte, NC Mar 2019 – May 2019
Performed safety risk evaluations to identify and resolve the safety hazards as per the OSHA guidelines