Post Job Free
Sign in

Petroleum Engineering

Location:
Tomball, TX
Posted:
November 19, 2020

Contact this candidate

Resume:

DEREK ALLISON

Houston, TX

281-***-****

*****.*.*******@*****.***

linkedin.com/in/derek-r-allison

PETROLEUM ENGINEER

Business Acumen Strategic Planner Technical Competency Continuous Improvement Accomplished petroleum engineer with track record of successful asset development and management in secondary and tertiary recovery applications. Synergizes well with teams to provide value-add and risk mitigated projects through technical and economic evaluations for surface, subsurface, and reserves strategies. Demonstrated ability to adapt to current market conditions, generate new ideas, forge strong relationships, and maintain professional integrity and ethics. PROFESSIONAL EXPERIENCE

Occidental Petroleum Corporation, Houston, TX 01/2015 – 01/2020 Reservoir Engineer – Texas Permian Midland Basin – San Andres Carbonate – Slaughter Field Depletion plan, field development, business plan, reserves, waterflood (WF) and CO2 surveillance.

• Reduced CO2 injectant costs by 50% (700M$/yr) with WAG program and lower injection pressure.

• Added >1MMBOE PDP reserves by investigating high lift cost and recalibrating electrical meter.

• Forecasted NWMU phase 2 CO2 expansion (+5MMBOE PrbUD) for Oxy EOR 10-year plan.

• Created well work backlog, led well/pattern reviews, revised/captured well files and records

• 2019 Special Project – SAP: tested, multi-media communications, trained, end-user support.

• Enhanced oil recovery - miscible CO2 floods - CMU (1984) and NWMU (2008)

• Secondary recovery - waterfloods - Mallet-A (1960s) and TYU (1990s)

• Software: OFM, PEEP, LOWIS, Spotfire, Kappa Saphir, Oxy tools Kinder Morgan Production Company, Midland, TX 10/2011 – 11/2014 Reservoir Engineer – Midland Basin Eastern Shelf – Strawn Sands – Katz Strawn Unit (CO2 2010) Development program, field experience, CO2 flood surveillance, interventions, interpret cased and open hole logs, developed tools and performance metrics to understand and optimize reservoir performance.

• Optimized 20% CO2 injection and field development strategy with technical evaluations and tracers.

• Convert WF to CO2, barium sulfate, H2S, asphaltenes, WF/CO2 injectors, rod/ESP producers

• Software: Petra, WellView, DSS, SCADA, PETEX Suite, Aries, Kappa Saphir Swift Energy Company, LLC, Houston, TX 03/2011 – 10/2011 Field Engineer – Drilling and Pre-Completions – Eagleford Shale Supervised drilling operations, vendor relations, maintained drilling records (RIMBase), utilized Halliburton’s Landmark software, participated/lead various meetings, captured lessons learned.

• Supervised two Olmos, one Austin Chalk, three Eagleford wells with measure depths >15,000 feet.

• Acquired field experience while strengthening communication and team building skills. Derek Allison *****.*.*******@*****.*** Page Two

EDUCATION

Master of Science – Petroleum Engineering, Texas Tech University, Lubbock, TX, USA Bachelor of Science – Petroleum Engineering, Cum Laude, Texas Tech University Minor: Mathematics Fundamentals of Engineering Exam: Passed INDUSTRY CLASS / TRAINING

2015-2020:

• Internal Oxy: Basics of CO2 Pattern Management, Fundamentals of Petrophysics, Intro Classes – OFM, PEEP, Spotfire, LOWIS, Kappa’s Saphir, Petrel, SAP

• Oxy Tools: CO2 forecasting tools – DUScale and Pulser, Formation Parting Pressure Analysis, CRM - Capacitance-Resistance Model, IPL Analyzer, CO2 Optimization Tool, PerWell Economics, Nexus 2010-2015:

• Production Technology for Other Disciplines, Applied Reservoir Engineering, Foundations of Petrophysics, Well Test Design and Analysis, Stermole – Economic Evaluation and Investment Decision Methods, Dr. William Cobb’s Water Flooding: Performance Predictions and Surveillance, Production Geology for Other Disciplines, Introduction to Petra and DSS, Well Control School, Harbison-Fischer Pump School

PROFESSIONAL AFFILIATION

Member of Society of Petroleum Engineers



Contact this candidate