Tushar Mankad
E-mail:adi2x6@r.postjobfree.com Phone: +917*********
Address:***, **** ***** *********, **** no 34/35 Divyam park, Behind Sanjeevni medical store, Khodiyar colony road, Jamnagar, 361006
Objective
To work in a challenging environment for a professionally managed and growth-oriented organization where my potentials and experience can be utilized to their maximum capacity.
Education
PGPEE (Electrical Engineering) 2013 — 2017
IIMT
Ahmedabad, Gujarat, India
Diploma in Electrical Engineering. 1986 — 1989
Polytechnic
Baroda, Gujarat, India
Skills
Knowledge of AB PLC, SCADA, Telephone Exchange, DCS.
Electrical construction and maintenance
Installation of Electrical & Electronic equipment.
Proficient in Computer Hardware and software installation.
Proficient software experience in Microsoft Word, Excel, Power point.
Fluent in English, strong communication and negotiations skills.
Good Knowledge of the Engineering, Estimation and Construction process.
Proven technical abilities and knowledge.
Total Experience:31 years.
IN INDIA 20 years
IN GULF 11 years
Work experience
SPIE OIL & GAS, QATAR Jan 2016 — Feb2020
Electrical Supervisor
Working in Dolphin project. Looking plant lighting PM/CM work distribution and fault finding in cable.
Offshore/ on shore PLC problem solving.
Approved as a PTW Supervisor.
Safety Training: -
H2S/BA, Working at Height,
Confined Space, Basic firefighting,
T-BOSIT OPTIO, First Aid & CPR
MANLIFT Operation & Safety
Take reasonable care of own health and safety and that of others in the workplace.
HEISCO, Kuwait Aug.2014 - Aug.2015
Electrical Supervisor
Main contractor – GS E & C,
Erection of 11KV, 3.3KV, LV panels, VSD panels, UPS system in substation.
Erection of cable tray, conduit, fire alarm and communication system as per drawing.
Erection of lighting system, small power system, earthing system of substation, compressor, refrigeration, pipe rack and tank area.
Handling of manpower of sub-contractor.
Adopt and followed KNPC safety standard.
KNPC approved PTW holder as a WSS.
Worked in Dealim, as an ‘Supervisor (E&I)’ in KOC telemetry project (EF 1717)
Installation of instrument.
Punch list clearing.
Electrical heat tracing installation including insulation of tubing.
Cable glanding, termination, clean earth and safety earth problem solving.
IMCO, Kuwait Sept.2013 — Mar.2014
Electrical Supervisor
Worked on elevated substation project (EF 1600) of KOC in Gathering Center.
Main contractor - SK E&C,
PMC–AMEC.
KOC approved PTW holder as a WSS.
Excavation of cable trench as per drawing, lying of cable, Glanding and termination.
Earthing, cat welding of earthing conductor, scanning of underground facility by using GPR (geo penetrating radar).
Handling of manpower of sub-contractor.
Adopt and followed KOC and KNPC safety standard.
Saudi BINLADIN Group, Saudi Arabia. Feb.2009 — Aug.2013
Electrical Supervisor
Worked on Airport Project (Hajj Terminal)
Ensuring ECB, Lighting system, UPS up to 250KVA, Electronics equipment’s, Frequency converter related to Airport –Hajj terminal for smooth operation.
Ensuring Auto-Manual operation of stand by Diesel Generator in case of power failure.
Installation of Thermostat for AHU.
Man, Power handling
MV 13.8KV incoming including switchgear operation & maintenance.
Operation & Maintenance of VFD, soft starter for AHU.
Boosters pump panel operation & Maintenance.
Scheduling of PMI, CMI Work orders as per requirement through Maximo software.
Fault finding in electrical & electronics systems.
Handling of 400Hz Frequency converter
Worked as a work controller, in-charge of section head (Electrical)
Indian rayon (A unit of Aditya Birla Nuvo Ltd.) INDIA March 1995 — Feb. 2009
Deputy Engineer
Ensuring un-interrupted power supply to Rayon plant, Caustic Plant and Chemical Division.
Maintaining of 16.5 MW and 20 MW Power plant, Generation and distribution of 36.5 MW power.
Synchronizing and distribution of Power source from 12 MW of 8 no Diesel Generator sets and 3 MW from 4 no HF turbine.
Power source from PGVCL (GEB) 3.8 MW as hot standby.
Handling more than 25 nos. of Load Centers.
Handling more than 150 power panels for smooth running of equipment’s.
Handling motors up to 500 HP (375 KW), inverters (1 HP to 200 HP), soft starter up to 1000 A, auto transformers starters, Heaters elements up to 400 kw, ACB, BOCB, VCB up to 2500 A.
Handling of spinning pot motors (500V, 133 Hz, 2 pole and 4 pole)
Erection of DG sets, TG sets, Protection system, power panels, Auto change over system, etc.
Well conversant with Electrical Power Measuring System (EMS).
Programming and troubleshooting of PLCs of yarn washing section, Hydro extractor section, Air Compressor and Bag Weighing system.
Operation and maintenance of Solenoid valves, Pressure switch, Annunciator, DCS, 20 KVA UPS.
Maintenance of Power panels, Starters, Motors, DG sets, TG set etc.
Power saving through CAPEX schemes, by installing energy efficient motors, implementing control loop circuit inverter to control tanks level, fluid pressure and temperature and by self-monitoring.
Maintaining of Telephone Exchange of 500 lines, EPABX system and PA system, Pager system, Walky-Talky, Wireless system.
Work on up gradation of exchange up to 1000 lines, Utilization of LAN system for exchange and EMS.
Reduction of down time of equipment’s. Improvement in MTBF and MTTR
Power consumption reduced by implementing different method utilization such as soft starting of equipments, energy efficient motor replacement.
Installation of VFD
Installation of CCTV camera with networking.
Trained in Yokogawa DCS CS-3000 R 3.08 fundamental & engineering at Yokogawa Bangalore.
Installation, operation and maintenance of PLC
Involved right from awareness about ISO 9000 / ISO 14001 to certification of Quality & Environmental Management Systems.
Exposure in Documenting the Quality & Environmental Management Systems.
Involved in WCM, TPM, system
Well conversant in Trouble shooting and fault finding in computers
Implementation of Total Productive Maintenance, WCM (World Class Manufacturing developed by Aditya Birla Group)
Operating of SAP system
M/s Third Wave systems, INDIA Jan.1995 — Mar. 1995
Service Engineer
Installation & Repairing of Leaser jet, Ink jet and Dot matrix printers.
M/s Eureka Forbes, INDIA Sep.1994 — Dec. 1994
Sales Executive
Selling of AQUAGUARD water purifier.
United network, INDIA Feb.1994 —Sept. 1994
Service Engineer
Installation, Servicing, Repairing of Line driver, Multiplexers
Network Limited July.1990 to Feb.1994
Customer Support Executive
Installation, Servicing, Repairing of Electronic Typewriters & FAX.
Ravi Micro Electronics & Control, INDIA July.1989 —July.1990
Trainee Engineer
Repairing & testing of electrical & electronics instruments.
Languages
English
Gujarati
Hindi
Extra-Curricular Activities
Playing Cricket
Reading Novels
Listening to music Football
Traveling
Personal Data
Date of Birth: 30th November 1967
Sex: Male
Nationality: Indian
Marital Status: Married
Driving License: India / Saudi Arabia /QATAR
Passport No.: Z3083174
Issued at: Kuwait
Issue Date:10/05/2015
Expiry Date: 09/05/2025
Skype: adi2x6@r.postjobfree.com
Twitter: https://twitter.com/tush2109
Linkedin: https://www.linkedin.com/in/tushar-mankad-5814a2b