ENGINEERING PROFESSIONAL- POWER PLANTS

Strong record of delivering superior performances under demanding work environments; seeking senior level assignments across the industry

PROFILE:

Technically competent Engineering professional with comprehensive professional contribution in Project Erection, Commissioning & Maintenance activities in power units.

Complete knowledge of captive power plant operation, safety, and efficiency management systems

adept in generating structured technical reports and documentation to serve as handy resource to resolve operational issues.

Adequate exposure in identifying root cause of problems and operational bottlenecks to work out pragmatic solutions. Understanding of all aspects governing operational / production activities & up to date knowledge of latest technological advancements, regulations/ guidelines & statutory compliances in the industry.

Strong team builder and motivator with ability to generate work synergy among team members to achieve desired productivity levels.

PROFESSIONAL EXPERIENCE:

Currently working CHHATTISGARH STEEL & POWER LIMITED, CHAMPA (C.G.)

as Assistant Manager - C & I {35 MW} Since Aug ‘2016.

M/S. TRN ENERGY PVT. LTD., NAWAPARA,RAIGARH (C.G.)

Dayanidhi Energy Service Private Limited,

Senior Engineer – power plant C & I ( 2 x 300 MW ) Since Jan‘ 2016 – Aug‘2016

2x300 MW COAL BASED POWER PROJECT UNIT I (300 MW) in commissioning stage

and UNIT II (300 MW) in under construction. Involved in the Erection & commissioning of

o Boiler (PFBC) make – China Western Power Industrial Co., Ltd.,

oTurbine & Generator make – Beijing Beizhong Steam Turbine Generator Co. Ltd. Condensing Type steam turbine ( Rated speed- 3000 rpm, main steam flow- 972 t/h,steam pressure -17.75 MPa & steam temp.- 540 C ) fully control by Digital Electro Hydraulic Control system PLC make- hollysys, DCS make Symphony plus from ABB Company Ltd.,TSI make- BENTLY NEVEDA 3500,Control valve make– Fisher,Samson,ABB control by smart positioner use HART communication protocol, Motorized valve make – ROTORK, RAGA,YANGZHOU,TINJIN

oErection & commissioning of instruments like Smart Transmitters, Control valves, Motorized valves, Dampers, Probe sensors, Thermocouple & RTD etc.

CHHATTISGARH STEEL & POWER LIMITED, CHAMPA (C.G.)

Senior Engineer - Power Plant C & I {35 MW } Oct’ 2011 – sep’ 2015

Engineer - Power Plant C & I {35 MW} Oct’ 2009 – Oct’ 2011

Primarily responsible for looking after the DCS system for 35 MW Thermal Power Plant.

Involved in the Operation, maintenance & commissioning of

oBHEL DCS (MAX-DNA ver 4.3.1 SP6)

oTurbine control system for 35 MW Thermal Power Plant with WOODWARD GOVERNER 505.

oAll the control & measuring instruments for 142 TPH CFBC Boiler & 35MW T.G. System.

CFBC make- WUXI Boiler Compa (China), Instrument like smart transmitters make YOKOGAWA, Motorize Valve make- NANJING TURBINE & ELECTRIC MACHINERY (GROUP) CO. LTD., Fully controlled by DCS make- Max DNA,Turbine make- NANJING TURBINE & ELECTRIC MACHINERY(GROUP) CO. LTD .Condensing Type Steam Turbine - 3000 rpm fully controlled by WOODWARD Governor (Model No. – 505).

Maintenance & calibration of different field instruments like Temperature, Motion, load cell, VFD, Flow, Pressure, Level transmitters, Motorized actuators etc.

General experience in different project works including erection & commissioning of electrical equipments, ash handling instruments and PLC system.

M/S. RASHMI SPONGE & POWER INDUSTRIES LTD. RAIPUR (C.G.).

Assistant Engineer - Power Plant C & I {8MW} Sep’2007- Oct ‘2009

An Integrated Steel & Power Division certified Plant with captive Power generating of 8 MW capacity power

Plant including AFBC (27 TPH) & WHRB (2x 10.5 TPH) & Sponge Iron Division (2 x100 TPD).

Instrument like Smart Transmitters make- ABB & ROSEMOUNT, Control Valve make -INSTRUMENT LTD. & MAZDA CONTROL LTD., Motorized Valve make- ROTORK LTD., VFD Drive make- ABB, Fully controlled by DCS make YOKOGAWA (Model No.- CS1000), Ash Handling System make- DENSE PHASE PNEUMATIC LTD. (PLC make- SEIMENS).Turbine make- TRIVENI ENGG. LTD. fully controlled by WOODWARD Governor (Model No. – 505), TURBINE SUPERVISORY INSTRUMENTATION SYSTEM make- BENTLY NEVEDA 3500 etc.

Calibration & Maintenance of all types of instruments like Smart Transmitters, Control valves, Motorized valves Dampers, Probe sensors, Thermocouple & RTD etc.

EDUCATIONAL & PROFESSIONAL DETAILS:

Engineering - Electronics & communication in 2005

Guru Ghansidas University, Bilaspur (C.G.)

12TH, 1998

Hr. Sec. School, Ghurdewa (korba)-495447

M.P. Board of Secondary Education, Bhopal

10TH, 1996

Hr. Sec. School, Ghurdewa (korba)-495447

M.P. Board of Secondary Education, Bhopal

PERSONAL DETAILS:

Name: Rajesh Kumar Father’s Name: Shri. Madhav chandra

Sex: Male Father’s Occupation: Retired employed from SECL

Date of Birth: 18 apr, 1981 Nationality: Indian