Post Job Free

Resume

Sign in

Engineer Construction

Location:
Chennai, Tamil Nadu, India
Posted:
January 04, 2021

Contact this candidate

Resume:

Post Applied For: - Quantity Surveyor (MEP) or Any Suitable Post

Patrick James .S

*** **** ******* ******** ******

KP Road Nagercoil

Kanyakumari Dist.

Tamil Nadu 629001,

Tel +91-936*******

OBJECTIVE:

Seeking a challenging position as a Quantity Surveyor or any suitable post as per my qualification and experience with a reputable company that will allow me to contribute my best and enhance my knowledge and experience within a professional environment. PERSONAL

DETAILS:

Full Name : Patrick James. S

Date of Birth : 29

th

July 1990

Civil Status :Bachelor

Nationality : Indian

Age : 29

College last attended : Noorul Islam University

Highest Degree : B.E/B.tech

Department : Mechanical

Passport Number : R0083920

Valid Till : 23/04/2027

Driving License : Holding valid Indian driving license for Motorcycle and Light Vehicle

Country of work : Oman

Last Employer : Durat Al Sahil Services And Trade LLC

Position Held : MEP Quantity Surveyor

Duration : Aug 2017 to July 2019

ADDITIONAL

QUALIFICATION:

Primavera Project Management and MS Office Project

Auto Cad (2d)

Computer Skills

1. Microsoft Excel

2. Microsoft Word

3. Auto Cad

4. Foxit Phantom PDF

QA/QC Engineering

NDT (Non Destructive Testing Level 2)

1. Magnetic Testing

2. Penetrant Testing

3. Radiographic Testing

4. Radio graphic Film Interpretation

5. Ultrasonic Testing

Six Sigma Green Belt

IELTS :- 7.5/10

PROFFESIONAL

SUMMARY:

Total years of Experience: 2 years (2017-2019)

As MEP Quantity Surveyor in Tender Dept. at Durat Al Sahil Services and Trade LLC. Sultanate of Oman.

Total years of Experience: (2019-Till Today)

As MEP Engineer and Quantity Surveyor at R.K.Constructions Kanyakumari Dist. Tamil Nadu Experience in the discipline of MEP Quantity Surveyor for Pre Tendering and Post Tendering including Estimation works & MEP Project Execution Management in Construction project with details as stated below.

Police Complex at Mudhebie, Oman for Royal Oman Police

Police Complex at Maqshin. Oman for Royal Oman Police

Police Complex at Mahdha. Oman for Royal Oman Police

Officers Accommodation at Bidiya. Oman for Royal Oman Police

Officers Accommodation at Al Kamil. Oman for Royal Oman Police

Barracks and Recreation Hall at Nizwa Oman for Royal Oman Police

Office Building at Al Khuwair (Itower), Oman

Extension of Head Office Building at Al Khuwair Oman for Oman Gas Company.

Pre tendering Estimation for MEP works for construction of Hospital at Maqshin for Ministry of health.

Pre tendering Estimation for MEP works for the construction of Sewage water treatment plant at Raysuit Salalah Oman for Public Establishment for Industrial Estates.

Pre tendering Estimation for MEP works for the construction of Water supply pipe line for the Royal Oman Police camp at Al Fulaij area Ibra Oman for The Public Authority of Electricity and Water.

Pre tendering Estimation for MEP works for the construction of DCDF complex for the Royal Oman Police .

DETAILED TASKS

ASSIGNED:

Handled various project sites as an MEP Quantity surveyor and Cost controller for Post Tender and Variation preparation and involved in Estimation and BOQ preparation for Pre Tendering Works for the Employer and relevant Client.

Police complex at Mudhebie, Maqshin & Mahdha for Royal Oman Police handled post variation, Cost Control, Quantity Check from Site and preparation of Variation for Submittals to the Client for the construction of Police station, Barracks, Officers Bed Sit, Recreation Hall, Kitchen and Service Yard, Guard House and complete External Services.

Officer Accommodation a Bidiya and Al Kamil for Royal Oman Police handled post variation, Cost Control, Quantity Check from Site and preparation of Variation for Submittals to the Client.

Barracks and Recreation Hall at Nizwa Oman for Royal Oman Police handled post variation, Cost Control, Quantity Check from Site and preparation of Variation for Submittals to the Client.

Construction of Itower for Gulf Muscat handled post variation, Cost Control, Quantity Check from Site and preparation of Variation for Submittals to the Client.

Expansion of Head office building for Oman Gas Company handled post variation, Cost Control, Quantity Check from Site and preparation of Variation for Submittals to the Client.

Hospital at Maqshin for Ministry Of Health executed Estimation and BOQ preparation with cost analysis for Tender Submission.

Construction of sewage water treatment plant for Public Establishment for Industrial Estates executed Estimation and BOQ preparation with cost analysis for Tender Submission.

Construction of pipe line for the Royal Oman Police camp at Al Fulaij area Ibra Oman for The Public Authority of Electricity and Water executed Estimation and BOQ preparation with cost analysis for Tender Submission. KEY ROLES AND

RESPONSIBILITIES:

Conducting feasible studies to estimate material labor, cost and time.

Preparing, Negotiating and Analyzing cost of Tender.

Preparation of Tender Queries and Coordination with Client.

Responsible for taking of measurements from both tender and contractual drawings

Understanding the implication of Health and Safety Regulation.

Working on Pre contract and Post contract works for MEP works.

Preparation of Tender Rate work Breakdown.

Preparation of detailed Cost Implication for Variation.

Assisting Financial/Cost Control on Projects.

Re-measuring of high risk packages and key trades.

Attending meeting with Client and Consultant for finalizing billed Amount for Variation.

Maintain Records of the Project and communicate with relevant parties.

Preparing cash flow for ongoing projects with the provided schedule.

Valuing completed works and arranging payments.

Coordination of work effort.

Coordination with Planning and site team for creating cash flow for ongoing projects

Coordination with purchase team for up to date prices of relevant commodities for both estimation and variation works for project.

Liaison with client and Supplier for effective approval of material list for the successful completion of the project with utmost client satisfaction. PROJECTS INVOLVED THAT BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASK ASSIGNED:

Name of project : Construction of Police Complex at Mudhebie, Maqshin, Mahdha Oman. Organization : Durat Al Sahil Services and Trade LLC Client : Royal Oman Police

Main Project Features : Construction of the following building and services

Construction of Police Station with special utilities for prisoner management

Construction of officers Bed sit and Accommodation.

Construction of Kitchen and Service Yard.

Construction of Barracks

Construction of Recreation hall for officers.

Construction of Guard house and Watch tower.

Construction of Helipad.

Construction of the above buildings with all MEP works that includes: o Water Supply

o Waste Water and Sewage system

o Instillation of Small Power system

o Instillation Of complete HVAC system including Split, Package, Ductable and Cassette units.

o Instillation of Fire Fighting and Fire Alarm Systems o Instillation of CCTV, telephone and data system

o Instillation of complete Lighting and electrical systems

Construction and Instillation Of external Services such as o Water supply Services

o Sewage Water Services

o Fire Fighting Services

o CCTV and Data Control Services

o External Wiring and Irrigation Services

o Telephone and Main Frame Services

o Instillation of feeder Pillars and Diesel Generators o External light fitting for March Past ground and helipads Position held : MEP Quantity Surveyor

In charge of

Preparation of Material List.

Preparation of Variation Log

Preparation of Bills to be submitted to the client

Cost control of the project

Cross checking between approved drawing and site material requirement

Preparation of final bill with as built drawings. Name of project : Construction of Officers Accommodation at Al Kamil and Bidiya Oman. Organization : Durat Al Sahil Services and Trade LLC Client : Royal Oman Police

Main Project Features : Construction of Officers Accommodation and recreation hall that has

Water Supply

Waste Water and Sewage system

Instillation of Small Power system

Instillation Of complete HVAC.

Instillation of Fire Fighting and Fire Alarm Systems

Instillation of CCTV, telephone and data system

Instillation of complete Lighting and electrical systems Position held : MEP Quantity Surveyor

In charge of

Preparation of Material List.

Preparation of Variation Log

Preparation of Bills to be submitted to the client

Cost control of the project

Cross checking between approved drawing and site material requirement

Preparation of final bill with as built drawings. Name of project : Construction of Barracks and Recreation Hall at Nizwa Oman. Organization : Durat Al Sahil Services and Trade LLC Client : Royal Oman Police

Main Project Features : Construction of Barracks and Recreation Hall at Nizwa that has

Water Supply

Waste Water and Sewage system

Instillation of Small Power system

Instillation Of complete HVAC.

Instillation of Fire Fighting and Fire Alarm Systems

Instillation of CCTV, telephone and data system

Instillation of complete Lighting and electrical systems Position held : MEP Quantity Surveyor

In charge of

Preparation of Material List.

Preparation of Variation Log

Preparation of Bills to be submitted to the client

Cost control of the project

Cross checking between approved drawing and site material requirement

Preparation of final bill with as built drawings. Name of project : Construction of Office Building itower Al Khuwair Oman. Organization : Durat Al Sahil Services and Trade LLC Client : Gulf Muscat

Main Project Features : Construction of Office Building itower with 3 basement,7 floors and a Pent house that has

Water Supply

Waste Water and Sewage system

Instillation of Small Power system

Instillation Of complete HVAC.

Instillation of Fire Fighting and Fire Alarm Systems

Instillation of CCTV, telephone and data system

Instillation of complete Lighting and electrical systems

Instillation of Lifts and Conveyor System

Position held : MEP Quantity Surveyor

In charge of

Preparation of Material List.

Preparation of Variation Log

Preparation of Bills to be submitted to the client

Cost control of the project

Cross checking between approved drawing and site material requirement

Preparation of final bill with as built drawings Name of project : Expansion of Head office building Al Khuwair Oman. Organization : Durat Al Sahil Services and Trade LLC Client : Oman Gas Company

Main Project Features : Expansion of Head office building of Oman Gas Company that includes

Water Supply

Waste Water and Sewage system

Instillation of Small Power system

Instillation Of complete HVAC.

Instillation of Fire Fighting and Fire Alarm Systems

Instillation of CCTV, telephone and data system

Instillation of complete Lighting and electrical systems

Instillation of Lifts and Conveyor System

Position held : MEP Quantity Surveyor

In charge of

Preparation of Material List.

Preparation of Variation Log

Preparation of Bills to be submitted to the client

Cost control of the project

Cross checking between approved drawing and site material requirement

Preparation of final bill with as built drawings Name of project : Construction of Medical Centre at Maqshin Oman. Organization : Durat Al Sahil Services and Trade LLC Client : Ministry Of health

Main Project Features : Construction of Medical Centre at Maqshin Oman that includes

Water Supply

Waste Water and Sewage system

Instillation of Small Power system

Instillation Of complete HVAC.

Instillation of Fire Fighting and Fire Alarm Systems

Instillation of CCTV, telephone and data system

Instillation of complete Lighting and electrical systems

Instillation of Special Medical Instruments.

Position held : MEP Quantity Surveyor

In charge of

Quantity undertaking from given drawings to build up BOQ

Preparation of Bill of Quantities

Cost analysis for Materials.

Coordination with purchase department for material price list

Site visits with team

Name of project : Construction of Sewage Water treatment Plant at Raysuit Oman. Organization : Durat Al Sahil Services and Trade LLC Client : Public Establishment for Industrial Estates Main Project Features : Construction of Sewage Water treatment Plant that includes

Water Supply

Waste Water and Sewage system

Instillation of Small Power system

Instillation Of complete HVAC.

Instillation of Fire Fighting and Fire Alarm Systems

Instillation of CCTV, telephone and data system

Instillation of complete Lighting and electrical systems Position held : MEP Quantity Surveyor

In charge of

Quantity undertaking from given drawings to build up BOQ

Preparation of Bill of Quantities

Cost analysis for Materials.

Coordination with purchase department for material price list

Site visits with team

Name of project : Construction of Pipe line for ROP Camp at Ibra Oman Organization : Durat Al Sahil Services and Trade LLC Client : Public Authority of Electricity and Water Main Project Features : Construction of Pipe line for ROP Camp at Ibra that includes

Installation of HDPE pipe works

Installation of Valve chambers

Position held : MEP Quantity Surveyor

In charge of

Quantity undertaking from given drawings to build up BOQ

Preparation of Bill of Quantities

Cost analysis for Materials.

Coordination with purchase department for material price list

Site visits with team

Current Designation:

MEP Engineer and Quantity Surveyor at R.K.Conatructions Kanyakumari Dist. Name of project : Construction of Residential Building Organization : R.K.Conatructions Kanyakumari Dist. Main Project Features : Construction of Residential House Position held : MEP Quantity Surveyor And Engineer In charge of

Quantity undertaking from given drawings to build up BOQ

Preparation of Bill of Quantities

Cost analysis for Materials.

Coordination with purchase for material price list

Coordination of all MEP Works

ACKNOWLEDGEMENT:

I do herby certify that the above furnished particulars are true and correct to the best of my knowledge if I am given an opportunity to work for your esteemed organization, I shall do the utmost of my abilities and for the entire satisfaction of my superiors. Signature



Contact this candidate