Post Job Free

Resume

Sign in

Welding Inspector 3.2.1, Having 10 years of experience.

Location:
Cheruvickal, Kerala, India
Salary:
14500 AED
Posted:
November 19, 2020

Contact this candidate

Resume:

DHANUKUMAR CHANDRAN SHEELA

Mechanical Engineer + CSWIP 3.2 (ADCO / GASCO Approved Sr. Quality Inspector) Mobile No: +***-**-****-553 / +***-**-****-507

E-mail ID: adhy5i@r.postjobfree.com

Mobile No (India): +91-954*******

Page 1 of 4

EDUCATIONAL BACKGROUND

B. Tech. (Mechanical Engg) : 2006 – 10, Kerala University, Kerala, India CSWIP 3.2 Sr.Welding Inspector: Cert No: 632890, Exp Date: 24 Sep 2024 CSWIP 3.1 Welding Inspector : Cert No: 63347/2, Exp Date: 21 Dec 2021 NDT Level II : Non Destructive Testing-2011(Jan)

HVAC : Heat Ventilation & Air Conditioning

Plus Two (Computer Science) : 2004-06(HSE Board, Kerala) Driving License, UAE : 2304450, Exp Date: - 22-08-2025

(Automatic)

NATIONALITY / D.O.B

Indian / 03-April-1988

EXPERIENCE IN CONSTRUCTION: 9+ Years in Oil & Gas Construction Industry PROFESSIONAL BACKGROUND

2019 to Present Employer : China Petroleum Engineering & Construction Corporation U.A.E Position : Sr. Quality Inspector (Mechanical Piping) Project : Bab Integrated Facilities Project

Client : ADNOC

2016 to 2019 Employer : Arabian Construction Company U.A.E Position : Sr. Quality Inspector (Mechanical Piping) Project : Al Dabb’iya Surface Facilities – Phase III Client : ADCO

2015 to 2016 Position : Quality Inspector (Mechanical Piping) U.A.E Project : Strategic Water Storage/Recovery – Liwa Project Client : TRANSCO

2014 to 2015 Position : Quality Inspector (Mechanical Piping) U.A.E Project : Ruwais –Pig Trap System for 6” (C3) and 20” (C2) Export Lines to Borouge

Client : GASCO

2014 to 2014 Position : Quality Inspector (Mechanical Piping) U.A.E Project : Fujairah F1 Reverse Osmosis Design, Build, Operate Project Client : SEMBCORP

2013 to 2014 Position : QC Inspector (Mechanical Piping) U.A.E Project : EPC for Procurement & Installation of NGL Pipeline Pumps

&Allied Works at ASAB-0

Client : GASCO

DHANUKUMAR CHANDRAN SHEELA

Mechanical Engineer + CSWIP 3.2 (ADCO / GASCO Approved Sr. Quality Inspector) Mobile No: +***-**-****-553 / +***-**-****-507

E-mail ID: adhy5i@r.postjobfree.com

Mobile No (India): +91-954*******

Page 2 of 4

2012 to 2013 Position : Welding Inspector (Mechanical Piping) U.A.E Project : Strategic Water Storage/Recovery – Liwa Project Client : TRANSCO

2011 to 2012 Employer : Steel World Engineering Works, Mangalore INDIA Position : Welding Supervisor

Project : Mangalore Refinery Expansion, India

2010 to 2011 Employer : United Construction Company INDIA Position : Site Supervisor

Project : Cochin Refinery Maintenance Works

CURRENT RESPONSIBILITIES

o Implement the QA/QC management system at site.

o Carryout and Coordinate quality inspections.

o Project Material Inspection with the approved data sheets, like Pipe, Plate and all the fittings and fasteners etc. with approved purchase order, client specification, approved drawings, applicable Code & Standards.

o Knowledge in the materials as CS, LTCS, SS, INCONEL, SDSS, GRE, PVC. o Welder Qualification Witness and approval of Welder. o Preparation of Welder Certificates and ID cards with respect to the approved WPS and standards. o Monitoring of consumable storage, handling, packing and drying temperature as per project approved procedure.

o Inspection on Painting activities like HSS, Paint Application. o Raising Non Conformity Report to the sub contractors. o Co-ordinating with Customer representatives & various Third Party Inspection for Testing and NDT activities.

o Installation inspection for Static & Rotating equipments based on the approved project specification.

o Monitoring NDT Activities like DPT, MPT, UT, HT, FT, PMI, PWHT & PAUT. o Monitoring of Pre heat, Inter pass temperature and inter pass cleaning as per WPS. o Monitoring Electric Furnace PWHT, Hardness checking, PMI checking of pipe spools. o ISO/Mechanical clearance of fabricated pipe spools, erected spools and structural. o Witnessing of Hydro test and Pneumatic test and Post test Re-instatement. o Monitoring the Disinfection activity for Pipeline, Piping and Well Disinfection. o Witnessing of Bolt Torquing and Re-Instatement as per the final As-Built. o Preparing As-Built drawings after final completion of Construction and get it approved. o Test Pack review and documentation

o Monitoring to the Final Documentation Preparation works (FICD Works) o Weekly/Monthly QA/QC Tool Box talking with workers. o Check the Calibration of welding and painting related instruments in a regular way. DHANUKUMAR CHANDRAN SHEELA

Mechanical Engineer + CSWIP 3.2 (ADCO / GASCO Approved Sr. Quality Inspector) Mobile No: +***-**-****-553 / +***-**-****-507

E-mail ID: adhy5i@r.postjobfree.com

Mobile No (India): +91-954*******

Page 3 of 4

DETAILS ABOUT THE MAJOR PROJECTS WORKED

Project: EPC FOR AL DABB’IYA FACILITIES DEVELOPMENT PHASE III. Position: Quality Inspector (Mechanical Piping)

Scope: Sub Contractor

The project is related to facilities development of AL DABB’IYA PHASE III. Fabrication and installation of Onshore CPP North, CPP South and Cluster piping’s and accessories. Involving materials are CS, LTCS, SS, SDSS, Alloy, Titanium, LTCS Alloy Cladded. It is more than 1Milion inch Diameter with more than 500 Tie- In joints and included structural works, etc…

Project: EPC for Pig Trap System Installation for 6" (C3) & 20" (C2) Export Line from GASCO to BOROUGE Position: Quality Inspector (Mechanical Piping)

Scope: EPC

GASCO supplies raw ethane through a 20” (C2) pipeline and propane through a 6” (C3) to Abu Dhabi Polymers Company Limited (Borouge). The pigging operations for these lines are performed at present using temporary pigging arrangements. Therefore, to enable online monitoring of the pipelines through means of intelligent pigging, COMPANY decided to provide permanent pigging facility for each of the lines (raw ethane and propane).

Project: Fujairah F1 Reverse Osmosis Design, Build, Operate Project Position: Quality Inspector (Mechanical Piping)

Scope: Sub Contractor

Within the existing F1 Plant premises, F1 Project Company intends to construct Sea-Water reverse Osmosis Desalination Plant for producing Drinking Water (RO Project). Project involves the GRP piping which involves various sizes between DN25 to DN2400. RO Plant is situated in the Gulf of Oman coast close to the existing FEWA Plant.

Project: Installation of NGL Pipe Line Pumps and Allied Works at ASAB 0 Position: QC Inspector (Mechanical Piping)

Scope: Sub Contractor

GASCO intends to replace Asab-0 NGL pipeline pumps tag # 24-G-602 A/B due to reliability and design obsolescence concerns on these critical pumps, which are 28 years old. Arabian Construction Co. (ACC) is appointed by Litwin PEL to execute the Construction and pre commission Works which includes the construction of substation, installation of new pumps, piping, E&I works, shut down, tie-ins, demolition and pre commission activities.

Shutdown Experience in GASCO ASAB-0

During 2014 January shutdown works at ASAB-0 coordinated ACC’S shutdown tie-in welding works. Major scope was tie-in on 16”, 14”, 10” NGL lines followed with utility tie-ins. Also coordinated the replacement of 4” lines on the pipe rack. During shutdown works coordinated all tie-in welding works and their inspections by NDT subcontractors as well as GASCO TPI and Inspection team of end-user. Coordinated with Piping Engineers for the timely completion of welding and the inspection of weld joints followed with NDT inspections. Witnessed torque inspections of flanged joints. Shutdown was completed successfully without any leaks.

DHANUKUMAR CHANDRAN SHEELA

Mechanical Engineer + CSWIP 3.2 (ADCO / GASCO Approved Sr. Quality Inspector) Mobile No: +***-**-****-553 / +***-**-****-507

E-mail ID: adhy5i@r.postjobfree.com

Mobile No (India): +91-954*******

Page 4 of 4

Project: Strategic Water Storage and Recovery Project (Pipeline / Piping Works) – LIWA–Abu Dhabi Position: Quality Inspector (Mechanical Piping)

Cost : 1.6 billion

Manpower at peak – 4000+

Scope: ACC-POSCO Joint Venture (Contractor)

The objective of the project is to infiltrate and store 27 million cubic meters of desalinated water in natural underground aquifers to form a strategic reserve that can be recovered and used in an emergency condition. The project design, supply, construction and commissioning of 200 water wells, 160km of interconnecting piping and transfer pipeline( 48” and 36” dia.), five pumping stations, MV and LV sub stations, 500 km electrical and instrumentation cables with DCS and SCADA control system. CERTIFICATIONS/ COURSES AND SEMINARS ATTENDED

o Defensive Driving Training (ADSD) training from approved third party 2016 o Permit To Work (JP) training from approved third party 2016 o Basic Fire Fighting (BFF) training from approved third party 2016 o Basic First Aid training from approved third party in 2015 o H2S Course training from approved third party 2016 o Confined Space Entry Training from TUV in 2014

o Permit To Work (PTW), from Safety Zone in 2015

IT SKILLS:

Microsoft Office

AMOGH System Software Awareness

Certificate in Electronic Office (CEO), DTP

PERSONAL DETAILS:

Age : 32 Years

Sex : Male

Marital Status : Married

Languages : English, Hindi, Tamil & Malayalam

Passport No : T 9921177

Expiry Date : 15-Nov-2019

Issue Date : 14-Nov-2029

Address : Gurunivas, Valiyakattackal,

Venjaramoodu, P.O, PIN: - 695607

Trivandrum, Kerala, INDIA.

DECLARATION:

I solemnly affirm that the above furnished particulars are true to the best of my knowledge and belief. Date: 04-May-2020

Place: Abu Dhabi -DHANUKUMAR.C.S-

1

Sivakumar Periasamy

From: Yehya Salah Eldin El Demiri (ADNOC Onshore - PSD) <adhy5i@r.postjobfree.com> Sent: Tuesday, September 17, 2019 2:17 PM

To: Sivakumar Periasamy

Cc: Abdelraouf Soliman (ADNOC Onshore – BIFP); Wang Hui; Vishnukumar Thirumal

(ADNOC Onshore – BIFP)

Subject: RE: CV of Mr. Dhanukumar Chandran Sheela – QC Welding Inspector Attachments: CV of Mr. Dhanukumar Chandran Sheela - QC Welding Inspector.pdf ADNOC Classification: Internal

Dear Siva,

Proposed candidate is acceptable without probation based on his previous experience with ADNOC projects. Regards.

Yehya Salah Eldin El Demiri

Project Services Division

P O Box 270, Abu Dhabi, UAE

T +971-*-*******

Email: adhy5i@r.postjobfree.com

www.adnoc.ae ADNOC Onshore

From: Sivakumar Periasamy <adhy5i@r.postjobfree.com>

Sent: Monday, September 16, 2019 11:31 AM

To: Yehya Salah Eldin El Demiri (ADNOC Onshore - PSD) <adhy5i@r.postjobfree.com> Cc: ayoub zehri <adhy5i@r.postjobfree.com>; Abdelraouf Soliman (ADNOC Onshore – BIFP)

<adhy5i@r.postjobfree.com>; adhy5i@r.postjobfree.com; Wang Hui <adhy5i@r.postjobfree.com> Subject: CV of Mr. Dhanukumar Chandran Sheela – QC Welding Inspector Dear Yehya,

Please find the attached CV of Mr. Dhanukumar Chandran Sheela – QC Welding Inspector for your review and approval. Kindly let us know your comments.

Thanks and Regards,

Sivakumar Periasamy

QA/QC Site Focal Point

BAB Integrated Facilities Project



Contact this candidate