Post Job Free

Resume

Sign in

Engineering Power Plant

Location:
Philadelphia, PA
Salary:
140000
Posted:
December 31, 2020

Contact this candidate

Resume:

Thomas Rupp

PROFESSIONAL SUMMARY

More than twenty years of professional experience, including thirty-nine years with WorleyParsons, in financial management; project controls management, cost Control, planning/scheduling, EVM; mechanical and civil/environmental design; and construction for all forms of power generation facilities, Oil & Gas and other manufacturing facilities, Department of Energy, and municipal utility projects. Proficient in the use of Primavera P6 and P3, MS Project, FastTrack, Project-2, Artemis, and PREMIS scheduling software systems. Also, CPMIS, SAP, PRISM, Unifier, and PENTA cost/accounting systems.

TECHNICAL EXPERIENCE

Primavera P6 and P3, MS Project, FastTrack, Project-2, Artemis, and PREMIS scheduling, CPMIS, SAP, PRISM, Unifier, and PENTA cost/accounting

PROFESSIONAL EXPERIENCE

KELLY SERVICES/AIR PRODUCTS – Trexler Town, PA APR 2019 – OCT 2020

Project Planning Engineer

Assigned to support the EPCM integrated scheduling efforts on two ASU Units Value of $40m to $140m USD. Coordinated with Global engineering and supply teams.

PRIME TECHNICAL SERVICES/LONZA Biotech Remediation Project - Walkersville, MD

MAR 2018 – FEB 2019

Owner’s Project Scheduler

Assigned to support the EPCM integrated scheduling efforts on the NAO Remediation and Utilities Expansion Projects.

SPENCER-OGDEN/DCO ENERGY BEC II EXPANSION PROJECT - Bayonne, NJ OCT 2017-JAN 2018

Construction Scheduler

Assigned to support the construction and start-up of two simple cycle gas turbine generators at the Bayonne Energy Center Expansion Project.

EASI ENGINEERING AT PPL ELECTRIC UTILITIES T&S ENGINEERING - Allentown, PA

OCT2015- AUG 2017

Master Scheduler

Assigned to support the Transmission & Substation Engineering team to act as the P6 liaison between engineering and the project controls team.

Embedded with the relay protection and controls group and assisted with the NERC-CIP 5 Cyber Security program implementation for the major transmission substations.

LINDE ENGINEERING NORTH AMERICA – Blue Bell, PA MAY 2013 – OCT 2015

Project Performance Analyst

Assigned to prepare and maintain Level 3 project schedules & EVM for various LNG Equipment, Furnace and Reformer Facilities located in the USA and offshore including multiple Ethane cracking furnaces for the Shell Monaca processing facility valued at nearly $1 billion dollars.

WORLEYPARSONS - Reading, PA MAY 2005 – FEB 2013

Principal Project Controls Specialist

GE Inland Empire Energy Center, Riverside, California – Responsible for project controls and scheduling for the GE 7H combined cycle power facility for engineering. Duties include interfacing with GE and Calpine construction teams on the detailed integrated L3 schedule managed by GE.

Husky Energy Sunrise Thermal Project, Calgary, Canada - Responsible for project controls and scheduling for the Sunrise Oil Sands power facility for engineering. Duties include interfacing with Husky Energy and construction teams on the detailed integrated L3 schedule managed by Husky Energy.

PG&E, Colusa Generating Station – Responsible for project controls and scheduling for the combined cycle power facility for engineering.

Duties include interfacing with Gemma Power Systems and construction teams on the detailed integrated L3 schedule managed by Gemma.

Vung Ang Thermal Power Plant, Viet Nam - Responsible for project controls and scheduling for the Vung Ang power facility for engineering of the Turbine Building BOP support systems.

Duties include interfacing with Hanoi PMC and construction teams on the detailed integrated L3 schedule managed by Lilama.

Nuscale, Responsible for project controls and scheduling for the Front End conceptual design for the Modular Nuclear Power facility.

Duties include interfacing with NUSCALE on the detailed integrated L3 schedule.

CAMCE, El Vigia Generating Station, Venezuela - Responsible for project controls and scheduling for the combined cycle power facility for engineering.

Duties include interfacing with CAMCE, Corpoelec and construction teams on the detailed integrated L3 schedule managed by CAMCE, Beijing, China.

PARSONS I&T - Wyomissing, Pennsylvania 2000 - 2005

Senior Project Controls Engineer/Specialist

Business Manager, Financial Manager and Project Controls Manager for the Technology Sector – Responsible for overall coordination and management of program controls.

Procter & Gamble Paper Products, Mehoopany, Pennsylvania, Continuing Services Projects - Responsible for project controls and scheduling for multiple engineering and construction projects. Duties included onsite cost and schedule control on process, papermaking, converting, and Baby Care plant projects.

Grubb & Ellis Management Services, Poughkeepsie, New York Facilities Upgrade Program - Responsible for project controls and scheduling for multiple engineering and construction projects to support IBM Facility upgrades and modifications.

EDUCATION

A.S., Drafting and Design Technology

Electronic Institutes, Harrisburg, Pennsylvania

Specific Technical Expertise/Specialist Courses

Time Management, RACC,

MS Access,

USFAS, P&G,

Front End Engineering, P&G,

SQL Server, Worley Parsons,

Windows, Worley Parsons,

EXCEL, Worley Parsons,

dBase III+, Worley Parsons,

Condor, Worley Parsons,

Lotus 1-2-3, Albright College, 1986 and Worley Parsons,

Interactive Graphics System (CADD), Worley Parsons,

Fundamentals of Planning and Scheduling, Worley Parsons,

Foundations of Management, Worley Parsons,



Contact this candidate