Post Job Free

Resume

Sign in

Manager Plant

Location:
Bilaspur, Chhattisgarh, India
Salary:
Negotiate
Posted:
January 01, 2021

Contact this candidate

Resume:

Vikas Mishra

Nuvoco Vistas Corp. Ltd. ( Formaly- Lafarge India Ltd.) Arasmeta Cement plant Township Gopal Nagar, Quarter No. D66 Dist.-Janjgir Champa Chhattisgarh E-Mail: adi2t5@r.postjobfree.com cell : 789-***-****, 917-***-****

Career Objectives :

● A challenging Career that utilizes my Experience, Skill and Creativity.

● To work in an environment where the Dedication, Determination and Discipline are the Fundamentals.

● To Contribute/ Support for the Social and Global Welfare/ Development Activities.

Academic Records :

● B.E. in Mechanical Engg.- With 65.4%[Year- 2007]- Passed from The National Institute of technology Raipur (C,G.).

● Certified Energy Manager by Bureau of Energy Efficiency, National productivity Council

Work Experience :

● Work Duration:

1) A s a .Engineer-Mechanical for the Ultra Tech Cement Ltd. Aditya Birla Group of Company at Hirmi cement Works, Designed By M/s. FL Smith Ltd. Denmark, Since August -2007 to Dec-2010.

2) As a Senior engineer from January-2011 to jun-2014 & from July 2014 to Dec.2017 as Asst. Manager at Ultratech cement Ltd Awarpur cement works Designed By M/s. FL Smidth Ltd. Denmark

3) As a Manager Plant Improvement & Reliability From Dec 2017 to Nov 2018, at Arasmeta Cement plant (Nauvoo Vistas Corp.- Formally Lafarge India Ltd.)

4) As a Manager ( Section In-charge ) Mechanical maintenance packing plant from Dec-2018 till now at Arasmeta Cement plant (Nauvoo Vistas Corp.- Formally Lafarge India Ltd.)

Responsibilities handled :

● Handling the Maintenance & Remodelling activities in a section, Condition monitoring of equipment/Carrying out Pro-Active& Preventive Maintenances.

● Planning and Scheduling for Maintenance Activities and Spare Parts Management for the given Section / Equipment.

● Generation and Implementation of Innovative & Productive Ideas to Improve the Availability and Trouble free operation of the Equipment. Root Cause Analysis & Trouble shooting in different Equipment.

● working in different sections, Kiln & Cooler, Cement Mill, Packing Plant, Raw mill, Mechanical Shif

& Plant reliability & improvement section during My 10 Year experience.

● Shutdown Attend of various Equipments like, Kiln, Grate Cooler,, UNIDIAN Ball mill For cement Grinding, ATOX-45 ATOX-27.5 Vertical Roller Mills for Raw Grinding & Coal mill, Material Handling Equipment, viz.- Bucket Elevators, Belt-Chain-Pan Conveyors, Process Fans etc.

Project Experience :

● Erection & commissioning of ESP Dust transport modification project which includes 4 screw conveyor 1 bucket elevator support structure and equipment erection planning and execution, material procurement and commissioning of system

●Erection of Pressurization and ventilation for cement mill phase 1 compressor room in which old concrete structure strengthening by fabrication and erection of guarders Suction fan, filters, pump, geared motor and ducting fabrication and erection work planning and executed.

●Erection & commissioning of packing plant upgradation project which includes 4 mechanical packer replacement with EEL make electronic packers & 8 nos of old L&T make wagon loading machine with EEL make WLM2027 model machine.

Present Responsibilities :

● Managing Planning & execution of packing plant maintenance activity in coordination with operation team.

● Spare planning & inventory management for section

● Identification of section improvement areas, Planning & execution of improvement jobs for increasing equipment reliability.

● Communicate & implement management expectation down the line & align the section as per management expectation.

Technical Skill :

● Knowledge of Man-Machine-Material Management aspects of Industry.

● Strong Base in Equipment Condition Monitoring, and Root Cause Analysis.

● Strong Background in Crisis Handling and System Adherence.

● Knowledge of Computerized Maintenance Management Systems and fundamentals, Professional Profile :

● Enthusiastic, Workaholic, Initiative, Eager to meet the challenges.

● Quick in Assimilating Latest Technologies, Skills, Concepts, and Ideas.

● Creative, Innovative and Optimistic.

● Proven Team-Worker with very good Communication and Motivation skills.

●Computer Awareness : SAP, M-S Office, Word, Excel, and Power Point.

Major Maintenance Jobs Done :

● Cement mill(Ball Mill) trunnion replacement

● Cement mil(Ball Mill)l trunnion bearing replacement,

● Reciprocating kirloskar compressor erection & maintenance.

● Cement mill(Ball mill) diaphragm liner, cell liner & head liner replacement & center diaphragm shifting,

● Cement mill(Ball Mill) Girth gear pinion replacement,

● Ball mill separator module replacement

● Kiln outlet pier support roller & Support roller bearing replacement

● Kiln shell replacement Near Middle Tyre high thickness shell joint area to towards outlet 12 Mtr Shell section

● Kiln tyre alignment, Inlet sector, Outlet sector, tong plate replacement, support roller skew correction, thrust measurement, kiln outlet seal lamella replacement

● belt conveyors, bucket elevator, grease spray systems, air slides, dust collectors,ESPs & pneumatic conveying system

● Chain elevator chain, sprocket, bearing,

● VRM separator lower plate replacement.

● Cooler grate plate, Side box, L box Pull rod, support roller, bull nose replacement.

● VRM ATOX-45 Gear box Complete over hauling, Bearing replacement High speed shaft replacement, Out put spline shaft replacement with new modified shaft. Erection and commissioning of pressurizing and ventilation system for compressor room Erection and commissioning of screw conveyor and bucket elevator project for cement mill improvement project.

Personal Profile :

● Date of Birth : 25/5/ 1986

● Marital Status : Married

● Language Known : English, Hindi

● Hobbies : Music & Book

● Present CTC : 15.66 lacs

● Expected CTC : Negotiable

I hereby declare that the particulars provided above are true to the best of My knowledge and belief.

Thanking You.

DATE-18.11.2019

Vikas Mishra



Contact this candidate